2003 Chevrolet Silverado 2500 Lt Ext. Cab Long Bed 4wd P/u on 2040-cars
Grand Junction, Colorado, United States
Fuel Type:Diesel
For Sale By:Dealer
Make: Chevrolet
Model: C/K Pickup 2500
Mileage: 125,723
Chevrolet C/K Pickup 2500 for Sale
1971 chevy k20 4wd
1999 chevy 2500 4x4
2009 chevrolet 2500hd z71 duramax diesel- excellent condition!!!(US $32,000.00)
2009 chevrolet k2500hd silverado duramax allison 4x4
10 year resto project frame off nice everywhere and drives great! ac tach 700r4(US $25,000.00)
05 silverado 4x4 2500 reg cag(US $900,000.00)
Auto Services in Colorado
Yoda Man Jim ★★★★★
Tsgauto.Com ★★★★★
Tsg Auto ★★★★★
Tilden Car Care ★★★★★
South Denver Automotive ★★★★★
Royal Automotive ★★★★★
Auto blog
Race Recap: 2013 Twelve Hours of Sebring, cakewalk up front, grindfest out back [w/spoilers]
Tue, 19 Mar 2013This year's 12 Hours of Sebring wasn't exactly a foregone conclusion because we're still talking about racing, and anything can happen when the speeds are as high as the adrenaline and the desire. But we're still talking about Audi bringing it's two top-spec racers - and its huge budget and its nearly neurotic attention to detail - to a race that it uses as a test bed for The 24 Hours of Le Mans and as a way to open the endurance racing season with a victory.
Besides, 12 hours is a long time, especially at Sebring, and things didn't go all Audi's way. On top of that, although it was a pretty quiet race, behind the Audis things got even grimier, with plenty of battles, plenty of mechanical issues, and the new BMW Z4 GTE and Viper GTS-R being race tested. Oh, and that brand new chromed-out DeltaWing...
GM to invest $632 million in Indiana plant for future pickup truck production
Mon, Jun 12 2023General Motors plans to invest $632 million in its Fort Wayne, Indiana, assembly facility to prepare the plant for future internal combustion engine full-size light duty trucks, it said on Monday. The investment will be used to support new conveyors, tooling and equipment for the plant that manufactures GM's Chevrolet Silverado 1500 and GMC Sierra 1500 trucks. GM has detailed more than $2.3 billion in planned investment in a series of announcements since last week as it works to retool existing North American auto plants and introduce more efficient next-generation internal-combustion full-size trucks and SUVs. Another investment announcement is planned later this week. The largest U.S. automaker is continuing to make big investments in gas-powered vehicles even as it vows to stop building them in 2035. Last week, GM said it was investing more than $500 million in its Arlington, Texas, assembly plant to prepare it for production of internal combustion engine full-size SUVs. GM faces increasingly stringent emissions requirements from California and the Environmental Protection Agency (EPA). Last week, GM also said it plans to invest more than $1 billion to re-tool two manufacturing sites in Flint, Michigan, to prepare for a new generation of its heavy-duty trucks. The Texas announcement highlights the company's commitment to continue "providing customers with a strong portfolio of (internal combustion) vehicles for years to come," GM said last week. On Tuesday, GM said it would invest C$280 million ($210 million) in its Canadian Oshawa Assembly to produce the next-generation internal combustion engine full-size trucks. GM paid $128.2 million in fines for failing to meet Corporate Average Fuel Economy (CAFE) program requirements for 2016 and 2017, records released recently show. The EPA in April proposed requiring a 56% reduction in projected fleet average emissions over 2026 requirements. (Reporting by David Sherpardson in Washington and Shivansh Tiwary in Bengaluru; Editing by Shilpi Majumdar and Conor Humphries) Plants/Manufacturing Chevrolet GM GMC
GM forced to cut truck production amid semiconductor shortage
Thu, Jul 22 2021WASHINGTON — General Motors said Wednesday it will cut some truck production in North America because of the ongoing global semiconductor shortage. The largest U.S. automaker said its Flint Assembly plant that builds the Chevrolet Silverado HD and GMC Sierra HD trucks will operate on one production shift the week of July 26. GM said its Ft. Wayne Assembly plant in Indiana that builds the Chevrolet Silverado 1500 and GMC Sierra 1500 model trucks will be idled next week. GM's Silao Assembly plant in Mexico that also builds the Chevrolet Silverado 1500, Cheyenne (for the Mexico market) and GMC Sierra 1500 will also suspend production next week. All three plants are expected to resume regular production the week of August 2. Related video:
