Find or Sell Used Cars, Trucks, and SUVs in USA

2013 Ford E-series Van Xl on 2040-cars

US $7,995.00
Year:2013 Mileage:100453 Color: Blue /
 Medium Flint
Location:

Frankford, Delaware, United States

Frankford, Delaware, United States
Advertising:
Vehicle Title:Clean
Engine:8 Cylinder Engine 5.4L/330
Fuel Type:Flex Fuel
Body Type:Full-size Passenger Van
Transmission:Automatic
For Sale By:Dealer
Year: 2013
VIN (Vehicle Identification Number): 1FBNE3BL9DDB00763
Mileage: 100453
Make: Ford
Trim: XL
Drive Type: E-350 Super Duty XL
Horsepower Value: 255
Horsepower RPM: 4500
Net Torque Value: 350
Net Torque RPM: 2500
Style ID: 353700
Features: 5.4L EFI FFV V8 ENGINE
Power Options: Pwr 4-wheel disc brakes, Pwr steering
Exterior Color: Blue
Interior Color: Medium Flint
Warranty: Unspecified
Disability Equipped: No
Model: E-Series Van
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto Services in Delaware

Wiley`s Car Care ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Diagnostic Service
Address: 737 Downingtown Pike, Talleyville
Phone: (610) 436-8800

Ted & Sons Body Shop ★★★★★

Automobile Body Repairing & Painting
Address: 111 Ridley Ave, Claymont
Phone: (610) 534-2299

Rex Carle Automotive ★★★★★

Auto Repair & Service, Emissions Inspection Stations, Automobile Inspection Stations & Services
Address: 291 Norwood Rd, Yorklyn
Phone: (610) 269-5050

Phil`s Auto Repair Inc ★★★★★

Auto Repair & Service, Tire Dealers, Automobile Air Conditioning Equipment-Service & Repair
Address: 601 Boxwood Rd, Winterthur
Phone: (302) 998-2121

Lewis Automotive ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Diagnostic Service
Address: 633 S Bolmar St, Yorklyn
Phone: (610) 696-3263

Just Tires ★★★★★

Auto Repair & Service, Tire Dealers, Auto Oil & Lube
Address: Marydel

Auto blog

Ford also working on 200-mile EV to compete with Bolt, Model 3

Fri, Mar 6 2015

The Chevrolet Bolt is on a lot of people's radars. You may have even noticed friends and colleagues who harbor very little interest in the automotive world, or anything labeled as "green," who have taken notice of a 200-mile electric vehicle coming out of Detroit. Mass appeal is the idea, after all. You can include Ford in the list of interested parties, in this case with the intention of taking direct aim at the Bolt – and, by proxy, the Tesla Model 3 – with an affordable, long-range EV of its own. Ford will unveil its own long-range EV, positioned to compete with Chevrolet, later this year, according to Automobile. Details are very scarce about Ford's plans, but we do know that the Bolt (or whatever the Chevy all-electric hatchback will end up being called) is expected to offer over 200 miles of driving between charges, with a sticker price around $30,000. The other major player, of course, is Tesla's smaller, more affordable sibling to the Model S. The Model 3, also slated to go on sale in 2017, should cost less than $40,000. While Tesla has established itself in the EV world, another long-range EV out of Detroit would win some customers from the California-based startup. For now, though, we'll just have to wait, as Ford remains tight-lipped about its plans for the car. Automobile predicts a possible unveiling at the Los Angeles Auto Show in November, what with California's EV mandate being a driver of strategy for various automakers. Most can agree, though, that a larger field of options – while not ideal for backers of the Bolt or Model 3 – will only benefit the car-buying public. Related Video: Featured Gallery Chevrolet Bolt EV Concept: Detroit 2015 Related Gallery Chevrolet Bolt EV Concept News Source: AutomobileImage Credit: Copyright 2015 Sebastian Blanco / AOL Green Rumormill Chevrolet Ford Tesla Electric Future Vehicles Chevy Bolt ford ev

Ford ready to install GE Wattstations at 60 locations in North America

Thu, Mar 20 2014

Upper-level Ford executives are sending mixed messages about the power of plug-in vehicles, but in the companies parking lots across North America, at least, the signal is clear: come on and charge your EV. Today, Ford and GE announced that the Blue Oval will be installing Wattstation chargers at its Dearborn HQ and will then add units at more than 60 locations across the US and Canada, including "offices, product development campuses and manufacturing facilities." If you're a Ford employee, then you get four hours of free charging a day. That should be plenty to top off any of the company's plug-in vehicles, even the Focus Electric, and the time limit encourages drivers to swap cars at lunch, because Ford wants to encourage charging station sharing and get more employees to plug in. Ford doesn't mention the DOE's Workplace Charging Challenge by name in the release (available below), but we suspect these Wattstations are part of that project. Ford was one of the founding members, joining the Workplace Charging Challenge on January 31, 2013. On that date, the Ford Motor Company and Ford dealers had over 1,750 charging stations installed on company/dealer property. Ford, GE WattStation Chargers Support Employee Electric Vehicle Charging Network Ford to install its first employee electric vehicle charging station network in Dearborn, Mich.; facilities across the United States and Canada to follow Ford will work with GE as its network provider and supplier of electric vehicle charging stations; networked stations will help Ford understand charging usage and plan for future installations Ford electrified vehicles have logged an estimated 65 million electric miles over the last 18 months. Ford now offers six electrified vehicles, including Focus Electric, C-MAX Energi and Fusion Energi plug-in hybrids, and C-MAX and Fusion hybrid vehicles Ford Motor Company in conjunction with GE, will supply vehicle charging stations at Ford facilities nationwide, beginning with facilities in and around its headquarters. The announcement continues the innovative cooperation begun more than 100 years ago between Henry Ford and Thomas Edison, co-founder of GE. This month, Ford will begin installing GE WattStation™ charging stations across its North American campuses, developing a workplace charging network at nearly every Ford facility in the United States and Canada.

Submit your questions for Autoblog Podcast #329 LIVE!

Mon, 15 Apr 2013

We're set to record Autoblog Podcast #329 tonight, and you can drop us your questions and comments via our Q&A module below. Subscribe to the Autoblog Podcast in iTunes if you haven't already done so, and if you want to take it all in live, tune in to our UStream (audio only) channel at 10:00 PM Eastern tonight.
Discussion Topics for Autoblog Podcast Episode #329
Subcompact sales slump, yet again