2020 Volkswagen Tiguan 2.0t Se R-line Black on 2040-cars
Engine:2.0L TSI DOHC
Fuel Type:Gasoline
Body Type:4D Sport Utility
Transmission:Automatic
For Sale By:Dealer
VIN (Vehicle Identification Number): 3VV2B7AX8LM176837
Mileage: 73019
Make: Volkswagen
Trim: 2.0T SE R-Line Black
Features: --
Power Options: --
Exterior Color: Black
Interior Color: Gray
Warranty: Unspecified
Model: Tiguan
Volkswagen Tiguan for Sale
2021 volkswagen tiguan 2.0t se(US $25,400.00)
2020 volkswagen tiguan s 4motion sport utility 4d(US $16,999.00)
2018 volkswagen tiguan 2.0t sel 4motion suv w/navigation(US $22,990.00)
2018 volkswagen tiguan s fwd 2.0t(US $10,900.00)
2019 volkswagen tiguan s 4dr suv(US $12,500.00)
2016 volkswagen tiguan s 2.0 turbo awd(US $12,416.00)
Auto blog
Audi's Project Artemis woes could delay range of VW Group EVs
Tue, Jul 19 2022Two years ago, Audi's then new CEO Markus Duesmann announced his first big initiative called Project Artemis. The plan's marquee component is "to implement a new lighthouse project for Audi in record time," being "a highly efficient electric car scheduled to be on the road as early as 2024" on a brand new platform that would be shared with Porsche and Bentley. An ex-VW and -Porsche man named Alex Hitzinger, who'd also spent time at Apple working on the tech company's electric car, was brought on board to lead Project Artemis and come up with new ideas. Parent Volkswagen Group said it wanted to become "as agile as in a racing team," removing the bureaucratic molasses and bottlenecks interfering with getting the best product on the road in the best time. However, in any grand venture, failure comes before success. Automobilwoche reports that Artemis is struggling through issues large enough to push the product plans back by years. The issue, as it was with the ID.3 lineup on the eve of that car's launch, is software. Well, that's the latest, largest problem; Artemis has already been through copious struggles before getting to the software bit. Two months after Hitzinger came on, in December 2020, VW raised its EV volume target from 50% to 70% by 2030. That necessitated a rethink of the VW Group's entire platform strategy considering the far greater production scale. Hitzinger only lasted six months in the job, ousted in May 2021, supposedly because Audi believed his ideas were "not suitable for profitable series production" among other reasons. By that time, the pace of software development was already said to be six months behind schedule, with the Car.Software division working on VW.OS 2.0 "not yet running at the speed hoped for." Internal frictions were noteworthy and costly as well. VW's commercial division plant in Hanover was meant to build Artemis vehicles for Audi, Porsche and Bentley, but Automobilwoche reported in January of this year that Porsche paid a ""small three-digit million amount" — like $100 million or so — to get out of the deal mandating its vehicles come from the Hanover facility.  So Audi effectively brought Artemis in-house to lead vehicle development, and Car.Software turned into Cariad to get VW.OS and VW.AC, which stands for Automotive Cloud, to market. The first Audi vehicle under Project Artemis was planned to arrive by the end of 2024, a production version of the Grandsphere concept.
VW's diesel problems could end in criminal prosecution
Tue, Sep 22 2015It's not just auto industry insiders who are re-evaluating their thoughts on VW's diesel line-up following last week's bombshell accusation that the German automaker willfully installed software in almost a half-million diesel vehicles sold in the US to get around government emissions tests. Things are moving fast in what is already being called "dieselgate," but here are some of the big news items that we've learned since VW CEO Martin Winterkorn issued an apology yesterday. The biggest news is that both the US and German governments are looking into criminal prosecutions. Here, the US Justice Department has started a criminal investigation and Germany said that its Federal Motor Transport Authority will get involved. When the full history about all of this is written, two key players will be John German and Peter Mock from the International Council on Clean Transportation. They were the researchers responsible for actually calculating the emissions, and thus discovered that what was coming out of the tailpipe and what VW was telling the EPA did not match up. Once the EPA understood what was going on, it forced VW to either explain things all of its 2016 models would not receive certification. Sales of all VW diesels in the US have indeed been stopped, and the EPA says it will take a closer look at all light-duty diesel vehicles in the US. The re-engineered 2016 Volkswagen Passat is being launched in New York today. Two senior Volkswagen executives who were supposed to attend the event - Heinz-Jakob Neusser, VW's board member in charge of technical development and Herbert Diess, chairman of the VW brand's management board - have cancelled. An Audi vehicle is among the VW Group's vehicles affected by this issue, the A3 TDI. Given that VW has admitted in some fashion to installing the "defeat device" to get around the emissions tests, Audi's slogan "Truth In Engineering" now sounds less than perfect. Yes, there is already talk of class-action lawsuits. Nothing official is out yet, but expect to hear more about this in the near future.
New European charging network will offer speeds up to 350 kW
Tue, Nov 29 2016It's about to get easier to fast-charge your electric vehicle across Europe thanks to four major automakers working together in a new joint venture. BMW, Daimler (Mercedes-Benz), Ford, and the VW Group (Audi and Porsche) have all signed a Memorandum of Understanding to install about 400 DC fast charging sites in Europe. As you may know, there are different types of fast chargers, but the ones that this group is talking about installing will be able to charge an EV in much less time than other stations. That's because these chargers will offer power levels of "up to 350 kW." Compare that to what's generally considered the current gold standard, the Tesla Superchargers, which have rates of up to 145 kW and a statement not that long ago from a Ford exec that suggested that 150 kW chargers would be the new normal. Of course, the Tesla chargers use the company's proprietary connector and the new network the JV is setting up will use the CCS standard. The first new stations will go up in 2017 and those 400 sites are just the beginning. A joint statement by the JV says that EV drivers will "have access to thousands of high-powered charging points" by 2020 along highways and main roads. "The charging experience is expected to evolve to be as convenient as refueling at conventional gas stations," the companies said. While not every electric vehicle will be able to take advantage of the 350 kW charging rate, the companies involved would be silly to build the infrastructure without vehicles that can handle that kind of energy flow. The JV says it would welcome participation from other automakers and will cooperate with interested regional partners. Related Video: News Source: Daimler Green Audi BMW Ford Mercedes-Benz Porsche Volkswagen Electric fast charging