Find or Sell Used Cars, Trucks, and SUVs in USA

2012 Land Rover Defender 110, Mint Condition, European Model on 2040-cars

US $60,000.00
Year:2012 Mileage:9000
Location:

United States

United States
Advertising:

This is used but in like NEW condition European built very rear 2012 Land Rover Defender 110. Station Wagon 2.2tdi 4x4 VIN: SALLDHMR8CA422962 (Vehicle Identification Number) Engine: 2.2 litre 2198cc 4 cylinder Transmission: Manual Fuel Type: Diesel Mileage: 9000 km 2012 Land Rover Defender 110 diesel (tdi). 122hp turbo diesel engine, 6 speed gearbox with high + low transfer box with center diff lock. Cold Climate Pack and Full Size Spare Wheel. Mechanically, this car runs as one would expect for a like new vehicle with all systems working fine. Black Leather/Cloth combo interior - Excellent Condition, Air conditioning, Radio/CD, Electric windows, Drivers airbag, Remote central locking, Landrover front & rear rubber mats, Genuine interested parties only please and strictly no canvassers, dealers, dreamers and other timewasters. No silly offers please

The VIN for this car is SALLDHMR8CA422962
The car is located in Europe. Please contact to arrange shipping. Will ship world wide after a full payment is received. Contact us at www.entatny.com, +718-435-9888 Ask for Michael or Piter.

Auto blog

Jaguar opens new engine plant in the UK

Thu, 30 Oct 2014

The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.

SVR plans to tune electrified Jaguar-Land Rover models, but not the I-Pace

Sun, May 24 2020

Jaguar-Land Rover's SVR division has only put its name on high-horsepower gasoline-burning cars, like the XE Project 8 built in strictly limited numbers. It's open to the idea of tuning electrified models, whether they're electric or hybrid, but it confirmed it's not currently planning on making a spicier evolution of the I-Pace. "We will be developing electrified versions of our cars, be that fully electrified or plug-in hybrids," affirmed Michael van der Sande, the division's managing director, in an interview with Auto Express. But although the electric I-Pace (pictured) raced in a one-make race series held on the sidelines of Formula E events for two seasons, and SVR could credibly claim to inject track DNA into a street car, it stressed the I-Pace doesn't appear in its product plans for reasons that remain a little bit murky. Jaguar announced the end of the eTrophy series in May 2020, which might explain why it's reluctant to exploit racing's marketing power. "There are other various things we are working on which we can't talk about, but we're very interested in electrification. That's why we got involved in eTrophy," van der Sande clarified. "The technology transfer, the learning applies to that car and other cars but we're not planning an SVR I-Pace at the moment." His comments confirm we'll need to be patient to see what SVR's take on an electric or hybrid car looks like. One of the first electrified models to receive the go-fast treatment might be the next-generation XJ tentatively scheduled to make its debut before the end of 2020. It will be exclusively electric, though it won't look as radical as the I-Pace, so Jaguar will need to find a way to replace the hot-rodded XJR 575 model it positioned at the top of the last-generation model's line-up. It's not too far-fetched to speculate the next Range Rover also due out in the coming months will receive some degree of electrification, and it could spawn an SVR-tuned model, too. Related Video:    

Jaguar Land Rover cutting production in face of falling demand

Sat, Feb 8 2020

LONDON — Jaguar Land Rover will reduce or stop production on certain days at two of its British factories over the next few weeks as Britain's biggest carmaker pursues cost-cutting measures in response to falling demand. JLR posted a 2.3% drop in retail sales in the three months to the end of December and has targeted billions of pounds worth of savings to tackle falling diesel demand in Europe and a tough sales environment in China. The firm will halt production on selected days over a four-week period from late February at its Castle Bromwich factory in central England and stop production on some half or full days at its nearby Solihull facility until the end of March. "The external environment remains challenging for our industry and the company is taking decisive actions to achieve the necessary operational efficiencies to safeguard long-term success," the company said in a statement. "We have confirmed that Solihull and Castle Bromwich will make some minor changes to their production schedules to reflect fluctuating demand globally, whilst still meeting customer needs." The move is not connected to coronavirus, a spokeswoman said, which prompted Fiat Chrysler to warn on Thursday that a European plant could shut down within two to four weeks if Chinese parts suppliers cannot get back to work. Related Video: