1940 Ford Truck-3/4 Ton Flatbed .few Made.1857 Fewer Survived.heavy Duty Frame on 2040-cars
Bolinas, California, United States
Engine:Flathead V8
Body Type:truck
Vehicle Title:Clear
Exterior Color: green with black fenders
Make: Ford
Interior Color: Green
Model: F-100
Number of Cylinders: 8
Trim: complete
Drive Type: Rear
Cab Type (For Trucks Only): 4 window
Mileage: 6,639
Warranty: none
Sub Model: 3/4 ton Flatbed Commercial frame
Very rare truck. It has a 49 to 53 Mercury flathead V-8. This was the standard replacement for the original engines. It is a 1960 F 100 rear end. It has all new brakes including all the cylinders. The cooling system has been rebuilt. The only other upgrade is a 12 V system. All the fluids have been changed. There are a few chips in the paint. It is now registered in California. The three-quarter ton was built on a truck frame. Although this classified as a pickup: it is actually a flatbed. All of the lights work. It is eligible for an antique plate. These trucks were the workhorses of the postwar period very few survived in this condition. It has a four speed transmission. There are two ways to go with this truck. As the picture shows it has wooden floorboards that should be replaced and it would be a unique antique show vehicle. The second option is to upgrade it into a hot Rod. There are Automatic Transmissions that will fit without any cutting .Ask questions. 415-307-3790.
Ford F-100 for Sale
Auto Services in California
Windshield Repair Pro ★★★★★
Willow Springs Co. ★★★★★
Williams Glass ★★★★★
Wild Rose Motors Ltd. ★★★★★
Wheatland Smog & Repair ★★★★★
West Valley Smog ★★★★★
Auto blog
Ford and Chrysler reducing summer plant shutdowns
Wed, 22 May 2013Most domestic automaker assembly plants traditionally take a couple of weeks off during the summer. The shutdowns give each plant time for much needed repairs and maintenance, and in some cases, help better align production with demand. Not this year, though, as demand for many models is outstripping what Ford, Chrysler and General Motors plants can produce.
Ford has announced that it will shorten its annual summer shutdown for most North American plants from two weeks to one. The shorter shutdown will increase the carmaker's annual North American production by 40,000 units on top of the 200,000 extra units that it was already planning to produce this year versus last. Automotive News reports that Ford produced 2.8 million vehicles on this continent in 2012, and that output this year has already increased 13 percent through April.
Chrysler, meanwhile, is also operating at full tilt and plans to run some plants through the summer with no shutdown at all. Those not getting a break include Jefferson North where the Jeep Grand Cherokee and Dodge Durango are assembled, Toledo North that will assemble the new Cherokee, and Conner Avenue, home of SRT Viper production. Other assembly plants will be down for a single week, while all of Chrysler's engine and transmission plants except one in Indiana will continue operating with no shutdown this summer.
Submit your questions for Autoblog Podcast #324 LIVE!
Tue, 12 Mar 2013We're set to record Autoblog Podcast #324 tonight, and our friend Peter Leung (a.k.a. BaronVonClutch), who writes about racing for Richland F1 is going to teach us how to love the vroom-vroom. Drop us your questions and comments regarding the rest of the week's news via our Q&A module below. Subscribe to the Autoblog Podcast in iTunes if you haven't already done so, and if you want to take it all in live, tune in to our UStream (audio only) channel at 10:00 PM Eastern tonight.
Discussion Topics for Autoblog Podcast Episode #324
Geneva Motor Show highlights from Zach
Huge, pricey trucks haul jobs and profits for the Detroit Three
Tue, Feb 5 2019DECATUR, Texas — Mickey McMaster is on his 12th pickup truck. The 61-year old farm equipment dealer in Decatur, Texas, two weeks ago treated himself to a 2019 GMC Denali for around $69,000 — a reward for long hours at work. "For me this is the Cadillac of trucks, it's a real luxury vehicle," McMaster said. "I've worked my way up to afford a truck like this and it shows that I've earned it." McMaster is the kind of customer General Motors Co is banking on as it plans to add 1,000 jobs at a plant in Flint, Michigan that will build a new generation of its largest pickups. Demand from Texas and other heartland states for big pick-ups is providing a lifeline to many workers the No. 1 U.S. automaker is laying off at plants elsewhere. The Detroit Three automakers and thousands of their U.S. workers are counting on customers like McMaster to keep buying bigger and more luxurious pickup trucks even if overall U.S. vehicle demand weakens this year, as most analysts predict. At Flint, GM will build a new generation of its heavy-duty Chevrolet Silverado and GMC Sierras, including luxury models that are some of the most profitable vehicles on the planet. GM, Ford Motor Co and Fiat Chrysler Automobiles NV's Ram division own the segment and are each doubling down with new or redesigned models launching this year. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday celebrated the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. At the same time that GM is laying off thousands of U.S. workers and planning to shutter five North American factories, Flint is hiring. The plant runs on three daily shifts, six days a week. As the new model's assembly system ramps up, the plant's capacity will increase by more than 25 percent, plant manager Mike Perez told Reuters. The Flint plant plans to add 1,000 workers, more than half of the 1,500 factory workers who have asked to transfer from plants GM has targeted for shutdown as part of CEO Mary Barra's restructuring plan. "We're bringing in 50 to 100 people every week," said Perez. Workers last week were still finishing the job of retooling the Flint factory to build the new heavy-duty trucks as part of a $1.5 billion investment project.