1972 Chevrolet Monte Carlo on 2040-cars
Livonia, Michigan, United States
Transmission:Automatic
Vehicle Title:Clean
Engine:350cid 4BBL V8
Fuel Type:Gasoline
VIN (Vehicle Identification Number): 1H57H21531153
Mileage: 20794
Number of Cylinders: 8
Model: Monte Carlo
Exterior Color: Black
Make: Chevrolet
Drive Type: RWD
Chevrolet Monte Carlo for Sale
1971 chevrolet monte carlo(US $10,619.71)
1987 chevrolet monte carlo(US $8,100.00)
1970 chevrolet monte carlo(US $23,500.00)
1987 chevrolet monte carlo(US $4,900.00)
1973 chevrolet monte carlo(US $5,900.00)
1970 chevrolet monte carlo(US $13,000.00)
Auto Services in Michigan
Winners Auto Service Inc ★★★★★
Wally`s Garage ★★★★★
Vehicle Accessories ★★★★★
Vanderhaag Car Sales ★★★★★
Used Car Factory Inc ★★★★★
University Auto Care ★★★★★
Auto blog
Man surprises girlfriend with C7 Corvette
Mon, 07 Oct 2013How would you react if someone just showed up at your place of work with a new, 2014 Chevrolet Corvette Stingray, complete with all the trimmings? While a lot of us would likely be flipping out over the still rare sports car, it's a fair bet many more of us would be responding like Pattie here, whose boyfriend stopped by her work to show her her new C7.
Speechless and shocked as she seems, she does end up taking it out for a drive, despite claiming she wasn't really outfitted to handle the car's seven-speed manual transmission at the time. From the sound of the video, we got the impression that she knew the car was coming, just not that it was anywhere near ready for delivery. It also, as Pattie says, seems like her boyfriend is more excited about the car than she (which, can we blame him?). Take a look down below for the full video of this C7 Stingray delivery.
Vert-A-Pac train cars kept your Chevy Vega's price in check
Fri, 01 Mar 2013Our apologies to those who've seen this before, but for the rest of the class, how awesome are these pictures of the Vert-A-Pac shipping system General Motors came up with to ship the Chevrolet Vega back in the 1970s? Developed along with Southern Pacific Railroad, GM was able to double the amount of Vega models it could ship by packing them into the unique storage cars vertically.
At the time, rail cars could fit 15 vehicles each, but Chevrolet was able to lower shipping costs by making it possible to ship 30 Vegas per rail car, in turn allowing the price of the Vega to remain as low as possible. Each rail car had 30 doors that would fold down so that a Vega could be strapped on, and then a forklift would come along and lift the door into place. All the cars were positioned nose down, and since they were shipped with all of their required fluids, certain aspects had to be designed specifically for this type of shipping, including an oil baffle in the engine, a special battery and even a repositioned windshield washer reservoir. See for yourself in our image gallery above.
UAW rejects GM contract proposal but makes a counter offer
Tue, Oct 1 2019The United Auto Workers union said a new comprehensive offer made by General Motors Co late Monday to end a two-week-old strike was not acceptable and said it had made a new counterproposal. UAW vice president Terry Dittes said in a letter to members "there are many important issues that remain unresolved." The union is awaiting GM's next proposal. He said GM's offer came up short on many issues. Dittes said GM made a "comprehensive proposal" at 9:40 p.m. Monday. "This proposal that the company provided to us on day 15 of the strike did not satisfy your contract demands or needs. There were many areas that came up short like health care, wages, temporary employees, skilled trades and job security to name a few." Dittes is the union's vice president for GM relations and the UAW's lead negotiator in these contract talks. "We have responded today with a counterproposal and are awaiting GM's next proposal to the union," he wrote. "Regardless of what is publicized in print or social media, etc., there are still many important issues that remain unresolved." The strike, in its third week, has cost GM more than $1 billion, according to J.P. Morgan analyst Ryan Brickman. He said the cost per day in potential profit is $82 million. However, another analysis, by East Lansing-based consultant Anderson Economic Group, put the losses at $25 million a day. And the effects of the strike are expanding. GM said Tuesday the strike has created a parts shortage that forced the automaker to halt production at its pickup and transmission plants in Silao, Mexico, temporarily laying off 6,000 workers. Silao is where GM builds its highly profitable four-door crew cab Chevy Silverado and GMC Sierra pickups. The strike has also forced GM to idle some Canadian workers, and many suppliers have been forced to halt operations. About 48,000 UAW members went on strike on Sept. 16 seeking higher pay, greater job security, a bigger share of the leading U.S. automaker’s profit and protection of their healthcare.Â







































