1952 Chevrolet Bel Air/150/210 Coupe on 2040-cars
Walker, Louisiana, United States
Send me questions at : bodyco@lavache.com
1952 Chevrolet Bel Air/150/210 Coupe
Fuel Injection System MSD Ignition System /Power Steering/ Hydraulic Front Disc Brakes
55 Chevy 325 Rear/76 Chevy 3 Speed Transmission/Blue Tooth Radio System/
12 Volt Conversion Electrical System /Imported Tobacco Italian Leather Interior***New Working A/C
Chevrolet Bel Air/150/210 for Sale
1957 chevrolet bel air/150/210(US $18,900.00)
1955 chevrolet bel air/150/210(US $22,000.00)
Bel air(US $22,000.00)
1957 chevrolet bel air150210 chrome(US $15,750.00)
1957 chevrolet bel air150210 nomad(US $17,600.00)
Clear(US $12,000.00)
Auto Services in Louisiana
Walker`s Wrecking Yard & Auto Parts ★★★★★
Walker Tire ★★★★★
Upholstery Limited ★★★★★
Universal Diesel Service ★★★★★
Tropical Car Wash & Brake Tag Station ★★★★★
Supreme Collision & Towing ★★★★★
Auto blog
Chevy confirms 2016 Camaro will have wheels, brakes
Thu, Apr 9 2015Good news, everyone! Chevrolet has issued yet another round of teaser images and information about the sixth-generation Camaro, set to debut in Detroit on May 16. This time around, Chevy's teaser images confirm that the new car will not only have wheels and tires (Goodyear Eagle F1s, no less), but brakes as well. On top of that, we now know that the new Camaro will be 28-percent stiffer than the outgoing model. "The more rigid body structure allowed the engineers to more precisely calibrate the steering and suspension systems because they didn't have to compensate for chassis flex. The lighter structure also enabled the size and mass of elements such as the wheels, tires and brakes to be scaled accordingly," GM said in a press release, which you can read below. We've already learned that the new coupe will be 200 pounds lighter than its predecessor, has a bunch of unique parts, and according to GM's Mark Reuss, will outperform the Ford Mustang in every way. Now, it's only a matter of time before we see the sixth-gen Camaro, but surely not before Chevy issues even more teasers and information. Related Video: 2016 Camaro is Stronger, Lighter and More Responsive Computer aided engineering contributes to 28 percent greater structural stiffness DETROIT – The engineering team spent 9 million hours of computational time honing the driving experience of the all-new 2016 Chevrolet Camaro before the first prototype turned a wheel. The structural modeling led to the Gen 6 Camaro being 28 percent stiffer than the current model. "The modeling abilities of computer aided engineering are advancing at incredible rates," said Jim Karlavage, Camaro program engineering manager. "Today, we can accurately model opportunities to add torsional strength without adding unnecessary mass. The result is a lighter, stiffer structure that benefits every aspect of the driving experience." The more rigid body structure allowed the engineers to more precisely calibrate the steering and suspension systems because they didn't have to compensate for chassis flex. The lighter structure also enabled the size and mass of elements such as the wheels, tires and brakes to be scaled accordingly. "The structural weight savings are compounded by opportunities to reduce un-sprung weight," said Karlavage.
GM laying off more than 4,000 workers Monday morning
Sat, Feb 2 2019According to reports from Automotive News, The Detroit News, and CNN, General Motors plans to begin laying off more than 4,000 salaried workers starting Monday morning. In a statement to AN, a spokesperson for the automaker said, "We are not confirming timing. Our employees are our priority. We will communicate with them first." We've been expecting layoffs at General Motors since November, 2018. At the time, the Detroit-based automaker announced it would seek to shed 8,100 salaried employees, shut down five assembly plants in North America, and kill off several slow-selling models. One month earlier, GM offered buyout packages to 18,000 workers and said it would seek to cut its global workforce by 25 percent. A spokesperson said at the time the moves were "proactive steps to get ahead of the curve by accelerating our efforts to address overall business performance." The cost-cutting moves are expected to save GM up to $2.5 billion in 2019 and as much as $6 billion by 2020. David Kudla, CEO and chief investment strategist of Mainstay Capital Management, referred to the impending culling as "Black Monday" and told The Detroit News that the layoffs would begin around 7:30 a.m. and continue in waves throughout the coming days and weeks. GM plans to deliver on its fourth-quarter and full-year 2018 earnings report on Wednesday. President Donald Trump plans to deliver the annual State of the Union address a day earlier on Tuesday. We expect to hear plenty more from both sides over the next several days.
GM laying off 500 workers to slow Chevy Sonic production
Sat, Oct 24 2015Due to slow sales of the Chevrolet Sonic and Buick Verano, General Motors is cutting a shift at the Orion Township plant that builds the pair. The move lays off about 500 workers, but most of them are expected to get offers to transfer to other factories, Automotive News reports. The move came just a day after GM announced adding 1,200 employees to the Detroit-Hamtramck plant. GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there. With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year. While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.



