Find or Sell Used Cars, Trucks, and SUVs in USA

2012 Chevy Traverse - 20k Miles Fully Loaded on 2040-cars

US $24,500.00
Year:2012 Mileage:20000
Location:

Brooklyn, New York, United States

Brooklyn, New York, United States
Advertising:

Beautiful, like new- fully loaded...Chevy Traverse LT- Navigation, leather, 7 passenger, quad bucket seats, dual sunroof, 20k miles....BEAUTIFUL CAR INSIDE AND OUT!!

Chevrolet Traverse for Sale

Auto Services in New York

Zuniga Upholstery ★★★★★

Automobile Parts & Supplies, Upholsterers, Automobile Seat Covers, Tops & Upholstery
Address: 31 Crown St, Brightwaters
Phone: (866) 595-6470

Westbury Nissan ★★★★★

New Car Dealers
Address: 15 Kinkel St, Locust-Valley
Phone: (516) 338-5600

Valvoline Instant Oil Change ★★★★★

Auto Repair & Service, Auto Oil & Lube, Automotive Tune Up Service
Address: 907 Old Country Rd, Old-Westbury
Phone: (516) 334-1442

Valvoline Instant Oil Change ★★★★★

Auto Repair & Service, Auto Oil & Lube, Automotive Tune Up Service
Address: 7374 Pittsford Palmyra Rd, Port-Gibson
Phone: (585) 223-1840

Value Auto Sales Inc ★★★★★

Auto Repair & Service
Address: 4854 Broadway, Wales-Center
Phone: (866) 595-6470

TM & T Tire ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Tire Dealers
Address: North-Salem
Phone: (718) 729-3500

Auto blog

Chevy Bolt 200-mile EV going into production near Detroit

Thu, Feb 12 2015

Where there's smoke, there's fire, apparently. The rumors of the Chevy Bolt going into production have been proven correct, with an announcement this morning at the Chicago Auto Show that the 200-mile, all-electric Bolt will be built at the Orion Assembly facility near Detroit. GM didn't say exactly when the Bolt will be built, but GM North America president Alan Batey said in a statement that, "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." He's not kidding. GM is talking about a $30,000 price tag for an EV that can do twice as many electric miles as any non-Tesla mass-production EV today. Previous hints have the Bolt starting production next year for a market debut in 2017, and with all of the accuracy we've seen from these secret releases up to now, we're going to say this is probably accurate until we hear otherwise. We still have questions about the price tag, but for now we'll try to track down more information here in Chicago. Chevrolet Commits to Bolt EV Production Game-changing, long-range EV to be built at Orion Assembly facility in Michigan CHICAGO – Chevrolet this morning confirmed production of its next-generation pure electric vehicle, based on the Bolt EV concept. It will be built at General Motors' Orion Assembly facility near Detroit. GM North America President Alan Batey made the announcement ahead of the Chicago Auto Show. The Bolt EV concept was introduced last month at the North American International Auto Show in Detroit. "The message from consumers about the Bolt EV concept was clear and unequivocal: Build it," said Batey. "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." Leveraging the industry-leading battery technology found in the Chevrolet Volt and Spark EV, the Bolt EV concept was developed as a game-changing, long-range pure electric for all 50 states, designed to offer more than a GM-estimated 200 miles of range at a target price of around $30,000. The progressively styled concept vehicle features selectable driving modes for preferred driving styles, such as daily commuting, and it was designed to support DC fast charging. "We're proud that Chevrolet has decided to produce the Bolt EV here in Michigan at the Orion Assembly facility," Gov. Rick Snyder said. "Michigan unquestionably remains the global automotive leader.

Corvette Stingray Shooting Brake under consideration by Callaway [w/poll]

Mon, 18 Mar 2013

Callaway has released a few renderings of a design study for a shooting brake version of the C7 Chevrolet Corvette Stingray. The company says it wants to create a long-roof version of America's sports car to offer buyers more interior room and a vehicle with "unique style." The company says it will use structural carbon fiber for the new body bits, which suggests the conversion shouldn't add too much more weight to the Corvette. Along with a few mechanical tweaks, the Callaway Corvette Stingray AeroWagon could breeze past the 200 miles per hour barrier.
Provided that they get enough interest, Callaway estimates they will be able to effect the changes on the Chevrolet for around $15,000, and says the conversion work should be available through its network of dealers. You can check out the brief press release below for more information, or head over to the Callaway site to plunk down a deposit - but before you do, we want to know... do you find this C7 wagon interesting? Vote in our poll below, then feel free to leave a few lines in Comments.
View Poll

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.