2012 Tundra Crewmax Platinum 11k Miles,dvd,navi,lifted,1.99% Financing on 2040-cars
Dallas, Texas, United States
For Sale By:Dealer
Engine:5.7L 5663CC 345Cu. In. V8 FLEX DOHC Naturally Aspirated
Body Type:Extended Crew Cab Pickup
Fuel Type:FLEX
Transmission:Automatic
Cab Type (For Trucks Only): Crew Cab
Make: Toyota
Warranty: Vehicle has an existing warranty
Model: Tundra
Trim: Limited Extended Crew Cab Pickup 4-Door
Disability Equipped: No
Drive Type: 4WD
Doors: 4
Mileage: 11,391
Drive Train: Four Wheel Drive
Sub Model: CREWMAX 4WD
Exterior Color: Black
Number of Cylinders: 8
Interior Color: Brown
Toyota Tundra for Sale
2007 toyota tundra v8 double cab 4 door trd sr5 pickup truck(US $20,995.99)
Sr-5 mega cab 17545 miles 5.7 v8 automatic trd off road package, flex fuel power(US $32,995.00)
2011 toyota tundra crewmax 4x4 leather 20" wheels 8k mi texas direct auto(US $35,480.00)
We finance!!! 2010 toyota tundra sr5 crewmax auto lift kit trd off road 20 rim(US $36,998.00)
We finance!!! 2010 toyota tundra crewmax platinum 4x4 flex-fuel roof nav rcam(US $37,998.00)
2011 toyota tundra sr5 crewmax rear cam hard tonneau!! texas direct auto(US $26,780.00)
Auto Services in Texas
Yale Auto ★★★★★
World Car Mazda Service ★★★★★
Wilson`s Automotive ★★★★★
Whitakers Auto Body & Paint ★★★★★
Wetzel`s Automotive ★★★★★
Wetmore Master Lube Exp Inc ★★★★★
Auto blog
Toyota offered $146.5 million to build Lexus ES in Kentucky
Thu, 18 Apr 2013Toyota posted a media advisory yesterday saying that Akio Toyoda, president of Toyota, and Jim Lentz, CEO of Toyota North America, would be making a production announcement tomorrow in New York City, and Automotive News reports that the automaker will be announcing a plan to domestically produce the Lexus ES. According to the report, numerous plants are competing to build the ES in North America, and the State of Kentucky has offered the automaker up to $146.5 million to build the luxury sedan at the Georgetown, KY assembly plant.
If Georgetown gets the ES, which has been built in Japan since its debut in 1989, it would be built alongside the Toyota Camry, which is somewhat ironic since in our review of the 2013 Lexus ES350, we wrote that this ES finally says "goodbye to its Camry roots." In order to get the whole amount offered, the article states that Toyota would have to invest $531.2 million and hire 570 full-time workers at the plant, which doesn't sound all that unreasonable since the plant would require an additional 50,000 units of annual production, not to mention the fact that the Georgetown facility is already at its capacity for building the Camry.
Toyota expanding Aichi's test EV infrastructure in Japan
Sun, Nov 2 2014OK, now we're really confused. In the US, Toyota has been telling anyone who cares to listen that the future of advanced-powertrain technology is hydrogen fuel-cell vehicles, not electric ones. In China, a Toyota joint venture is looking at EVs. Over in Japan? They've just decided to pony up a little more for testing electric-vehicle technology. Maybe something's lost in translation. Toyota has been running an electric-vehicle charging station trial project in Japan's Aichi Prefecture during the past couple of years and is now ready to expand that program, adding 43 new charging stations to the 104 already present. Many of the EVSEs are in municipal-owned properties or in mountainous areas (where EV batteries drain the fastest). Toyota's expanded program started running in Kariya City, Toyota City, Toyohashi City and Nagakute City this month, and testing will extend until the end of next March. There's more in Toyota's press release below. Toyota's electric-vehicle presence is limited here in the US, as the low-production RAV4 crossover is the only model sold here. Toyota executive Craig Scott was recently quoted as saying that the company questions whether there is sufficient demand in the US for pure electric vehicles. With that in mind, Toyota will debut its hydrogen fuel cell model in the US in 2015. Toyota to Test Expansion of EV and PHV Charging Infrastructure in Japan Toyota City, Japan, October 31, 2014-Toyota Motor Corporation announces that it will be testing electric vehicle charging infrastructure in Aichi Prefecture from November 1 until March 15, 2015. The tests will involve standard chargers for use with vehicles such as plug-in hybrid vehicles (PHVs) and electric vehicles (EVs). The tests will be conducted jointly with four municipalities (Kariya City, Toyota City, Toyohashi City, and Nagakute City) and two companies (Toyota Industries Corporation and UNY Co., Ltd.), all of which are located in Aichi Prefecture. Toyota conducted similar tests in FY2012 and FY20131. In addition to targeting commercial, tourist, and accommodation facilities as in past tests, this year's tests will also involve cultural and social service facilities (including some in hilly and mountainous areas). Multiple chargers will be installed at certain commercial facilities where charger use was heavy in last year's tests. The aim will be to ascertain the optimal number and location of charging stations and their ease of use.
2014 Toyota Corolla and Tundra production underway
Fri, 02 Aug 2013After months of leaked photos and speculative reports, Toyota finally unveiled its 2014 Corolla to the world in early July at a star-studded California party. The confetti has been swept up and the champagne flutes washed and stored, and now the real work can begin: production. Toyota has announced that its new C-segment player has begun rolling off the lines at its plants in Mississippi and Ontario, Canada this week ahead of the planned start of sales in September. What's more, the refreshed 2014 Tundra pickup has also segued into production in San Antonio, Texas.
Corolla production in Mississippi is still a relatively recent phenomenon, with the plant having begun assembly of the outgoing model in the fourth quarter of 2011, while Toyota's Cambridge, Ontario plant has been churning out the compact volume king since 1988. Conversely, the Tundra has been in production at the Texas facility since 2006, and Toyota projects that the plant will build its milestone one-millionth new vehicle in September, right around the time the reworked fullsize pickup goes on sale.