|
The SSR is in excellent condition inside and out.. Driven only in great weather and covered in our garage. The owners manual is included. If you have ANY questions or concerns or would like more pictures please contact us. |
Chevrolet SSR for Sale
2003 chevrolet ssr convertible ~ low miles ~ supercharged ~(US $24,995.00)
2005 chevrolet ssr base convertible 2-door 6.0l
2006 chevrolet ssr convertible pickup final year 6.0 liter v8 automatic leather
Rare aqua blur metallic color - automatic - chrome wheels - running boards(US $20,500.00)
2004 chevrolet ssr convertible 2-door 5.3l
2005 chevrolet ssr 6.0l with super-charger ! black beauty ! financing available
Auto Services in Wisconsin
Todd`s Automtv ★★★★★
Sturtevant Auto ★★★★★
Stephan`s Auto Repair ★★★★★
State Auto Sales ★★★★★
Scott`s Towing & Recovery ★★★★★
Schmelz Countryside Volkswagen/Saab Car Sales ★★★★★
Auto blog
Final C6 Corvette built in Bowling Green
Fri, 01 Mar 2013With all of the attention given to the 2014 Chevrolet Corvette Stingray lately, you could be forgiven for thinking that it's already well along in production, yet tooling up for the new C7 has only just begun. In fact, production of the outgoing C6 generation in Bowling Green, Kentucky just halted on Thursday.
As the C6 has aged, production numbers have predictably ebbed along with demand, but this year, the addition of the 427 and 60th anniversary models resulted in an uptick in vehicles built - this, despite a model year shortened by around 25 percent to accomodate the new model changeover. The final C6 Corvette ever, No. 13,466 built this year, was a white 427 Convertible destined for the General Motors Heritage Center museum. The car's 7.0-liter V8 heart was assembled by Corvette chief engineer Tadge Juechter himself.
In total, Bowling Green pushed out 215,100 C6 Corvettes over nine years. If you're still a C6 fan at heart and are hoping to get a good deal on a phase-out model, step lively - Chevrolet reportedly had about 6,100 unsold units, which Autoweek suggests is good for around five and a half months of supply at the model's current sales rates. Given that demand will likely slacken even further as the C7 draws closer, that should be a big enough stockpile to keep dealers satisfied until 2014 Stingrays begin showing up on their forecourts in December.
GM's labor deal with UAW union on verge of ratification
Thu, Nov 16 2023Nov 15 (Reuters) - General Motors' tentative labor deal with the United Auto Workers (UAW) union closed in on ratification as the votes were counted on Wednesday. Following the approval earlier in the day by more than 60% of union members at the Detroit automaker's large Arlington, Texas, assembly plant, additional votes in favor have the deal close to clinching majority approval. The number of union locals, most of which are smaller, still to report vote totals is not large. After several large assembly plants voted against the deal earlier on Wednesday, some media had reported the deal was heading toward failure. But Arlington's support, followed by strong voting in favor by smaller warehouse and parts facilities, has put the deal on the brink of approval. This would mark the first ratification of a deal, which runs through April 2028, with one of the Detroit Three automakers. Ford and Stellantis voting is still under way, and workers at both companies were favoring ratification by comfortable margins. The UAW's GM vote tracking site currently shows approval of the contract leading by a 54% to 46% margin with almost 32,000 workers having cast votes out of about 46,000 UAW-represented GM workers. The Arlington plant, with about 5,000 UAW members, has the most of any GM plant. Voting officially ends on Thursday at 4 p.m. EST, although most votes will be cast on Wednesday. The UAW went on strike for more than six weeks against the Detroit Three, seeking better wages, working conditions and cost-of-living adjustments. All three companies agreed to tentative agreements about two weeks ago. Workers at other GM assembly plants voted against the deal, including 60% of workers at its Fort Wayne, Indiana, truck plant, 53% at its Wentzville, Missouri, plant, 58% of workers at GM's Lansing Grand River plant and 61% of workers at the Lansing Delta Township plant. Seven of GM's 11 assembly plants rejected the deal. In addition to Arlington, workers at plants in Detroit, Fairfax, Kansas; and Lake Orion, Michigan; approved the agreement. Only nine facilities are still listed without vote totals on the UAW vote tracker, including GM's Lockport, New York, components plant with about 1,200 members. Those voting in favor of the agreement have a lead of almost 2,500 and many of the facilities still to come include workers who stand to receive large pay increases upon ratification.
GM's latest production delays: Colorado/Canyon, Cadillac CT4/CT5, Camaro
Wed, Mar 24 2021DETROIT — General Motors Co extended production cuts in North America on Wednesday due to a worldwide semiconductor chip shortage that has impacted the auto sector. The U.S. automaker said its Wentzville, Missouri, assembly plant would be idled during the weeks beginning March 29 and April 5. It will extend down time at its plant in Lansing, Michigan, which has been idled since March 15, by two weeks. The action was factored into GM's prior forecast that it could shave up to $2 billion off this year's profit, spokesman David Barnas said. GM did not disclose how much volume would be lost by the move, but said it intended to make up as much lost production as possible later in the year. The chip shortage came as North American auto plants were shut for two months during the COVID-19 pandemic last year and chip orders were canceled, and as demand surged from the consumer electronics industry as people worked from home and played video games. That's now left carmakers competing for chips. Semiconductors are used extensively in cars, including to monitor engine performance, manage functions for everything from steering to automatic windows, and in sensors used in parking and entertainment systems. Vehicles affected by the GM production cuts include the mid-sized pickup trucks, the Chevrolet Colorado and GMC Canyon in Missouri, and the Cadillac CT4 and CT5 and Chevy Camaro cars in Michigan. Meanwhile, GM said its San Luis Potosi, Mexico, assembly plant, idled since Feb. 8, will resume production with two shifts beginning the week of April 5. Last week, GM said it was building certain 2021 light-duty full-size pickups without a fuel management module, hurting their fuel economy performance by one mile per gallon. Exacerbating the shortage is a recent fire at a Renesas Electronics chip plant in Japan. Barnas said GM was assessing the impact of the fire. Â



