Find or Sell Used Cars, Trucks, and SUVs in USA

??1997 Chevrolet Blazer Lt Sport Utility ?no Reserve?? Snow Plow Included?? on 2040-cars

Year:1997 Mileage:146000
Location:

Edison, New Jersey, United States

Edison, New Jersey, United States
Advertising:

Text or call 
732-675-9939
Up for sale is in MINT condition 
1997 Chevy Blazer. 
4.3L 6 CYLINDER 4x4 
CLEAN TITLE!!!!
with full power angle fisher plow
All works perfectly
Engine and transmission 100%
Automatic trans
146, xxx

Sun roof
power locks power windows                                           ?? NEVER EVER ABUSED ONLY PLOWED MY SMALL PARKING LOT DRIVEN
                                                                                        WITHOUT PLOW REST OR YEAR!!!!!??
plow lights

Leather seats
Plow is nearly brand new
truck tires are brand new Goodyear Wrangler 
??Inspection good for 2 years??


Going out of business is only reason for selling....
??This truck needs nothing!                                                   WHEN SEEN IN PERSON YOU WILL BUY

Auto Services in New Jersey

World Class Collision ★★★★★

Automobile Body Repairing & Painting
Address: 338 S Governor Printz Blvd, Paulsboro
Phone: (610) 521-4650

Warren Wylie & Sons ★★★★★

Auto Repair & Service
Address: 2 Red Hill Rd, Sussex
Phone: (973) 293-8185

W & W Auto Body ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 550 S Oxford Valley Rd, Delran
Phone: (215) 946-3550

Union Volkswagen ★★★★★

New Car Dealers
Address: 2155 US Highway 22 W, Fanwood
Phone: (908) 687-8000

T`s & Son Auto Repair ★★★★★

Auto Repair & Service
Address: 880 Route 9 N, Long-Beach-Township
Phone: (609) 294-1500

South Shore Towing ★★★★★

Auto Repair & Service, Towing, Automotive Roadside Service
Address: 311 S Main St, Ship-Bottom
Phone: (609) 597-9964

Auto blog

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.

Meet the mother-daughter team that's worked on almost every Chevy Volt

Sun, May 11 2014

It's Mother's Day, and we're soft enough we love our mothers enough to share a new video from General Motors with you. In it, we meet Monique Watson (left) and Evetta Osbourne, a mother-daughter team that works at the Detroit-Hamtramck Assembly where GM makes the Chevy Volt (along with all of GM's other plug-in hybrids: the Opel Ampera, Holden Volt and Cadillac ELR). The two work side-by-side and have installed the lithium-ion battery pack on almost all of those vehicles - nearly 80,000 of them - since GM started making the pre-production Volts in 2009. In a prepared statement, Watson said that she likes working next to her mom, day in and day out, and they the two are totally in sync when it comes to putting the 400-pound, 16.5-kWh packs into the vehicle undersides. They two can also share stories throughout the day, and Watson said, "The arrangement has absolutely improved our relationship." Osborne started working at Detroit-Hamtramck in 1999, Watson since 2006. If you're driving a Volt today, you probably have them to thank for doing a bit of the work putting your car together. See a short video of them in action below. It's Always Mother's Day for Detroit-Hamtramck Duo Mother, daughter install lithium-ion battery pack in nearly all GM electric vehicles 2014-05-08 DETROIT – For Detroit resident Evetta Osborne, every day is Mother's Day. That's because she literally works side by side with her daughter, Monique Watson, at General Motors' Detroit-Hamtramck assembly plant. They have installed the lithium-ion battery pack on nearly every Chevrolet Volt, Opel Ampera, Holden Volt, and Cadillac ELR since production began. In fact, apart from vacation days and an occasional sick day, the mother-daughter duo has installed almost every battery pack since the Volt was in pre-production in 2009. The ELR launched earlier this year. All told – including Ampera – that's more than 80,000 electric vehicles. "We're a good team and our relationship is secondary when it comes to performing our jobs – but it's great to work alongside my daughter, said Osborne, a mother of five. Because the battery packs weigh more than 400 pounds each, automatic guided vehicles – robotic carts that use sensors to follow a path through the plant – deliver them just as the vehicle body structures glide into position overhead. The carts then lift the T-shaped packs, and Osborne and Watson guide them into the chassis and secure each one with 24 fasteners.

Camaro spy shots show subtly different grille, front fascia

Sun, 03 Feb 2013

It looks like there some changes in store for the Chevrolet Camaro - the only thing is that we just don't know what Chevy has up its sleeve. Looking at these spy shots, we'd initially be inclined to think that there is just a minor facelift or a new special edition, but upon closer inspection, there are a few oddities about this car that definitely have us intrigued.
The most obvious difference on this prototype is the slightly restyled front fascia with a smaller lower air inlet and the two-bar grille. Then we get to some of the car's mysterious details. For starters, this fascia has the SS vent above the grille, but it looks to be blocked off. Granted this could just be a one-off piece used for testing. What really piqued our interest was at the rear of the car where it has quad exhaust outlets that are used on the ZL1. Could this be the LS7-powered Camaro that we reported on back in December?
At this point, your guess is as good as ours as to what we're looking at here, so let us know in the comments what you think this could be.