Find or Sell Used Cars, Trucks, and SUVs in USA

Monte Carlo Ss 5 Spd. on 2040-cars

Year:1987 Mileage:98000
Location:

Bloomingdale, New Jersey, United States

Bloomingdale, New Jersey, United States
Advertising:

. 1987 Monte Carlo SS 350cu,5spd transmission. Engine is a 2004 vortec engine. The trans is a 1984 rebuilt t-4 with a hurst shifter. New or almost new items on car. Dynomat,carpet,tach rebuild,all new bulbs in dash,exh,trans,fuel pump,gas tank and hoses,shocks,totally rebuilt front end,and tires. It needs the radio to be rebuilt, I have the fact. radio, needs both front speakers, small rust coming through on driver side lower extention, small rust hole in trunk same side. Car runs and drives great. I have nothing to hide about the car. car has t-tops , they don't leak but its going to need the rubber replaced in the near future. The car is garage kept. Paint is good but it will need the fact. stripes. The car has about 350hp and the red line is 6k. the car has 500miles since the conversion.

Auto Services in New Jersey

XO Autobody ★★★★★

Automobile Body Repairing & Painting
Address: 2906 W 12th St, Fort-Hancock
Phone: (718) 338-4600

Wizard Auto Repairs Inc ★★★★★

Auto Repair & Service
Address: 819 66th St, Kenilworth
Phone: (718) 745-7370

Trilenium Auto Recyclers ★★★★★

Automobile Parts & Supplies, Automobile Salvage, Used & Rebuilt Auto Parts
Address: 464 US Highway 202 #B, Hampton
Phone: (866) 595-6470

Towne Kia ★★★★★

New Car Dealers
Address: 3101 State Route 10, Liberty-Corner
Phone: (866) 595-6470

Total Eclipse Master of Auto Detailing, Inc. ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Accessories
Address: 113 Jefferson Ave, Newark
Phone: (718) 668-2345

Tony`s Garage ★★★★★

Auto Repair & Service
Address: 200 N Main St, Pennsauken
Phone: (215) 646-1027

Auto blog

Use this PowerPoint when convincing your spouse to let you buy a Corvette

Thu, 14 Feb 2013

When you are not the one in charge of the purse strings, creativity is a must when trying to get the string-holder to bankroll that next shiny object you just can't live without.
When I was a kid, I decided that life wasn't worth living if it weren't in pursuit of owning a GMC Typhoon. My 12-year-old self crafted a fiscal strategy that, when combined with my offer of a 49-percent share of ownership in the car in return for my parents' contribution of 80-percent of the purchase price, would see me behind the wheel of a Typhoon by the time I hit college. They walked away from the negotiating table and, the economic climate of the 8th grade being what it was at the time, another partner wasn't found before the Typhoon was discontinued.
Roy El-Rayes, however, has succeeded where 12-year-old me failed, and he did it by using the sort of professionalism that only a PowerPoint presentation can provide, along with some humor and bold-faced flattery.

Next-gen Chevy Silverado and GMC Sierra may use carbon fiber

Thu, Dec 7 2017

It's been generally accepted that the next generation of full-size GM trucks will use some sort of strong, lightweight material for the beds while retaining steel for the cab. While aluminum seems like the most obvious choice, according to Automotive News, the Chevy Silverado and GMC Sierra will incorporate both aluminum and carbon fiber in their beds. The publication cites sources from within GM, though it seems the introduction of this comparatively exotic material mix is still a few years off. While carbon fiber is both stronger and lighter than steel and aluminum, it takes significantly more time and money to produce, essentially relegating the material to small-volume cars. The main benefit for trucks is the resulting reduction in weight to improve fuel economy without sacrificing the tough, rugged capabilities truck buyers expect. The Ford F-150 made the switch to aluminum for the 2015 model year and it's proved highly successful. It seemed like it was only a matter of time before the competition followed suit. Automotive News says that the next-gen trucks will launch with aluminum beds and that it will take a couple of years before we'll see any carbon fiber incorporated into the design. Even then, only look for the composite material on higher-trim models, with a trickle down to lower-spec trucks possible further in the future. In 2011, GM announced it was working with Japan-based Teijin Limited on a carbon fiber reinforced thermoplastic. There's a good chance that material's introduction will be on trucks. Related Video: News Source: Automotive News Plants/Manufacturing Rumormill Chevrolet GM GMC Truck

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.