Find or Sell Used Cars, Trucks, and SUVs in USA

1954 Chevy on 2040-cars

US $17,000.00
Year:1954 Mileage:73871
Location:

Vermont, United States

Vermont, United States
Advertising:
Vehicle Title:Clear
Fuel Type:Gasoline
Engine:235 ci inline 6 cyl
For Sale By:Private Seller
VIN: c54k Year: 1954
Mileage: 73,871
Make: Chevrolet
Model: Bel Air/150/210
Drive Type: automatic power glide transmission
Trim: Sedan
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

1954 Chevy Bel Air in excellent condition never driven in the winter.  Kept inside very clean car.  Only 73831 miles.  This car has seat belts and is road ready

Auto blog

GM cutting production at two plants

Thu, Feb 26 2015

General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle

Jay Leno gets pulled over while roaring in a Corvette Z06 convertible

Tue, Jan 6 2015

No one is above the law, even if that person is a certain silver-haired auto enthusiast with a popular weekly video series about the cars in his garage. This week, Jay Leno experiences the 2015 Chevrolet Corvette Stingray Z06, but he also gets to have a meeting with some of California's Finest immediately after a high-speed blast. As opposed to the full-bore Z06 coupe with the seven-speed manual, Leno gets behind the wheel of the slightly heavier convertible version with the eight-speed auto. Being a droptop doesn't bother him too much, but Leno makes it obvious he wishes that he could be shifting for himself. Even if the auto is technically quicker, Leno says that swapping gears gives him something to do while driving. Of course, one of the major advantages of the convertible is the ability to listen to the Z06's thumping V8 unimpeded. With 650 horsepower and 650 pound-feet of torque from 6.2-liters of supercharged muscle, it already puts down impressive numbers, but the sound might just be the best part of all. Around town, the 'Vette is quiet enough to easily blend in with the rest of traffic. However, tip the throttle down and the valves in the exhaust open up to turn the engine into roaring monster. Be careful where you make this thing howl, though, because it's pretty easy for the police to take notice. The host finds that out the hard way in this week's episode of Jay Leno's Garage. Related Gallery 2015 Chevrolet Corvette Z06 Convertible View 18 Photos News Source: Jay Leno's Garage via YouTube Celebrities Chevrolet Coupe Performance Videos Jay Lenos Garage chevy corvette stingray chevy corvette z06

GM to sink over $900M into 4 plants, mostly for a new V8

Fri, Jan 20 2023

FLINT, Mich. — General Motors says it will spend more than $900 million to update four factories, with the bulk going to an engine plant in Flint, Michigan, to build the next-generation V8 for big pickup trucks and SUVs. Factories in Rochester, New York; Defiance, Ohio; and Bay City, Michigan, also will see investments, some to make V8 engine components as well as parts for future electric vehicles, the company said Friday. The investments won't create any new jobs, but they will preserve about 2,400 hourly and salaried positions positions at the four sites, the company said. The investments “provide job security at these plants for years to come,” Gerald Johnson, GM's manufacturing chief, said in a statement. Much of the money, $579 million, will go to Flint Engine Operations for equipment to build the sixth-generation small-block V8 that will go into the next round of big pickup trucks and SUVs. The plant now employs about 700 people who also will keep making their current product, a diesel engine used in light trucks. GM, like other automakers, is facing stricter government fuel economy standards and pollution limits starting in the 2024 model year. New vehicles sold in the U.S. will have to average at least 40 miles per gallon of gasoline in 2026, up from about 28 mpg, under new Biden administration rules that undo a rollback of standards enacted under former President Donald Trump. That means the new V8 will have to get better mileage and pollute less than the current versions. Although GM wouldn't release details on the new engine, Johnson said during a news conference at the Flint plant that it would be more efficient than the current version. GM has a goal of selling only electric passenger vehicles by 2035, but Johnson said that's a dozen years out, a period when many customers will still want gas engines. “We know that has a horizon,” he said. “Between here and there, there are a lot of internal combustion customers that we don't want to lose,” he said. In addition to Flint, GM's engine components plant in Bay City, Michigan, will get $216 million to build camshafts and connecting rods, and to machine engine blocks and heads for the new V8 being built in Flint. The plant now employs about 425. The Defiance, Ohio, foundry will get $55 million to build a variety of block castings for the new V8. Included is $8 million for castings to support future electric vehicles, the company said. The plant has about 530 employees.