Find or Sell Used Cars, Trucks, and SUVs in USA

1991 Cadillac Deville on 2040-cars

US $15,900.00
Year:1991 Mileage:40439 Color: White /
 Burgundy
Location:

North Royalton, Ohio, United States

North Royalton, Ohio, United States
Advertising:
Vehicle Title:Clean
Engine:8 Cylinder Engine
Fuel Type:Gasoline
Body Type:--
Transmission:Automatic
For Sale By:Dealer
Year: 1991
VIN (Vehicle Identification Number): 1G6CD53B1M4247945
Mileage: 40439
Make: Cadillac
Drive Type: 4dr Sedan
Style ID: 133087
Features: --
Power Options: --
Exterior Color: White
Interior Color: Burgundy
Warranty: Unspecified
Disability Equipped: No
Model: DeVille
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto Services in Ohio

Westerville Automotive ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Brake Repair
Address: 5591 Westerville Rd, Galena
Phone: (614) 890-0707

West Chester Autobody ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Windshield Repair
Address: 9366 Cincinnati Columbus Rd, Monroe
Phone: (513) 777-3857

Unique Auto Painting ★★★★★

Automobile Body Repairing & Painting
Address: 700 Shoemaker Ave, Powell
Phone: (614) 297-6416

Thrifty Mufflers ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Mufflers & Exhaust Systems
Address: 909 Erie St S, Beach-City
Phone: (330) 833-9050

The Right Place Automotive ★★★★★

Auto Repair & Service
Address: 2816 Banwick Rd, New-Albany
Phone: (614) 338-0091

Superior Automotive & Truck Repair ★★★★★

Auto Repair & Service, Brake Repair, Auto Engine Rebuilding
Address: 1330 Cox Ave, Newtown
Phone: (859) 746-2100

Auto blog

GM extends vehicle production cuts into mid-March due to global chip shortage

Tue, Feb 9 2021

DETROIT — General Motors said on Tuesday it was extending production cuts at three North American plants until at least mid-March due to the global semiconductor chip shortage, while vehicles at two other factories would only be partially built. GM, whose shares dipped 1% after the announcement, did not disclose the impact volumes or say which supplier and vehicle parts were affected by the chip shortage. But it said it would focus on keeping production running at plants building its highest-profit vehicles, full-size pickup trucks and SUVs. GM said it intended to make up as much lost production as possible once the shortage chip eased. "Semiconductor supply remains an issue that is facing the entire industry. GM's plan is to leverage every available semiconductor to build and ship our most popular and in-demand products," GM spokesman David Barnas said. GM said it was extending downtime at its U.S. plant in Fairfax, Kansas, its Canadian factory in Ingersoll, Ontario, and its Mexican facility in San Luis Petosi until mid-March when it would reassess the situation, he said. In addition, GM would build but leave incomplete for final assembly vehicles at Wentzville, Missouri, and its Mexican plant at Ramos Arizpe. GM vehicles affected by the idled plants include the Chevrolet Malibu sedan, Cadillac XT4 SUV, Chevy Equinox, and GMC Terrain SUVs. Vehicles to be left incomplete for now included the Chevy Colorado, GMC Canyon pickups and Chevy Blazer SUV. This week, GM had said it was idling the three factories where it has now extended downtime and said it would halve production at a plant in South Korea. The chip shortage has affected many automakers, including Toyota, Volkswagen, Stellantis, Ford, Renault, Subaru, Nissan, Honda and Mazda. Asian chipmakers are rushing to boost production but say the supply gap will take many months to plug. German chipmaker Infineon said the shortage would get worse in the near term. The chip shortage is expected to cut global output in the first quarter by more than 670,000 vehicles and last into the third quarter, IHS Markit said. AutoForecast Solutions estimated total lost production this year could reach 1 million vehicles. Honda and Nissan said on Tuesday they would sell 250,000 fewer cars in total this financial year due.

Recharge Wrap-up: Lyft partners with Didi Kuaidi, Cadillac uses ultracapacitors

Thu, Sep 17 2015

Lyft and Chinese on-demand transportation venture Didi Kuaidi have announced a partnership. Additionally, Didi Kuaidi is investing $100 million in Lyft. The two ridesharing companies will share technology and provide interoperability between platforms. For users, this means it will be easier to get around when traveling between the US and China. "In today's rideshare environment, where every region presents a unique set of challenges and opportunities, partnering with the homegrown leader is the winning approach to Chinese expansion," says Lyft President and co-founder John Zimmer. Learn more in the video above, and in the press release below. Car2go has announced service in Miami Beach, FL. Beginning October 1, the one-way carsharing service will expand its boundaries beyond its current Miami service area to include neighboring Miami Beach. "We're thrilled to see car2go expand to Miami Beach," says Miami Beach Mayor Philip Levine. "Miami Beach residents and visitors are increasingly seeking new, environmentally conscious options to move around North, Middle, and South Beach, and carsharing is an important part of realizing that vision." Read more from Car2go. ClipperCreek has added the HCS-30 EVSE to its product line. The 24-amp, 240-volt Level 2 charging station is designed for residential and workplace duty. It allows for faster charging without the customer having to upgrade their electrical service panel. Delivering about 20 miles of range per hour of charging, the HCS-30 EVSE can charge most EVs in about four hours. Pricing begins at $565. Read more from ClipperCreek. Cadillac will use ultracapacitors in its stop-start systems for 2016. Rather than relying on battery power to run electrical systems while the engine is not running, the utracapacitors can provide a stable flow of energy without losing lifespan to repeated cycling. Supplied by Maxwell Technologies, the ultracapacitors are also lighter than batteries and, according to Cadillac, provide smoother restarts. The 2016 models to use the updated stop-start technology as standard will be the ATS and CTS, with the exception of the V performance variants. Read more at Green Car Reports. Lyft and Didi Kuaidi Announce Strategic Partnership, Building Toward a Collaborative Global Ridesharing Alliance - Didi Kuaidi Invests $100 million in Lyft - Companies Introduce Ridesharing Coverage Between the U.S.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.