Find or Sell Used Cars, Trucks, and SUVs in USA

1970 Chevrolet Camaro Ss 4-speed~freshly Restored~show Or Drive Anywhere~nice!!! on 2040-cars

US $25,000.00
Year:1970 Mileage:120151 Color: Orange /
 Black
Location:

Roscoe, Illinois, United States

Roscoe, Illinois, United States
Advertising:
Transmission:Manual
Engine:350 v8
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Year: 1970
Interior Color: Black
Model: Camaro
Number of Cylinders: 8
Trim: " SS "
Warranty: Vehicle does NOT have an existing warranty
Drive Type: manual
Mileage: 120,151
Exterior Color: Orange
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Illinois

White Eagle Auto Body Shop ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 919 Lake St, Montgomery
Phone: (630) 923-5804

Tremont Car Connection ★★★★★

Used Car Dealers, Used Truck Dealers
Address: 101 S East St, Peoria
Phone: (309) 925-9051

Toyota Of Naperville ★★★★★

New Car Dealers, Used Car Dealers, Automobile Parts & Supplies
Address: 1488 W Ogden Ave, Warrenville
Phone: (630) 357-1578

Today`s Technology Auto Repair ★★★★★

Auto Repair & Service, Auto Oil & Lube, Truck Service & Repair
Address: 1235 E Walnut St, Mulkeytown
Phone: (618) 457-2151

Suburban Tire Auto Repair Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 1900 Lincoln Hwy, Montgomery
Phone: (630) 584-1866

Steve`s Tire & Service Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Oil & Lube
Address: 514 Liberty St, Rockdale
Phone: (815) 942-5080

Auto blog

Huge, pricey trucks haul jobs and profits for the Detroit Three

Tue, Feb 5 2019

DECATUR, Texas — Mickey McMaster is on his 12th pickup truck. The 61-year old farm equipment dealer in Decatur, Texas, two weeks ago treated himself to a 2019 GMC Denali for around $69,000 — a reward for long hours at work. "For me this is the Cadillac of trucks, it's a real luxury vehicle," McMaster said. "I've worked my way up to afford a truck like this and it shows that I've earned it." McMaster is the kind of customer General Motors Co is banking on as it plans to add 1,000 jobs at a plant in Flint, Michigan that will build a new generation of its largest pickups. Demand from Texas and other heartland states for big pick-ups is providing a lifeline to many workers the No. 1 U.S. automaker is laying off at plants elsewhere. The Detroit Three automakers and thousands of their U.S. workers are counting on customers like McMaster to keep buying bigger and more luxurious pickup trucks even if overall U.S. vehicle demand weakens this year, as most analysts predict. At Flint, GM will build a new generation of its heavy-duty Chevrolet Silverado and GMC Sierras, including luxury models that are some of the most profitable vehicles on the planet. GM, Ford Motor Co and Fiat Chrysler Automobiles NV's Ram division own the segment and are each doubling down with new or redesigned models launching this year. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday celebrated the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. At the same time that GM is laying off thousands of U.S. workers and planning to shutter five North American factories, Flint is hiring. The plant runs on three daily shifts, six days a week. As the new model's assembly system ramps up, the plant's capacity will increase by more than 25 percent, plant manager Mike Perez told Reuters. The Flint plant plans to add 1,000 workers, more than half of the 1,500 factory workers who have asked to transfer from plants GM has targeted for shutdown as part of CEO Mary Barra's restructuring plan. "We're bringing in 50 to 100 people every week," said Perez. Workers last week were still finishing the job of retooling the Flint factory to build the new heavy-duty trucks as part of a $1.5 billion investment project.

GM, UAW poaching Nissan workers in Tennessee

Tue, Sep 8 2015

General Motors and the United Auto Workers are going on a recruitment drive at the Spring Hill factory in Tennessee, and they're hoping to poach some skilled workers from Nissan's nearby plant in Smyrna, TN. The General and the union even bought a billboard advertising for industrial electricians near the Japanese automaker's facility, according to the Daily News Journal. The reason for the billboard was simple. "GM was short of electricians," said Tim Stannard, the president of the UAW local at Spring Hill, to the Daily News Journal. The factory currently builds the Chevrolet Equinox but has a contract to assemble the next generation of Ecotec engines and the Cadillac XT5, which replaces the SRX. Thanks to the $185-million deal, employment there is expected to double by May 2016, according to Stannard, with roughly 1,800 additional union jobs. Beyond just several billboards, GM has job postings online for the Spring Hill plant looking for workers with specific skills. There has already been some interest in the positions among Nissan employees, Stannard indicated. According to a recent study by the Center for Automotive Research, the average GM worker currently makes $58 an hour, including benefits. Comparatively, Nissan pays an average of $42 an hour with benefits. The General's number could change in the coming weeks because its contract with the UAW is about to expire, and higher wages are among the major negotiating points.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.