2009 Ford E-350 Commercial W/ Rear Storage Great Work Van on 2040-cars
Dallas, Texas, United States
Engine:8
For Sale By:Dealer
Transmission:Automatic
Body Type:Other
Warranty: Vehicle does NOT have an existing warranty
Model: E-Series Van
Mileage: 96,425
Disability Equipped: No
Doors: 2
Drive Train: Rear Wheel Drive
Ford E-Series Van for Sale
2008 ford e-350 cutaway commercial vehicle w/ rear storage(US $24,888.00)
2004 ford e350 utilimaster step van low low miles in virginia(US $19,500.00)
2011 e-350 passenger van rear park aid 32k low miles we finance!(US $19,912.00)
2008 ford econoline e350 31' bucket van 5.4l v8 altec at200av boom truck a/c
1993 ford e-150 econoline quality coach conversion high top 5.8l low miles!
1998 ford e-250 econoline extended cargo van --- no reserve -- fl unit!(US $5,500.00)
Auto Services in Texas
Whatley Motors ★★★★★
Westside Chevrolet ★★★★★
Westpark Auto ★★★★★
WE BUY CARS ★★★★★
Waco Hyundai ★★★★★
Victorymotorcars ★★★★★
Auto blog
Ford taps Canada-based Multimatic to build carbon fiber Ford GT
Mon, Feb 16 2015Ford has given Canadian firm Multimatic the nod to build the carbon fiber body on the new GT – The Blue Oval says it has worked with this company for 30 years. The global supplier provides parts and engineering to various automakers, and while based in Markham, Ontario it has 12 plants in Canada, the US, Mexico, England, and China. When announcing the decision at the Canadian International Auto Show, Ford says it chose them "because they have specialized equipment for carbon fiber production and expertise in carbon fiber assembly," and we've heard that the 600-horsepower coupe will be produced in a purpose-built facility at Ford's factory in Markham. Even better than that – for GT purposes and for possible hints at a Le Mans run – the Multimatic Motorsports division can be contracted for engineering and race team management. They currently produce the Boss 302R racecar in the Continental Tire SportsCar Challenge, worked on the FR500C, and their Multimatic Motorsports Lola B2K/40 won its class at the 24 Hours of Le Mans in 2000. The first models will roll off the line at the end of next year. Production numbers are rumored to be in the low hundreds, with a six-figure price tag around $200,000. They'll go into production in time for some sort of 50th anniversary celebration of the GT40 taking the the top three spots at Le Mans in 1966. Related Video: Featured Gallery 2017 Ford GT: Chicago 2015 View 30 Photos News Source: CBCImage Credit: Live images copyright 2015 Drew Phillips / AOL Plants/Manufacturing Ford Coupe Luxury Performance Multimatic
Ford extends shutdown, Stellantis confirms layoffs due to chip shortage
Thu, Apr 22 2021Ford and Stellantis this week announced new production cuts due to the global semiconductor shortage, with popular models including the Ford F-150 and Jeep Grand Cherokee facing cuts. Stellantis plans to temporarily lay off workers at one facility as production is curtailed. According to Automotive News, Ford is extending shutdowns at some of its North American facilities into May. The Blue Oval has been forced to reduce or idle production of both its redesigned F-150 pickup and the popular Explorer due to the chip shortage. The Mustang, Transit, Edge, Lincoln Nautilus and Aviator will also continue to be affected. Stellantis is planning to temporarily lay off workers at a Jeep plant in Detroit during April and May due to a shortage of semiconductor chips. The company will cut two work crews at its Jefferson North plant in Detroit for three weeks starting April 26, then call them back and lay off a third crew from May 17 through the week of May 31, according to a schedule obtained by Bloomberg News. The plant on Detroit’s east side normally operates two shifts with three work crews six days a week to keep it running 20 hours a day. “Stellantis continues to work closely with our suppliers to mitigate the manufacturing impacts caused by the various supply chain issues facing our industry,” company spokeswoman Jodi Tinson said in a statement. “Due to the unprecedented global microchip shortage, Jefferson North will adjust its production schedule through the end of May.” Jefferson North employs about 4,800 hourly workers and makes the Jeep Grand Cherokee, the top-selling Jeep model last year, and the Dodge Durango SUV. A redesigned version of the Grand Cherokee is scheduled to start production in August, according to researcher AutoForecast Solutions. This article contains reporting from Bloomberg. Plants/Manufacturing Ford Jeep Lincoln Technology chip shortage
Toyota hangs on to title of world's largest automaker for first half of 2013
Fri, 26 Jul 2013General Motors and Ford can have all the success they please, but it doesn't seem like America's two largest manufacturers are going to topple Toyota in the first half of 2013. According to Reuters, Toyota moved 4.91 million vehicles in the first six months of 2013, representing a 1.1-percent drop from the same period in 2012.
GM is on the rise, though, with a four-percent increase in global sales, to 4.85 million. Volkswagen, still sitting in third, saw a 5.5-percent jump to 4.7 million vehicles in the first half of 2013.
If this pace continues for Toyota, it'll finish 2013 in the top sales spot for the second year in a row. The manufacturer fell to third, behind GM and VW, in 2011 after earthquakes and tsunamis ravaged its production capacity.
