2001 Ford Taurus Se 2-valve Sedan 4-door 3.0l on 2040-cars
Dayton, Ohio, United States
Vehicle Title:Clear
Transmission:Automatic
Body Type:Sedan
Fuel Type:FLEX
For Sale By:Dealer
Mileage: 148,000
Make: Ford
Sub Model: ses
Model: Taurus
Exterior Color: Gray
Trim: SE 2-Valve Sedan 4-Door
Interior Color: Gold
Warranty: Vehicle does NOT have an existing warranty
Drive Type: FWD
Number of Cylinders: 6
Options: Cassette Player
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows
Number of Doors: 4
Excellent Running Vehicle
Flex Fuel
Power Windows and Locks
AC and Heat Works
(Fuel Guage is stuck, Heater core could be bad,steams up sometimes)
Ford Taurus for Sale
- Heated a/c leather push start option 301a myford touch rear camera free shipping(US $24,995.00)
- Heated a/c leather push start option 301a myford touch rear camera free shipping(US $23,995.00)
- 2013 ford taurus limited /no reserve/leather/navi/sync/ camera/sensors/clean/ac
- 1996 ford taurus gl wagon 4-door 3.0l(US $3,600.00)
- Dependable, affordable, luxury 1999 ford taurus se leather
- 13 ford taurus 4 door sedan limited, leather, sunroof, sony audio!
Auto Services in Ohio
Williams Auto Parts Inc ★★★★★
Wagner Subaru ★★★★★
USA Tire & Auto Service Center ★★★★★
Toyota-Metro Toyota ★★★★★
Top Value Car & Truck Service ★★★★★
Tire Discounters Inc ★★★★★
Auto blog
2015 F-150 launch to curb Ford profits?
Thu, 30 Jan 2014Ford is making a big bet on aluminum with its new 2015 F-150, and it's possible that the decision will hurt the company financially, at least in the short term. After earning a record $8.6 billion in 2013, the Blue Oval does not expect to set another record in 2014. According to Automotive News, that's "largely attributable to F Series," says Bob Shanks, Ford's Chief Financial Officer.
To retool for the new F-150, Ford will idle its Dearborn Truck Plant in Michigan for 11 weeks and the Ford Kansas City Assembly Plant in Missouri for 2 weeks. "3 of the 13 overall weeks occur during what normally is our summer shutdown timeframe," said Mike Levine, Ford Trucks Communication Manager, in an email to Autoblog. The extra 10 weeks will be preparing for the more aluminum-intensive construction for the trucks and will mean over 2 months of no F-150s being made. For comparison's sake, Chrysler boss Sergio Marchionne just confirmed that the 200 plant in Sterling Heights, MI will be down for 30 days to retool for the new model, but obviously there are many more F-150 production variables than for the midsize sedan.
Levine notes that Ford is already running three shifts at both plants, and says the automaker has plans to ensure that there is adequate supply of the full-size pickups during the retooling process. The company does not want to suffer a shortage of the vehicle that accounted for 31-percent of its 2013 US sales and an even bigger percentage of its profits.
Popular Science magazine's Best Of What's New 2012 all ate up with cars
Tue, 20 Nov 2012Popular Science has named the winners in its Best of What's New awards, the victors coming in the categories of aerospace, automotive, engineering, entertainment, gadgets, green, hardware, health, home, recreation, security and software. The automotive category did not go wanting for lauded advancements:
Tesla Model S: the Grand Award winner for being "the standard by which all future electric vehicles will be measured."
BMW 328i: it's 2.0-liter turbocharged four-cylinder gets called out for being more powerful and frugal than the six-cylinder it replaces.
Ford and Chrysler reducing summer plant shutdowns
Wed, 22 May 2013Most domestic automaker assembly plants traditionally take a couple of weeks off during the summer. The shutdowns give each plant time for much needed repairs and maintenance, and in some cases, help better align production with demand. Not this year, though, as demand for many models is outstripping what Ford, Chrysler and General Motors plants can produce.
Ford has announced that it will shorten its annual summer shutdown for most North American plants from two weeks to one. The shorter shutdown will increase the carmaker's annual North American production by 40,000 units on top of the 200,000 extra units that it was already planning to produce this year versus last. Automotive News reports that Ford produced 2.8 million vehicles on this continent in 2012, and that output this year has already increased 13 percent through April.
Chrysler, meanwhile, is also operating at full tilt and plans to run some plants through the summer with no shutdown at all. Those not getting a break include Jefferson North where the Jeep Grand Cherokee and Dodge Durango are assembled, Toledo North that will assemble the new Cherokee, and Conner Avenue, home of SRT Viper production. Other assembly plants will be down for a single week, while all of Chrysler's engine and transmission plants except one in Indiana will continue operating with no shutdown this summer.