Black Gray Sedan Eco 1.4l Ecotec 4 Cyl Turbo Remote Start Power Acc Park Assist on 2040-cars
Lebanon, Missouri, United States
Engine:1.4L 1364CC 83Cu. In. l4 GAS DOHC Turbocharged
For Sale By:Dealer
Body Type:Sedan
Fuel Type:GAS
Transmission:Automatic
Warranty: Vehicle has an existing warranty
Make: Chevrolet
Model: Cruze
Options: CD Player
Trim: Eco Sedan 4-Door
Power Options: Power Locks
Drive Type: FWD
Vehicle Inspection: Inspected (include details in your description)
Mileage: 8
Number of Doors: 4
Sub Model: 4dr Sdn ECO
Exterior Color: Black
Number of Cylinders: 4
Interior Color: Gray
Chevrolet Cruze for Sale
2013 chevrolet cruze 2lt turbo leather heated seats bluetooth mylink one owner
2012 chevrolet cruze ls sedan 4-door 1.8l
2012 chevrolet cruz lt 38 mpg highway bluetooth 6 speed rs package(US $14,487.00)
2011 2lt used turbo 1.4l i4 16v automatic fwd sedan onstar premium(US $15,900.00)
2012 chevrolet cruze ls sedan 4-door 1.8l(US $19,999.00)
**** no reserve **** 2013 chevrolet cruz lt **** 1,700 miles only *** great mpg
Auto Services in Missouri
Wright Automotive ★★★★★
Wilson auto repair & 24-HR towing ★★★★★
Waggoner Motor Co ★★★★★
Vanzandt?ˆ™s Auto Repair ★★★★★
Valvoline Instant Oil Change ★★★★★
Todd`s & Mark`s Auto Repair ★★★★★
Auto blog
2014 Chevy Corvette Stingray order guide hits the web
Mon, 15 Apr 2013The official debut of the 2014 Chevrolet Corvette Stingray is only part of the excitement for fans of Chevy's virtuoso sportscar. Although we got to see the car and some of its preliminary specs in Detroit and Geneva, there is still no word on pricing and some of the juicier data points we've been waiting for - such as confirmed power output, EPA estimated mileage figures and performance numbers. Until then, CorvetteBlogger has gotten its hands on the order guide for the coupe version of the car - in both base and Z51 iterations - revealing tidbits like standard and optional features and available color combinations.
Some other new details made it onto the order guide, such as our first interior specs for the coupe including slightly less hip room and headroom, more shoulder room and the same amount of legroom. To see the full order guide, head on over to CorvetteBlogger. From what we can gather, it sounds like more information will be revealed on April 25 during a party at the Corvette Museum, and for those sun worshipers patiently waiting for a convertible, it would appear you've got another model year to wait through.
GM CEO to meet with U.S. lawmakers over job cuts
Fri, Nov 30 2018WASHINGTON — General Motors Co Chief Executive Mary Barra plans to visit Capitol Hill next week to discuss the company's plans to halt production at five plants in North America next year and cut up to 15,000 jobs, two congressional aides said on Friday. GM has come under harsh criticism from lawmakers from both major political parties, and from President Donald Trump, since Monday when it announced the biggest restructuring for the U.S. No. 1 carmaker since its bankruptcy a decade ago. Barra is expected to meet with lawmakers from Michigan and Ohio, where GM plans to shutter three plants, as well as senior leaders in Congress. GM did not immediately comment. Barra has been calling lawmakers this week to explain the decision to end production. Trump has threatened to revoke subsidies for GM. The Detroit automaker plans to halt production next year at three assembly plants: the Lordstown small-car factory near Youngstown, Ohio; the Detroit-Hamtramck complex in Detroit; and the Oshawa, Ontario, assembly complex near Toronto. It will also stop building several models now assembled at those plants, including the Chevrolet Cruze, the Chevrolet Volt hybrid, the Cadillac CT6 and the Buick LaCrosse. Additionally, GM plans to shutter the Warren transmission plant outside Detroit and a plant that makes electric motors and drivetrains outside Baltimore, Maryland. The Cruze compact car will be discontinued in the U.S. market in 2019, although GM may continue building it in Mexico for other markets, Barra said. Reporting by David Shepardson. Related Video:
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.




















