Rs Convertible Leather Heated Xm Nice on 2040-cars
Lewisville, Texas, United States
For Sale By:Dealer
Engine:3.6L 217Cu. In. V6 GAS DOHC Naturally Aspirated
Body Type:Convertible
Transmission:Automatic
Fuel Type:GAS
Cab Type (For Trucks Only): Other
Make: Chevrolet
Warranty: Vehicle has an existing warranty
Model: Camaro
Trim: LT Convertible 2-Door
Disability Equipped: No
Drive Type: RWD
Doors: 2
Mileage: 7,324
Drive Train: Rear Wheel Drive
Sub Model: LT
Number of Doors: 2
Exterior Color: Red
Interior Color: Gray
Number of Cylinders: 6
Chevrolet Camaro for Sale
Synergy green ss camaro wheels automatic(US $20,900.00)
Why buy new??? leather,manual,6 spd,one owner,clean fl carfax
2011 chevrolet camaro rs 2lt synergy green automatic(US $29,999.00)
1968 camaro rs superchaged, lotsa hp, all new, plenty invested!
1969 chevrolet camaro convertible v8 350 manual trans 10 bolt buckets nice look(US $26,999.00)
1999 white chevy camaro v6 3.8l t-bar top~ac~locks,windows~ps~tilt~am/fm/cd/aux(US $2,950.00)
Auto Services in Texas
World Tech Automotive ★★★★★
Western Auto ★★★★★
Victor`s Auto Sales ★★★★★
Tune`s & Tint ★★★★★
Truman Motors ★★★★★
True Image Productions ★★★★★
Auto blog
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
Kurt Busch to shake and bake (again) in Ricky Bobby car at Talladega
Sat, 19 Oct 2013Kurt Busch will channel Ricky Bobby for another NASCAR race, this time driving a Wonder-sponsored Chevrolet SS, in this weekend's Camping World RV Sales 500 at the Talladega Motor Speedway. Unlike past tie-ins, though, there's actually an element of sponsorship here (the "Me" car was done when Busch was running on a team without sponsorship).
It was arranged by Flower Foods, the new owner of the Wonder brand. Wonder was part of the bankrupt Hostess company, which temporarily exited the US market 2012, and set off the Great Twinkie Shortage.
Busch has made something of a habit of channeling characters from famous racing movies, most recently running Tom Cruise's City Chevrolet livery from Days of Thunder in a Nationwide Series race earlier this year. Busch kicked off his movie-inspired antics, though, at Talladega in 2012, when he raced El Diablo's ("It's like... Spanish for like a fighting chicken") "Me" car complete with a cougar on the hood. He even went so far as to channel the lovable idiot that is Ricky Bobby during the race, dropping a few catchphrases about macchiatos and slingshots.
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.