Find or Sell Used Cars, Trucks, and SUVs in USA

2005 Ford F-450 4x4 Diesel 6 Speed Landscape Dump Body Truck on 2040-cars

US $22,000.00
Year:2005 Mileage:68476
Location:

Lebanon, Pennsylvania, United States

Lebanon, Pennsylvania, United States
Advertising:

Auto Services in Pennsylvania

Wayne Carl Garage ★★★★★

Auto Repair & Service
Address: 326 W Ridge Pike, Linfield
Phone: (610) 489-7153

Union Fuel Co ★★★★★

Automobile Parts & Supplies, Fuel Economizers
Address: 700 Bushkill Dr, Wind-Gap
Phone: (610) 253-6215

Tint It Is Incorporated ★★★★★

Auto Repair & Service, Window Tinting, Glass Coating & Tinting
Address: 6230 Greenway Ave, Folsom
Phone: (215) 724-8886

Terry`s Auto Glass ★★★★★

Auto Repair & Service, Glass-Beveled, Carved, Etched, Ornamental, Etc, Windshield Repair
Address: West-Alexander
Phone: (724) 523-6553

Terry`s Auto Glass ★★★★★

Auto Repair & Service, Windshield Repair, Glass-Auto, Plate, Window, Etc
Address: 6314 State Route 30, Creighton
Phone: (724) 523-6553

Syrena International Ltd ★★★★★

New Car Dealers, Automobile Body Repairing & Painting, Towing
Address: 691 Bethlehem Pike, Foxcroft-Square
Phone: (215) 361-0500

Auto blog

New European charging network will offer speeds up to 350 kW

Tue, Nov 29 2016

It's about to get easier to fast-charge your electric vehicle across Europe thanks to four major automakers working together in a new joint venture. BMW, Daimler (Mercedes-Benz), Ford, and the VW Group (Audi and Porsche) have all signed a Memorandum of Understanding to install about 400 DC fast charging sites in Europe. As you may know, there are different types of fast chargers, but the ones that this group is talking about installing will be able to charge an EV in much less time than other stations. That's because these chargers will offer power levels of "up to 350 kW." Compare that to what's generally considered the current gold standard, the Tesla Superchargers, which have rates of up to 145 kW and a statement not that long ago from a Ford exec that suggested that 150 kW chargers would be the new normal. Of course, the Tesla chargers use the company's proprietary connector and the new network the JV is setting up will use the CCS standard. The first new stations will go up in 2017 and those 400 sites are just the beginning. A joint statement by the JV says that EV drivers will "have access to thousands of high-powered charging points" by 2020 along highways and main roads. "The charging experience is expected to evolve to be as convenient as refueling at conventional gas stations," the companies said. While not every electric vehicle will be able to take advantage of the 350 kW charging rate, the companies involved would be silly to build the infrastructure without vehicles that can handle that kind of energy flow. The JV says it would welcome participation from other automakers and will cooperate with interested regional partners. Related Video: News Source: Daimler Green Audi BMW Ford Mercedes-Benz Porsche Volkswagen Electric fast charging

Ford Q3 pretax profits drop to $1.18B

Fri, 24 Oct 2014

Following positive third quarter financial results recently from General Motors, rival Ford took a tumble in Q3. The automaker posted pre-tax profits of $1.18 billion, compared to about $2.59 billion in Q3 2013, a drop of around 54 percent. Net income also suffered with $835 million made in the quarter, versus $1.272 billion last year, a decline of about 34 percent. The Blue Oval blamed the gloomy figures on three reasons in its release: "lower volume, higher warranty costs and adverse balance sheet exchange effects."
There were problems of one kind or another in practically every region. North America experienced higher warranty costs than expected, partially due to recalls. The sales volume for the quarter was 665,000 units, versus 725,000 in Q3 2013, and pre-tax results amounted to $1.41 billion versus $2.296 billion last year.
South America and Europe both posted worse pre-tax results than last year. On the bright side, European volume was up slightly to 321,000 vehicles, from 303,000 in Q3 2013. The Middle East and Africa also lost $15 million, but that was an improvement compared to the $25 million loss previously experienced in this region.

Ford bringing C-Max Solar Energi Concept to CES

Thu, 02 Jan 2014

Solar energy might not be enough to power a usable electric vehicle on its own, but that doesn't mean it can't lend a helping hand. And that's what Ford has in store for the Consumer Electronics Show opening next week in Las Vegas.
Ford has essentially taken its C-Max Energi plug-in hybrid and fitted it with the latest in solar panel technology developed by SunPower, acting like a magnifying glass to capture as much of the sun's energy as possible. So you get the benefit of an electric vehicle, with the range assurance of a hybrid, without needing to draw from the grid.
Ford estimates that a day of charging in the sunshine will give the C-Max Solar Energi concept the same full charge as the production PHEV, with a total range of 620 miles - 21 of which can be run on electric power alone. Otherwise the vehicle - which remains a concept for the time being - is identical to the existing C-Max Energi. The top-selling model in Ford's growing hybrid and electric vehicle portfolio helps put Ford just behind Toyota among the top seller of hybrids in America. Scope out the images in the gallery above and the video clip and press release below for a closer look.