2015 Chevrolet Silverado 2500 Ltz on 2040-cars
850 W National Rd, Vandalia, Ohio, United States
Engine:6.0L V8 16V MPFI OHV
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1GC1KWEG2FF100596
Stock Num: N150000
Make: Chevrolet
Model: Silverado 2500 LTZ
Year: 2015
Exterior Color: Blue Topaz Metallic
Options: Drive Type: 4WD
Number of Doors: 4 Doors
*********** If you have any questions or would like to schedule an Appointment for your test drive or our hassle free vehicle appraisal, Please feel free to contact me. Thank You Chad Valerio Internet Sales Manager 888-437-5205 Internetsales@Smedleys.com ***********
Chevrolet Silverado 2500 for Sale
2015 chevrolet silverado 2500 ltz(US $50,125.00)
2015 chevrolet silverado 2500 work truck(US $37,040.00)
2015 chevrolet silverado 2500 lt(US $41,955.00)
2015 chevrolet silverado 2500 lt(US $46,565.00)
2015 chevrolet silverado 2500 work truck(US $36,885.00)
2015 chevrolet silverado 2500 ltz(US $60,285.00)
Auto Services in Ohio
Yonkers Auto Body ★★★★★
Western Reserve Battery Corp ★★★★★
Walt`s Auto Inc ★★★★★
Valvoline Instant Oil Change ★★★★★
Valvoline Instant Oil Change ★★★★★
Tritex Corporation ★★★★★
Auto blog
GM to idle Indiana truck plant for two weeks over chip shortage
Fri, Mar 25 2022WASHINGTON —General Motors said Friday it will idle for two weeks in April an assembly plant in Indiana that builds pickup trucks, over ongoing semiconductor chip shortages. The Detroit automaker said it will halt production at its Fort Wayne assembly plant, which builds the Chevrolet Silverado 1500 and GMC Sierra 1500, for two weeks starting April 4. "There is still uncertainty and unpredictability in the semiconductor supply base, and we are actively working with our suppliers to mitigate potential issues moving forward," GM said Friday. The automaker said this is its first semiconductor-related full-size truck production downtime since August. GM noted that overall it has "seen better consistency in semiconductor supply through the first quarter compared to last year as a whole. This has translated into improvement in our production and deliveries during the first three months of the year." GM Chief Executive Officer Mary Barra met with some lawmakers on Capitol Hill this week, including Republican Senator Todd Young of Indiana. GM is backing a bill in Congress to provide $52 billion in government subsidies to boost U.S. semiconductor manufacturing. GM said that legislation could help "alleviate the ongoing shortage that continues to impact U.S. automotive manufacturing." (Reporting by David Shepardson; editing by Jonathan Oatis) Related video:
GM delaying additional Silverado EV and Sierra EV production to Q4 2025
Tue, Oct 17 2023This looks like more "Gotcha!" news about storms in the EV sector, but the word "additional" is key here. The Detroit News reported today that GM is pushing delaying production of the Chevrolet Silverado EV and GMC Sierra EV pickups at the Orion Assembly Plant to late 2025, about a year behind expectations. The Silverado EV Work Truck is already in production at GM's Factory Zero in Detroit, which won't change. Retail versions of the Silverado EV are still planned for production at Factory Zero before the end of this year, and the Sierra EV is expected to enter production at Factory Zero early next year. This new plan simply means GM won't add more production of those electric trucks at Orion. GM builds the Chevrolet Bolt at Orion right now, assembly of that groundbreaking car to end this year. GM's original idea was to spend $4 billion to convert Orion to EV pickup production in time to get its two giant profit makers rolling down lines in early 2025. The move to late 2025 could mean the plant is out of commission for about two years. The facility's 1,261 employees are being offered spots in other plants, including Factory Zero. The automaker gave several reasons for the move, a spokesperson telling The Detroit News the company wants "to better manage capital investment while aligning with evolving EV demand," and telling the Detroit Free Press, "We're looking at EV demand and the trendline for EVs is stabilizing. ... It is not rising as fast as originally forecasted." On top of that, engineers "have identified engineering improvements that we will implement to increase the profitability of our products." The spokesperson also made it clear that the delay has nothing to do with the UAW strike, now in its 32nd day. Factory Zero's working up to a near-term production capacity of about 600,000 units annually, GM saying it wanted to get capacity to 1 million EVs annually by the end of 2025. At the moment, the site builds the Silverado EV Work Truck, the GMC Hummer EV pickup and SUV, and the Cruise Origin shuttles — not the Bolt taxis, the autonomous pods. The Detroit News reported GM sold 18 Silverado EV Work Trucks in Q3 this year, GM Authority says GMC Hummer EV production has ramped up to about 3,000 units per month, and Cruise Origin is still waiting on approval from the National Highway Safety Traffic Administration to mass-produce the autonomous shuttles because the shuttles need an exemption for not having steering wheels.
Refreshed 2014 Camaro confirmed for New York debut
Thu, 07 Mar 2013We've already seen leaked specs and potential spy shots, but the refreshed 2014 Chevrolet Camaro will make its official debut at the New York Auto Show in a few weeks.
Besides a tweaked exterior and the possibility of a high-output LS7 under the hood, we really don't know much else about the 2014 Camaro, but here's hoping for an improved interior, too.
In addition to the refreshed Camaro, Chevrolet will also be showing off the recently introduced Chevrolet SS, making its debut on the auto show circuit, and we'll also get our first look at the C7 Corvette coupe and convertible side-by-side.
