Find or Sell Used Cars, Trucks, and SUVs in USA

Corvair Greenbriar Van 1963 - With Title on 2040-cars

Year:1963 Mileage:99034
Location:

Otis, Oregon, United States

Otis, Oregon, United States
Advertising:

1963 Corvair Greenbriar Van with clear title. Great project for Corvair lovers! Dual carb 110 engine (seized up), very rough interior but does have all the trim. Located in Oregon - will not ship but may help with delivery in Oregon or Washington.

Auto Services in Oregon

Tualatin Auto Repair & Towing ★★★★★

Auto Repair & Service, Auto Transmission, Auto Oil & Lube
Address: 8800 SW Old Tualatin Sherwood Rd, Tualatin
Phone: (503) 885-0607

Toy Doctor ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 19095 SW Teton Ave, Donald
Phone: (971) 231-5897

Today`s Automotive ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automotive Tune Up Service
Address: 6147 SE Foster Rd, Donald
Phone: (800) 835-3456

The Jag Shop ★★★★★

Auto Repair & Service, Auto Transmission, Automobile Inspection Stations & Services
Address: 5710 E Burnside, Tualatin
Phone: (866) 595-6470

T V G Inc ★★★★★

Auto Repair & Service, Brake Repair, Automobile Electric Service
Address: 945 SE 12th Ave, Gladstone
Phone: (503) 902-6269

T & T Tire ★★★★★

Auto Repair & Service, Tire Dealers, Brake Repair
Address: 603 Ash St, Rainier
Phone: (360) 562-0054

Auto blog

GM invests $175 million in Chevy Camaro factory

Thu, May 28 2015

General Motors just keeps rolling out portions of its $5.4-billion plan for factory upgrades over the next three years. In the latest announcement, the automotive giant is putting $175 million into the Lansing Grand River Assembly Plant for improvements to build the 2016 Chevrolet Camaro. The investment brings new equipment to the plant to build the pony car. An upgrade is needed to support Camaro-specific colors like Summit White, Bright Yellow, and Red Hot, and the factory is also getting two robotic framers. A second shift of 500 workers is resuming in Lansing later this summer to produce the model, as well. So far, GM has announced allocations for $2.8 billion of the $5.4 billion in upgrades. The investments include $1.2 billion to improve pickup production, $439 million for a paint shop for the Corvette, and more new equipment at other plants too. Lansing Grand River Plant Tools Up for 2016 Camaro $175 million investment enables production of lighter, more powerful model 2015-05-28 LANSING, Mich. – A $175 million investment for new tooling and equipment for the sixth-generation Chevrolet Camaro, and the return of hundreds of workers to build America's best-selling performance car for the last five years, was announced today. The facility improvements include three new paint systems for Camaro-specific colors: Summit White, Bright Yellow, and Red Hot. The investment also includes installation of two robotic framers, which allow better dimensional control to provide a more precise drive experience. The Lansing Grand River Assembly Plant will resume a second shift of 500 jobs in late summer. The all-new Chevrolet Camaro was introduced on Detroit's Belle Isle on May 16. The current generation Camaro has been America's favorite performance car for five consecutive years, attracting both long-term Camaro fans and new buyers to Chevrolet. To improve on that success, the sixth-generation Camaro elevates every aspect of Camaro with a suite of new technologies, even higher levels of performance and fuel economy, and a leaner, more athletic design. "I may be the luckiest mayor in America today," said Lansing Mayor Virg Bernero. "Gearing up for full-scale production of the legendary Chevy Camaro is a new high point in the more than two decades of extraordinary partnership between the City of Lansing, General Motors and the UAW.

UAW rejects GM contract proposal but makes a counter offer

Tue, Oct 1 2019

The United Auto Workers union said a new comprehensive offer made by General Motors Co late Monday to end a two-week-old strike was not acceptable and said it had made a new counterproposal. UAW vice president Terry Dittes said in a letter to members "there are many important issues that remain unresolved." The union is awaiting GM's next proposal. He said GM's offer came up short on many issues.  Dittes said GM made a "comprehensive proposal" at 9:40 p.m. Monday. "This proposal that the company provided to us on day 15 of the strike did not satisfy your contract demands or needs. There were many areas that came up short like health care, wages, temporary employees, skilled trades and job security to name a few." Dittes is the union's vice president for GM relations and the UAW's lead negotiator in these contract talks. "We have responded today with a counterproposal and are awaiting GM's next proposal to the union," he wrote. "Regardless of what is publicized in print or social media, etc., there are still many important issues that remain unresolved." The strike, in its third week, has cost GM more than $1 billion, according to J.P. Morgan analyst Ryan Brickman. He said the cost per day in potential profit is $82 million. However, another analysis, by East Lansing-based consultant Anderson Economic Group, put the losses at $25 million a day. And the effects of the strike are expanding. GM said Tuesday the strike has created a parts shortage that forced the automaker to halt production at its pickup and transmission plants in Silao, Mexico, temporarily laying off 6,000 workers. Silao is where GM builds its highly profitable four-door crew cab Chevy Silverado and GMC Sierra pickups. The strike has also forced GM to idle some Canadian workers, and many suppliers have been forced to halt operations. About 48,000 UAW members went on strike on Sept. 16 seeking higher pay, greater job security, a bigger share of the leading U.S. automaker’s profit and protection of their healthcare. 

Personal testimonies show real-world effect of plugging in with Chevy Volt

Mon, Jan 13 2014

At this point, there are tens of thousands of individual stories about what it's like to live with a Chevrolet Volt. But it also remains informative to take a look at one of these in depth. For example, one Atlanta-area Volt owner says he's cut his cents-per-mile ownership costs by almost 40 percent compared to his previous car primarily because of his ability to drive almost all the time on electric power. Jeffrey Cohen told Clean Technica that he put about 14,000 miles on his Volt extended-range plug-in hybrid for the year that ended October 2013, and that more than 92 percent of those were on electrons. He estimates his "lifetime" miles per gallon rating at a whopping 384 mpg, a figure pushed upward by the fact that he installed a Level 2 charger at home while his employer added an external 110-volt charger at work. Cohen is spending 45 cents a mile for his car, compared to 73 cents in his Infiniti M35. As a result, he's spending 45 cents a mile for his car, compared to 73 cents a mile with his prior vehicle, an Infiniti M35. About two-thirds of those Volt costs are for the $349-a-month lease payments, while 15 percent is insurance, 11 percent is for the charger and seven percent for the gas and electricity that actually powers the car. Helping lower that last figure is an overnight electricity rate that's about 10 percent of Cohen's daytime rate. Chevy parent General Motors hopes such testimonies will re-trigger sales for the Volt in 2014. Last year, GM sold 23,094 Volts, down 1.6 percent from 2012. We expect our readers have similar stories they'd like to share in the Comments. Related Gallery 2011 Chevrolet Volt: Review View 22 Photos News Source: Clean TechnicaImage Credit: Lead image: AP Photo/Jae C. Hong Green Chevrolet GM Electric running costs