2014 Ford Mustang Gt Premium on 2040-cars
1300 US Highway 31 S., Greenwood, Indiana, United States
Engine:5.0L V8 32V MPFI DOHC
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1ZVBP8FF5E5326009
Stock Num: 41943
Make: Ford
Model: Mustang GT Premium
Year: 2014
Exterior Color: Ruby Red Metallic Tinted Clearcoat
Interior Color: Charcoal Black / Cashmere
Options: Drive Type: RWD
Number of Doors: 2 Doors
Please call 888-795-5835 and ask to speak with the Internet Sales Department for the BEST SERVICE!!!
Ford Mustang for Sale
2013 ford mustang gt premium(US $53,980.00)
2014 ford mustang roush stage 3(US $62,120.00)
2014 ford mustang roush stage 3(US $64,460.00)
2014 ford mustang roush stage 3(US $64,675.00)
2014 ford mustang shelby gt500(US $65,980.00)
2014 ford mustang roush stage 3(US $70,030.00)
Auto Services in Indiana
Vawter`s Automotive Service ★★★★★
Usa Muffler Shops ★★★★★
USA Muffler & Brakes ★★★★★
Twin City Upholstery Ltd. ★★★★★
Tire Central Avon ★★★★★
Taylorsville Tire Inc ★★★★★
Auto blog
All eyes on Detroit as automakers prepare for slow, careful reopening of plants
Thu, May 14 2020DETROIT — The U.S. factories that make Fords, Chevys and Jeeps are coming back to life this week as workers install new safety equipment and wake up machines ahead of the high-stakes restart the Detroit automakers plan to launch on Monday. Ford, General Motors and Fiat Chrysler Automobiles all plan to reopen North American factories on May 18. The reopening of the U.S. auto sector will be a closely watched test of whether workers across a range of industries can return to factories in large numbers without a resurgence of COVID-19 infections. How well the automakers do will be significant for the U.S. economy, as nearly 1 million workers are employed in the sector. Executives at Ford and GM said separately this week the companies have not recorded any cases of COVID-19 transmission in plants outside the United States since adopting new safety protocols. Those procedures include mandatory face masks, separation of workers on assembly lines, frequent cleaning of work areas and requirements that workers pass through temperature monitors and report any symptoms before entering a plant. The Detroit Three have taken unprecedented steps to share information about coronavirus safety practices and develop a common set of workplace standards for their restarts, working with the United Auto Workers union, executives said. "We thought it was critical that we did it together," Ford manufacturing and labor chief Gary Johnson told Reuters. "We've never done this as an industry." The Detroit automakers will restart U.S. plants without regular testing of workers, because they do not have access to sufficient testing capacity, executives and UAW officials said. They will test workers who report COVID-19 symptoms or have fevers discovered by temperature scanners installed at factory entrances. "We have to continue to push for this testing," United Auto Workers union Vice President Cindy Estrada told Reuters on Wednesday. "Unless we have testing weekly to keep sick people out of the plant there is always a risk." Adopting new safety practices is just part of the work the companies must do to reopen after an extraordinary shutdown that has lasted two months. Â Wave zero At Ford, workers going in to ready factories are part of what Chief Operating Officer Jim Farley calls "wave zero." The work of wave zero employees "is really important for success of the startup," he said in an interview.
Ford reveals Fiesta ST race car, points at road ahead for bigger things in Global RallyCross
Wed, 06 Feb 2013The 2014 Ford Fiesta ST doesn't go on sale until this summer, but fans of Global RallyCross will be able to catch the car in action before then. Announced ahead of the Chicago Auto Show, the Fiesta ST will be the car run by Ford GRC teams this season, and the model on display in Chicago will be the racecar built by Swedish tuner OlsbergsMSE driven by Tanner Foust and Brian Deegan. Ken Block and his newly renamed Hoonigan Racing Division will also be competing in the Fiesta ST.
The 2013 GRC season has not been announced yet, but the venues will also include the summer X Games events in Brazil, Spain, Germany and, of course, Los Angeles. Ford announced that it will be the sole automotive sponsor of this year's summer X Games, and it will be looking to bring home a gold medal this year after Block placed silver last year.
In other Ken Block- and Ford-related news, another Chicago debut will be a tuned Focus ST called the TrackSTer project. Built in cooperation with Block, Ford and automotive tuner fifteen52, the TrackSTer will get plenty of styling, performance and handling upgrades. Some of the add-ons include a performance exhaust and short-throw shifter from Ford Racing, a rebuilt engine, upgraded components such as the limited-slip differential, intercooler, engine controller and clutch as well as upgraded brakes.
Ford adding second supplier for F-150 frames
Mon, Aug 10 2015Metalsa, the company that builds steel frames for the aluminum-bodied Ford F-150, is still having trouble providing enough frames to supply the two factories that build the pickup. The snafu is preventing Ford from selling as many of the country's best-selling truck as it could, and eating into profits - even though the bottom line is still breaking company records. According to The Wall Street Journal, Ford has picked Michigan company Tower International as a second frame supplier and expects to have inventory up to a proper level at the beginning of Q4 of this year. Neither Ford nor Tower would confirm the development - Automotive News got comments from a source and pieced together bits of info from Tower's financial statements and local press reports. Tower currently builds body structures for several vehicles, including the F-series, and the Bellevue, Ohio factory that will build F-150 frames previously manufactured frames for the Ranger and Econoline. According to a story in the local Sandusky Register, Tower will add one production line at the end of next month to begin shipping frames in October, and another line in April 2016. Something like 138 full-time workers and 364 robots are expected to carry out the work. Tower's most recent financial statement said that capital investment will be necessary to get everything set up, but the contract will be worth $140 million in yearly revenue.
