Bronco Southern California on 2040-cars
Claremont, California, United States
|
SOUTHERN CALIFORNIA 5.8L V-8
110,300 MILES |
Ford Bronco for Sale
1978 ford bronco ranger xlt(US $10,000.00)
1989 fullsize ford bronco w/ pop-up camper
1977 ford bronco 4x4 302ci v8 - early classic bronco
***1974 ford bronco sport***(US $19,900.00)
1984 ford bronco xlt 5.0(US $11,000.00)
1974 ford bronco(US $11,500.00)
Auto Services in California
ZD Autobody ★★★★★
Z Benz Company Inc ★★★★★
Www.Bumperking.Net ★★★★★
Working Class Auto ★★★★★
Whittier Collision Center #2 ★★★★★
West Tow & Roadside Servce ★★★★★
Auto blog
New Ford GT to carry $400k-price tag
Thu, Mar 5 2015The last time Ford made a GT, it built more than 4,000 of them and sold each one for around $150,000. Judging by the premiums at which they later traded, they were evidently worth a lot more than that. But this time, the new Ford GT will be far more expensive and far more scarce. Official performance, production and pricing figures have yet to be released, but upon the new American supercar's European debut in Geneva, Ford performance chief Dave Pericak indicated it would be priced competitively with the Lamborghini Aventador – which carries a base sticker price approaching $400,000, Car and Driver reported. Combine that with production expected to number in the hundreds, not the thousands, and you're not likely to be seeing any of these Blue Oval halo cars in your neighborhood anytime soon. The question then becomes: will the price tag will be justified? With carbon-fiber construction and more than 600 horsepower on tap, it very well could be. And if speculators are going to drive up the actual sale prices, we don't see why Ford shouldn't get what the product is worth. But whether the world is ready for a $400,0000-Ford is another question entirely. Related Video:
Shelby GT500 and Roush Stage 3 go head to head at the drag strip
Wed, 07 Aug 2013The Ford Mustang is a brilliantly affordable source of horsepower, with a base 300-plus-horsepower version available for well under $30,000. Jumping up to about $35,000 will get you a solid 420 horsepower from a high-revving V8, while those with some extra disposable income can get a pair of 600-plus-horsepower monsters. Both the Roush Stage 3 with its Phase 3 package and Ford's factory Shelby GT500 even crest the 650-horsepower mark, with 675 and 662 ponies, respectively.
Naturally, someone needed to find out which of these hi-po Mustangs was the quickest. And while this video is quite obviously a dealership commercial, at least there's some solid drag racing between two of the most powerful performance machines available for under $100,000.
With two NHRA drag racers at the wheel, the Stage 3 and GT500 go head to head for three races. Scroll down below to see the results in the full video.
FCA, Ford idle plants due to semiconductor shortage
Fri, Jan 8 2021DETROIT (Reuters) - Ford and FCA will become the latest automakers to idle production facilities due to a semiconductor shortage. Ford's Louisville Assembly Plant in Kentucky will idle for a week, borrowing a down period from later in the year to compensate. Per Automotive News, FCA is idling its Brampton facility in Ontario, Canada, and one other site which has not yet been identified. Louisville Assembly is the production site for the Ford Escape and Lincoln Corsair SUVs; Brampton Assembly produces the Chrysler 300, Dodge Charger and Dodge Challenger for FCA. A Ford spokeswoman, who declined to identify the semiconductor supplier, confirmed the temporary shutdown to Reuters. In this, FCA and Ford join Nissan and potentially Honda in idling production in the wake of the shortage, which also hit Volkswagen late last year. The shortages are being blamed on consumer demand for silicon after production slowdowns resulting from the coronavirus pandemic. Volkswagen said it had to adjust production schedules in China, Europe and North America to compensate. Nissan said it planned to reduce production of the Note, a hybrid electric car, at its Oppama Plant in Kanagawa prefecture, Japan, but did not give details of the scale of the output cut. The Nikkei newspaper reported that Nissan would slash its Note production at Oppama to about 5,000 units in January, from an initially planned 15,000 units. "A global shortage of semiconductors has affected parts procurement in the auto sector. As a result of this shortage, the Oppama Plant in Japan will adjust production in January, reducing production of the Nissan NOTE," Nissan said in a statement. (This article contains reporting from Reuters.)   Auto News Plants/Manufacturing UAW/Unions Chrysler Dodge Ford




















