1994 Ford Bronco Manual Transmission on 2040-cars
Grand Ledge, Michigan, United States
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Number of Cylinders: 8
Make: Ford
Model: Bronco
Warranty: Vehicle does NOT have an existing warranty
Mileage: 94,206
Sub Model: 105" WB XLT
Power Options: Cruise Control
Exterior Color: Green
Interior Color: Gray
Ford Bronco for Sale
- Lifted 1996 bronco sport, low miles, 4x4(US $6,500.00)
- 1976 ford bronco rock crawler tube buggy! atlas 2! 302 v8! msd! king pin! danas!(US $10,950.00)
- 1975 ford bronco"sport-ranger"edition302ci v8~auto~rustfree~runsgrt~hard&softtop
- 1989 ford bronco xlt 5.8 v8 project no reserve
- 1969 ford bronco(US $16,500.00)
- 1980 ford bronco lifted- built 460 - 40(US $5,995.00)
Auto Services in Michigan
Waterford Collision Inc ★★★★★
Varney`s Automotive Parts ★★★★★
Tuffy Auto Service Centers ★★★★★
Tuffy Auto Service Centers ★★★★★
Tri County Motors ★★★★★
The Brake Shop ★★★★★
Auto blog
Ford and Chrysler reducing summer plant shutdowns
Wed, 22 May 2013Most domestic automaker assembly plants traditionally take a couple of weeks off during the summer. The shutdowns give each plant time for much needed repairs and maintenance, and in some cases, help better align production with demand. Not this year, though, as demand for many models is outstripping what Ford, Chrysler and General Motors plants can produce.
Ford has announced that it will shorten its annual summer shutdown for most North American plants from two weeks to one. The shorter shutdown will increase the carmaker's annual North American production by 40,000 units on top of the 200,000 extra units that it was already planning to produce this year versus last. Automotive News reports that Ford produced 2.8 million vehicles on this continent in 2012, and that output this year has already increased 13 percent through April.
Chrysler, meanwhile, is also operating at full tilt and plans to run some plants through the summer with no shutdown at all. Those not getting a break include Jefferson North where the Jeep Grand Cherokee and Dodge Durango are assembled, Toledo North that will assemble the new Cherokee, and Conner Avenue, home of SRT Viper production. Other assembly plants will be down for a single week, while all of Chrysler's engine and transmission plants except one in Indiana will continue operating with no shutdown this summer.
2014 Ford Fiesta Titanium
Mon, 28 Oct 2013You might not be interested in owning a subcompact (B-segment) hatchback for $20,000. Let's be clear from the get go here: there are any number of reasonable arguments for staying away from the highest-content versions of these small cars. Ford's player in the B-segment arena is the newly updated 2014 Fiesta, and the Titanium trim represents the most luxurious instantiation of the model. We recently were loaned a Fiesta Titanium for a week, whose final sticker price hit $20,390, with navigation being the only standalone option added to the bottom line. By way of comparison, the most basic version of the all new, one-segment-up Mazda3 hatchback costs $19,740 with delivery and destination accounted for, and no options added on.
Hold on to that thought for a moment, we'll get back to it.
2015 F-150 launch to curb Ford profits?
Thu, 30 Jan 2014Ford is making a big bet on aluminum with its new 2015 F-150, and it's possible that the decision will hurt the company financially, at least in the short term. After earning a record $8.6 billion in 2013, the Blue Oval does not expect to set another record in 2014. According to Automotive News, that's "largely attributable to F Series," says Bob Shanks, Ford's Chief Financial Officer.
To retool for the new F-150, Ford will idle its Dearborn Truck Plant in Michigan for 11 weeks and the Ford Kansas City Assembly Plant in Missouri for 2 weeks. "3 of the 13 overall weeks occur during what normally is our summer shutdown timeframe," said Mike Levine, Ford Trucks Communication Manager, in an email to Autoblog. The extra 10 weeks will be preparing for the more aluminum-intensive construction for the trucks and will mean over 2 months of no F-150s being made. For comparison's sake, Chrysler boss Sergio Marchionne just confirmed that the 200 plant in Sterling Heights, MI will be down for 30 days to retool for the new model, but obviously there are many more F-150 production variables than for the midsize sedan.
Levine notes that Ford is already running three shifts at both plants, and says the automaker has plans to ensure that there is adequate supply of the full-size pickups during the retooling process. The company does not want to suffer a shortage of the vehicle that accounted for 31-percent of its 2013 US sales and an even bigger percentage of its profits.