Find or Sell Used Cars, Trucks, and SUVs in USA

1995 Land Rover Defender 90 Fastback 62k Miles on 2040-cars

US $43,800.00
Year:1995 Mileage:62700 Color: Beluga Black /
 grey
Location:

Needham, Massachusetts, United States

Needham, Massachusetts, United States
Advertising:
Transmission:Manual
Engine:V8
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
VIN: SALDV2288SA961274 Year: 1995
Exterior Color: Beluga Black
Model: Defender
Interior Color: grey
Trim: D90
Warranty: Vehicle does NOT have an existing warranty
Drive Type: 4 wheel drive
Mileage: 62,700
Sub Model: Defender 90 fastback
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Massachusetts

York Ford ★★★★★

Auto Repair & Service, New Car Dealers
Address: Ashby
Phone: (866) 787-1431

Westgate Tire & Auto Ctr ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 98 Westgate Dr, East-Taunton
Phone: (888) 603-6146

Universal Auto Body Inc ★★★★★

Automobile Body Repairing & Painting, Used Car Dealers, Wholesale Used Car Dealers
Address: 288 North Ave, Braintree
Phone: (781) 878-2244

Tom`s Automotive ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Brake Repair
Address: 25 Summit St, East-Princeton
Phone: (978) 824-2096

The Garage ★★★★★

Auto Repair & Service, Used Car Dealers, Wholesale Used Car Dealers
Address: 663 Main St, South-Weymouth
Phone: (508) 583-5955

Sorrenti Auto Services ★★★★★

Auto Repair & Service, Automobile Detailing, Automobile Diagnostic Service
Address: 0 Corwin Street, Glendale
Phone: (781) 850-5887

Auto blog

Jaguar Land Rover to cut $6.8 billion in costs

Tue, Nov 10 2015

Jaguar Land Rover reduce costs by $6.8 billion and will push annual production volume to 1 million vehicles under a secret project called Leap 4.5, according to Reuters. The British automaker wants to achieve these ambitious goals by the end of the decade to compensate for the changing market in China and to counteract the price of meeting stricter emissions standards around the world. Leap 4.5 won't mean firing workers or cutting the automaker's $4.5 billion annual research budget. JLR will instead find savings by underpinning more models with modular platforms and by adjusting its supply chain. Future factories like the one in Brazil and the proposed plant in Slovakia also won't be affected by the new strategy. Globally, JLR continues to grow, and deliveries are up two percent through October 2015 to 390,965 vehicles. Business just last month was up 24 percent year-over-year to 41,553 units. However, the auto market's downturn in China has taken a bite out the automaker's success because volume dropped there 32 percent in the third quarter, Reuters reported. A global volume of 1 million vehicles will mean more than doubling 2014's 462,678 deliveries, but JLR has made significant investments to boost production recently. In addition to the future factories, it opened its first plant in China last year and an engine assembly site in the UK. The company also signed a deal with Magna Steyr in 2015 to build an upcoming model in Austria. Related Video:

Jaguar Land Rover CEO: Wrong Brexit deal will cost thousands of UK jobs

Tue, Sep 11 2018

BIRMINGHAM, England — The wrong Brexit deal could cost tens of thousands of jobs, the boss of Britain's biggest carmaker Jaguar Land Rover warned on Tuesday, saying he had no idea whether his plants would be able to operate after Britain leaves the European Union next year. Ralf Speth also said that the company would not be able to build cars if customs checks meant that the motorway to and from the southern English port of Dover, which is used to transport components, becomes a "car park" due to snarl-ups of people no longer able to move freely among EU countries. Speth made the warning at a conference in Birmingham, central England, speaking shortly before Prime Minister Theresa May, who is battling to have her so-called Chequers Brexit plan accepted by many in her Conservative Party as well as the EU ahead of Britain's departure from the bloc on March 29. "A thousand (jobs were) lost as a result of diesel policy, and those numbers will be counted in the tens of thousands if we do not get the right Brexit deal," warned Speth, referring to redundancies made earlier this year at the firm. "Currently I do not even know if any of our manufacturing facilities in the UK will be able to function on the 30th," he said. The boss of JLR, which built nearly a third of Britain's cars last year, also said long-standing issues around low productivity in Britain could be compounded by a Brexit agreement which made the country less competitive. "It is thousands of pounds cheaper to produce vehicles for instance in Eastern Europe than in Solihull, and what decisions will I be forced to make if Brexit means not merely that costs go up but that we cannot physically build cars on time and on budget in the UK?" he said.Reporting by Costas Pitas

Jaguar Land Rover signs manufacturing contract with Magna Steyr

Thu, Jul 2 2015

Jaguar Land Rover is in the midst of implementing big plans. Those include a raft of new models, and a series of new manufacturing facilities to build them. It seems, however, that the former is outpacing the latter, as the British automaker has just announced a new manufacturing contract to have some of its vehicles built off-site. The latest deal is with Magna Steyr, the contract manufacturer based in Graz, Austria. That could see a Land Rover produced at the same facility that has handled the Mercedes G-Class since 1979, or a Jaguar at the same place that assembled the Aston Martin Rapide until 2012 when production was moved back to the UK. The big question at this point is just what JLR will choose to have Magna build on its behalf. The British automaker isn't saying at this point, but a spokesman confirmed to Autoblog that it will be a future product – not an existing line moved from its current production site to the contract manufacturer, as Mercedes recently did with the R-Class. A timeline wasn't announced at this early stage, either, but we're told it will take about 24 months before new Jaguars or Land Rovers start rolling out of the plant in Austria. Just what those new vehicles will be remains to be seen, but Jaguar Land Rover has a number of new products on their way. It is expected to reveal in the near future a new Defender, a replacement for the current LR4/Discovery, the new Evoque convertible, a new XJ flagship sedan, and possibly a new coupe and convertible to take the place of the old XK. We'll soon see the new Jaguar F-Pace, which may be followed by additional crossovers as well. The company also recently introduced the new XE, XF, and Discovery Sport models, though given the timeframes, they'll almost certainly be produced at JLR's existing facilities. It recently opened its first overseas plant in China, has another one under construction in Brazil, and is also said to be considering a plant in North America on either side of the US-Mexican border. Jaguar Land Rover Signs Contract Manufacturing Agreement With Magna Steyr Whitley, UK - Jaguar Land Rover has agreed a manufacturing partnership with Magna Steyr, an operating unit of Magna International Inc, to build some future vehicles in Graz, Austria.