Find or Sell Used Cars, Trucks, and SUVs in USA

Collector on 2040-cars

Year:1965 Mileage:92000
Location:

Shawnee, Oklahoma, United States

Shawnee, Oklahoma, United States
Advertising:

"ORIGINAL"  1965 Chevrolet C10 Custom Pickup, Long wide Bed (New Flooring), Rebuilt- 283 Motor(professionally), Transmission- 3 speed on column, Factory Power Steering,

Factory Power Brakes, Factory Air-Conditioning, Aluminum Radiator, Am-Radio, Tinted Glass,  New Paint.   Price- $10,500.00 .    Serviced and ready to Drive Home.

Forsale Locally,  We reserve to end auction at any time a price is agreed upon.  Shipping is at  "BUYER EXPENSE"   Cash in Person (or) Bank Wire Transfer, Certified Bank Check,

But Truck will NOT LEAVE until CHECK CLEARS BANK, NO EXCEPTIONS!!             ( Crack in Windshield)  

Auto Services in Oklahoma

Tire Town ★★★★★

Automobile Parts & Supplies, Tires-Wholesale & Manufacturers, Tire Recap, Retread & Repair
Address: 1522 S Robinson Ave, Wheatland
Phone: (405) 232-6418

T Town Quality Cars ★★★★★

New Car Dealers, Used Car Dealers
Address: 9772 E 11th St, Catoosa
Phone: (918) 949-4250

Southside Transmissions ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 5649 S. Mingo Rd Bldg F, Coweta
Phone: (918) 622-3456

Sharp Motors Inc ★★★★★

Used Car Dealers, Wholesale Used Car Dealers
Address: 325 S Mill St, Salina
Phone: (918) 825-2170

Sangster Robt Garage ★★★★★

Auto Repair & Service
Address: 11th & Mulberry, Muldrow
Phone: (479) 474-1522

R & R Bumper & Truck Accessories ★★★★★

Automobile Parts & Supplies, Truck Accessories, Automobile Customizing
Address: 1915 SW 6th St, Fort-Sill
Phone: (580) 355-1068

Auto blog

GM to idle Indiana truck plant for two weeks over chip shortage

Fri, Mar 25 2022

WASHINGTON —General Motors said Friday it will idle for two weeks in April an assembly plant in Indiana that builds pickup trucks, over ongoing semiconductor chip shortages. The Detroit automaker said it will halt production at its Fort Wayne assembly plant, which builds the Chevrolet Silverado 1500 and GMC Sierra 1500, for two weeks starting April 4. "There is still uncertainty and unpredictability in the semiconductor supply base, and we are actively working with our suppliers to mitigate potential issues moving forward," GM said Friday. The automaker said this is its first semiconductor-related full-size truck production downtime since August. GM noted that overall it has "seen better consistency in semiconductor supply through the first quarter compared to last year as a whole. This has translated into improvement in our production and deliveries during the first three months of the year." GM Chief Executive Officer Mary Barra met with some lawmakers on Capitol Hill this week, including Republican Senator Todd Young of Indiana. GM is backing a bill in Congress to provide $52 billion in government subsidies to boost U.S. semiconductor manufacturing. GM said that legislation could help "alleviate the ongoing shortage that continues to impact U.S. automotive manufacturing." (Reporting by David Shepardson; editing by Jonathan Oatis) Related video:

LG Chem's troubled Chevy Volt battery plant hiring once again

Thu, Sep 25 2014

The Michigan battery plant known for paying its workers to do nothing has turned things around and is now hiring more workers, specifically to do something. South Korea-based LG Chem, which runs the factory to supply the Chevrolet Volt extended-range plug-in vehicle with its lithium-ion batteries, held a job fair recently to bring on 40 new employees in order to meet higher battery demand, according to WZZM, the ABC affiliate for Grand Rapids, MI. The LG Chem factory is in Holland, MI, about 30 miles west of Grand Rapids, and it made its first batteries last year. Prior to that, though, the factory gained notoriety after a US Department of Energy (DOE) probe found that workers there were getting paid to do, well, nothing. That's because demand for the battery packs was so low that it cost less for the plant to sit idle. The DOE was conducting the probe because of its financial grant to LG Chem. But that was then and today is today. LG Chem is looking to ramp up production in advance of the second-generation Volt. That 2016 model-year version is said to have a longer all-electric range and better performance and will ride on a new chassis, but few official details have surfaced. We will know more when we get our first look at the car at the Detroit Auto Show in January.

2015 Chevy Spark will have lighter, smaller battery

Thu, May 15 2014

As General Motors gets ready to release the 2015 Chevy Spark EV, it is retooling the Brownstown Battery Assembly to build a new battery system for the chirpy little electric car. The new Spark will lose a few pounds and kWh from its lithium-ion pack, but it will keep all of it's performance specs. The current Spark EV uses a 21-kWh lithium-ion battery pack with bits made by A123 Systems (known as B456 Systems during bankruptcy). For the 2015 model, GM is going to build a 19-kWh battery system in-house that will use 192 LG Chem cells. Losing a bit of energy capacity means that the battery system for the 2015 Spark EV will be 86 pounds lighter but it will keep the EPA-rated 82-mile range and 119 MPGe. The 2015 Spark EV also keeps its $26,685 (plus destination) starting price from the 2014 model. The car will once again qualify for a federal tax credit of up to $7,500. LG Chem also supplies the cells for GM's other plug-in vehicles from its facility in Western Michigan. The Brownstown production line currently builds the battery packs for the Chevy Volt, the Opel Ampera and the Cadillac ELR. You can read our first drive of the 2014 Chevy Spark here. Brownstown Battery Assembly Expands Capabilities Will build battery system for 2015 Chevrolet Spark EV 2014-05-14 DETROIT – General Motors will bring all its electric vehicle battery building capabilities in-house with production of battery systems for the 2015 Chevrolet Spark EV at its battery assembly plant in Brownstown, Mich. "Using our in-house engineering and manufacturing expertise enabled us to deliver a battery system that is more efficient and lighter than the 2014 Spark EV without sacrificing range," said Larry Nitz, executive director of GM global transmission and electrification engineering. "Our successful working relationship with LG Chem has allowed us to deliver a new battery system for the Spark EV that helps us to better leverage our economies of scale." A newly designed battery system features an overall storage capacity of 19 kWh and uses 192 lithium ion cells. The cells are produced at LG Chem's plant in Holland, Mich. The battery system weight of 474 lbs. is 86 pounds lighter than the system in the 2014 Spark EV. The Spark EV battery is built on a dedicated production line at Brownstown, which also manufactures complete battery packs for the Chevrolet Volt, Opel Ampera and Cadillac ELR.