Find or Sell Used Cars, Trucks, and SUVs in USA

2000 Vw Beetle Tdi - Needs Engine & Transmission on 2040-cars

Year:2000 Mileage:132347
Location:

Indianapolis, Indiana, United States

Indianapolis, Indiana, United States
Advertising:

NO ENGINE OR TRANSMISSION!!! Project vehicle that will need towed. I can help push it on trailer but winch would be best.

**** RELISTED DUE TO REFUSAL TO PICKUP **** (I can't wait forever!)

Please don't bid if you don't intend to buy (meaning you intend to drive to Indianapolis with a trailer to buy a vehicle that doesn't have an engine or transmission or intercooler!)

 Hi.  Selling a 2000 VW Beetle TDI automatic that donated its engine to another project (Vanagon mTDI).  Only includes body as the transmission has already been sold.  I've owned this car since 2008 and she was a great running car as you can see in the attached video of her last day on the road.  A year ago I had the AC Compressor and dryer replaced (looking for receipt but remember it was $1100), when I removed the engine I tied the AC compressor to the body and kept it charged for you.  Should be able to attach engine and blow cold air!  I replaced everything front suspension last year and then accidentally took the train tracks by my house to fast and killed the struts, so that will need repaired if you want this for more than the body.  Hood does latch it just wasn't for the pictures, tiny plastic clip for release broke when removing engine so I left it open. She was in a minor accident a few years ago that tore the front bumper cover and dinged the hood, real bumper under the cover looks untouched.  Interior is fair, the leather on the door panels is loose but seats are nice except for small tear on drivers side (back seat is not in the pictures but has recently been installed).  If you have any questions feel free to ask or make me an offer!   Car is located in Indianapolis, INDIANA and I only accept pickup. Cash, or Paypal payment only.  NO SHIPPING!!

YES, This is the 4th time trying to sell this car. All I require is the deposit, and follow thru with the pickup with the remaining balance. SIMPLE.

I went out to the car for a total missing list:
-Engine
-Transmission
-Intercooler
-Radiator Fan
-Diesel Fuel Cooler

I am not removing parts from this car. It is just sitting in my garage taking up space! Engine was removed in April and it has been garage kept since. Looks like we bumped one of the brake lines by the master cylinder when removing engine, it still holds pressure but I would replace it before hitting the road. Car comes with an extra rim and tire but needs atleast 2 tires.

Vehicle Purchase Plan: -$200 Paypal Non-Refundable deposit due within 48 Hours.
-Remaining balance due at pickup (Cash or Paypal)
-Pickup within 10 days in Indianapolis, INDIANA MUST PICKUP BY 11/17/13 at 11PM!!! I can't wait longer for pickup.


Scott

Auto Services in Indiana

western metals ★★★★★

Auto Repair & Service, Towing, Automobile Salvage
Address: 10231 mckinley, Osceola
Phone: (574) 310-2274

Webb Ford Inc ★★★★★

New Car Dealers, Used Car Dealers, Wholesale Used Car Dealers
Address: 9809 Indianapolis Blvd, Highland
Phone: (219) 924-3400

Weatherford Auto & Truck Service ★★★★★

Auto Repair & Service, Truck Service & Repair
Address: 515 Meridian St, Oakville
Phone: (765) 643-0554

Watson Automotive ★★★★★

Auto Repair & Service
Address: 2044 Laurel St, Mooresville
Phone: (317) 838-8888

Wagner`s Auto Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Brake Repair
Address: 7820 W Washington St, Danville
Phone: (317) 244-9672

Tom O`Brien Chrysler Jeep Dodge -Greenwood ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Body Repairing & Painting
Address: 750 US Highway 31 N, Wanamaker
Phone: (317) 881-6791

Auto blog

Tesla Model Y and Cadillac CT5 | Autoblog Podcast #573

Fri, Mar 22 2019

In this week's Autoblog Podcast, Editor-in-Chief Greg Migliore is joined by Consumer Editor Jeremy Korzeniewski and Associate Editor Joel Stocksdale. They catch up on the Tesla Model Y, as well as the Cadillac CT5 and the brand's new naming structure. Afterward they talk about our driving the 2019 Mazda3, 2019 Volkswagen Golf GTI and 2019 Ford Ranger. Finally, the three editors take a lap around eBay looking for the best ways to spend $15,000 on a car. Autoblog Podcast #573 Get The Podcast iTunes – Subscribe to the Autoblog Podcast in iTunes RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Rundown Tesla Model Y unveiled Cadillac CT5 and Cadillac's new badging strategy Cars we're driving: 2019 Mazda3 2019 VW Golf GTI 2019 Ford Ranger How we'd spend $15,000 on eBay Feedback Email – Podcast@Autoblog.com Review the show on iTunes Related Video:

Skoda unveils Volkswagen Up!-based Citigo

Tue, 27 Sep 2011

This is the all-new Skoda Citigo, and if you're thinking that it looks rather familiar, that's because its Volkswagen-badged kin recently debuted at the 2011 Frankfurt Motor Show. That's right, the long-rumored Skoda version of Volkswagen's new Up! city car has finally arrived.
Buyers will have a choice of two 1.0-liter three-cylinder engines - one with 59 horsepower, the other with a 74 hp and a blistering 106 mph top speed - both mated to a five-speed manual transmission. Powerful they are not, but these three-bangers should prove to be extremely efficient, with Skoda quoting fuel economy numbers of 62.8 and 60.1 miles per gallon, respectively (on the European cycle).
Being a Skoda, the Citigo will go on sale in its home market of the Czech Republic this fall, with the rest of Europe getting the car next summer. Follow the jump for Skoda's official release.

Recharge Wrap-up: Audi's EV SUV to be built in Brussels, Mercedes-Benz to extend EV range

Thu, Jan 21 2016

European Union Industry Commissioner Elzbieta Bienkowska is demanding that Volkswagen compensate owners of cars affected by the diesel emissions scandal. She says European customers should receive the same goodwill compensation as American drivers, whom VW is providing with $1,000 worth of recompense. "The issue of compensation goes beyond the difference in the legal setup between the US and the EU and plays a fundamental role in viewing VW as a responsible and trustworthy company," says Bienkowska in a letter to Volkswagen CEO Matthias Mueller. Bienkowska has also requested detailed data about the vehicles and "corrective measures" VW is planning. Read more from Automotive News Europe. Mercedes-Benz will equip its plug-in vehicles with higher-capacity batteries as it expands its electric model range. While the PHEVs it has released so far have electric driving ranges between 14 and 20 miles, better batteries should extend that range starting around model years 2018 or 2019. After releasing a slew of plug-ins by the end of next year, Mercedes-Benz development director Dr. Thomas Weber says, "The next-generation vehicle will overcome the 30-km to 50-km hurdle and then the next generation after that will be 80-100 km when they run as pure electric cars." Read more at Green Car Reports, or from Motoring. Audi will build its pure electric SUV at its plant in Brussels, Belgium. The batteries for the vehicle based on the Audi E-Tron Quattro concept (perhaps to be called the Q6) will also be built at the Brussels plant when production begins in 2018. With this announcement comes news that production of the A1 will shift from Brussels to Martorell, Spain, while Q3 production will move from Spain to Gyor Hungary. Audi says the Brussels facility will "become a key plant for electric mobility at the Volkswagen Group." Read more at Green Car Congress, or in the press release below. Audi production network: ready for electric mobility - Premium manufacturer to produce large series of electric cars in Brussels as of 2018 - New models for Martorell (Spain) and Gyor (Hungary) - Audi CEO Rupert Stadler: "We are increasing our efficiency and bundling key competencies" Audi is preparing its international production network for the mobility of the future. Large series production of the first purely electric driven SUV from Audi will begin at the site in Brussels in 2018. The plant will also produce its own batteries.