1962 Pro Touring, 4 Wheel Disc Brakes on 2040-cars
Leander, Texas, United States
|
I have for sale a very nice 1962 nova, It was originally from southern California and the body is in great original shape(note the original primer on the underside of the car) and what looks like all original interior. The car has a long list of very good pro touring style modifications. I will list them..
Edelbrock performer rpm aluminum heads and roller rockers. 700r4 transmission. Ford 9" rear end with 3.50 gears and a positrac. 4 wheel disk brakes. tubular upper and lower control arms. Rack and pinion steering. weld in sub frame connectors. New flomaster exhaust. MSD distributor and 6al box Auto gage oil pressure and water temp gauges. After market tilt wheel The car has really great patina, but would be easily painted with how straight it is...with that said, The shifter is for a powerglide and could to be swapped for a 700r4 one. The radiator should be changed for hot weather driving (this was the next thing on my list) My name is Matt, you can call,text or email 512-944-4587 with any questions (please keep times reasonable)It is for sale locally and reserve the right to end auction early. If you have a feedback lower then 5 contact me first before bidding ,Thanks |
Chevrolet Nova for Sale
Auto Services in Texas
World Tech Automotive ★★★★★
Western Auto ★★★★★
Victor`s Auto Sales ★★★★★
Tune`s & Tint ★★★★★
Truman Motors ★★★★★
True Image Productions ★★★★★
Auto blog
GM delaying additional Silverado EV and Sierra EV production to Q4 2025
Tue, Oct 17 2023This looks like more "Gotcha!" news about storms in the EV sector, but the word "additional" is key here. The Detroit News reported today that GM is pushing delaying production of the Chevrolet Silverado EV and GMC Sierra EV pickups at the Orion Assembly Plant to late 2025, about a year behind expectations. The Silverado EV Work Truck is already in production at GM's Factory Zero in Detroit, which won't change. Retail versions of the Silverado EV are still planned for production at Factory Zero before the end of this year, and the Sierra EV is expected to enter production at Factory Zero early next year. This new plan simply means GM won't add more production of those electric trucks at Orion. GM builds the Chevrolet Bolt at Orion right now, assembly of that groundbreaking car to end this year. GM's original idea was to spend $4 billion to convert Orion to EV pickup production in time to get its two giant profit makers rolling down lines in early 2025. The move to late 2025 could mean the plant is out of commission for about two years. The facility's 1,261 employees are being offered spots in other plants, including Factory Zero. The automaker gave several reasons for the move, a spokesperson telling The Detroit News the company wants "to better manage capital investment while aligning with evolving EV demand," and telling the Detroit Free Press, "We're looking at EV demand and the trendline for EVs is stabilizing. ... It is not rising as fast as originally forecasted." On top of that, engineers "have identified engineering improvements that we will implement to increase the profitability of our products." The spokesperson also made it clear that the delay has nothing to do with the UAW strike, now in its 32nd day. Factory Zero's working up to a near-term production capacity of about 600,000 units annually, GM saying it wanted to get capacity to 1 million EVs annually by the end of 2025. At the moment, the site builds the Silverado EV Work Truck, the GMC Hummer EV pickup and SUV, and the Cruise Origin shuttles — not the Bolt taxis, the autonomous pods. The Detroit News reported GM sold 18 Silverado EV Work Trucks in Q3 this year, GM Authority says GMC Hummer EV production has ramped up to about 3,000 units per month, and Cruise Origin is still waiting on approval from the National Highway Safety Traffic Administration to mass-produce the autonomous shuttles because the shuttles need an exemption for not having steering wheels.
Diesel Power finds the ultimate modified oil-burner
Sat, 24 Aug 2013For nine years, Diesel Power magazine has run the Diesel Power Challenge, this year's grindfest being "a week-long torture test that features seven events, nine trucks, 8,000 horsepower, and nearly 15,000 pound-feet of torque." The road to being crowned "the most powerful truck" starts with a dyno run, and then continues through the completion of a CDL-style obstacle course, an eighth-of-a-mile drag race while towing a 10,000-pound trailer, a quarter-mile drag race without a trailer, a fuel economy test in the mountains and finally a sled-pulling test through a 300-foot-long packed-mud pit.
What kind of trucks get into such a fight? Last year's winner, for instance - who upgraded his truck this year to prove he didn't "luck into the win" - drives a 2008 Ford F-250 Super Duty with a 6.4-liter Power Stroke V8 upgraded with a custom intake, Elite Diesel triple turbos and a two-stage nitrous system. Another competitor has a 2005 Dodge Ram 2500 powered by a 5.9-liter Cummins inline-six, upgraded with Garrett turbos, dual-stage nitrous, a seven-inch exhaust stack and twin fans built into the bed to cool the Sun Coast Omega transmission. The numbers on that truck: 1,255 horsepower, and 2,063 pound-feet of torque at the wheels. Naturally, as the image above might suggest, things don't always end well.
You'll find all five videos covering this years challenge below. A scene in the dyno video sums it all up perfectly: a competitor leaves his nitrous on too long and the crew is treated to some ominous poppings, he leans out the window, throws both hands up and shouts, "Amer'ca!"
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.






















1966 chevrolet nova 383ci v8 with 350 turbo automatic restored!
1971 chevrolet nova base coupe 2-door 6.6l
1972 chevy nova ss 430hp 450tq
1973 chevrolet nova base coupe 2-door 5.7l
1970 nova drag car pro street no reserve camaro
1965 chevrolet nova chevy 11 hard top