1977 Jeep Cj 5 on 2040-cars
Dayton, Ohio, United States
Body Type:Convertible
Engine:258
Vehicle Title:Clear
Interior Color: Black
Make: Jeep
Number of Cylinders: straight 6
Model: CJ
Trim: amc
Drive Type: 3 speed
Options: 4-Wheel Drive
Mileage: 128
Number of Doors: 2
Sub Model: amc cj-5
Warranty: none
Exterior Color: lime green
Jeep CJ-5, soft doors and top, top has cracked back window, lime green body and dash. Jeep looks good from 20 feet back, up close it has cracked and bubbles in paint. Good running condition. Drum brakes, no power steering,4wheel drive, 3 speed , 31x15 tires, just tuned up and oil changed. I have jeep for sale locally and reserve the right to end auction at any time. mileage unknown, motor rebuilt years ago.Jeep does not smoke and makes no noise(.sales are final.no returns)
Jeep CJ for Sale
1975 cj 5 levi's edition renegade, amc 304 v8 3 speed 4x4
1971 cj5
Jeep cj5 hard top and doors,western plow, 6 clynder
Jeep cj7(US $7,500.00)
1975 jeep cj5(US $4,000.00)
1947 cj2 willy jeep military clone(US $16,000.00)
Auto Services in Ohio
Walt`s Auto Inc ★★★★★
Verity Auto & Cycle Repair ★★★★★
Vaughn`s Auto Svc ★★★★★
Truechoice ★★★★★
The Mobile Mechanic of Cleveland ★★★★★
The Car Guy ★★★★★
Auto blog
Stellantis to halt production at Melfi, Italy, car plant in April, union says
Mon, Mar 29 2021MILAN — Carmaker Stellantis will halt production at its plant in Melfi, southern Italy, April 2-12 because of low demand triggered by the COVID-19 crisis, the UILM union said on Monday. Production at the plant, where the world's fourth largest automaker makes Jeep Renegade and Compass models and the Fiat 500X compact SUV, has been repeatedly disrupted due to weak demand and semiconductor supply shortages. The FIM CISL union said last week the firm was considering permanently closing one of its two production lines at the Melfi plant to address excess capacity in Italy. European car registrations fell 23% year on year in the first two months of this year, according to industry data, as protracted coronavirus lockdowns and consequent uncertainty keep impacting spending decisions among families and businesses. UILM's Gianluca Ficco said on Monday the company told unions the latest Melfi production freeze was specifically due to low demand and not a result of the global chip shortage. A spokesman for Stellantis confirmed the plant would be closed in that April 2-12 period. All of Melfi's more than 7,000 workers would be put on a furlough scheme for the period. Â
Jeep planning on a Grand Wagoneer Hellcat?
Thu, Jul 19 2018Twitter guy and Finder of Things Hidden Bozi Tatarevic scored another gem: an internal ZF document referencing a Jeep Grand Wagoneer Trackhawk. Dating from at least early 2017, the German auto supplier paperwork pairs what would be a 6.2-liter V8-powered three-row Jeep with ZF's 8HP95X transmission. The Jeep Grand Cherokee Trackhawk uses the 8HP95 gearbox, a version of the 8HP90 transmission used in the Dodge Charger and Challenger Hellcats, but built for all-wheel-drive applications and with a choice of gear ratio sets. This doesn't mean we'll ever see a Grand Wagoneer Trackhawk, but it looks like Jeep's been thinking about it. Not only that, but the brand was thinking about it with the just-launched-for-2019 Hellcat engine. The ZF document lists 729 PS for the engine in the Jeep, or a hair shy of 718 horsepower — just one off the figure for the 2019 Charger and Challenger Hellcats. The listed production dates mean ZF planned for a build run of April 2017 to May 2017. The document also mentions the Rolls-Royce Cullinan with two sets of build dates: from January 2016 to February 2016, and from December 2017 to January 2018. That sounds like a run of prototypes, which could be how the Grand Cherokee Trackhawk got included in the paperwork. The document didn't reference any other Wagoneer versions. A Hellcat-powered Grand Wagoneer would make sense. The new luxo-Jeep will be built on a modified Ram platform at the Warren Truck Assembly Plant, and we know Ram's working on a Hellcat-bound Ram 1500 TRX. And the now-iconic engine in an SUV that hopes to become a new icon would be a treat for dealers who wonder if the Grand Wagoneer will arrive too late to succeed. Again, this doesn't mean we'll see anything of the kind. Chrysler also evaluated a 300 Hellcat, but nothing's come of it. And with the standard Wagoneer still several years away — the renovations at the Warren plant aren't due for completion until 2020 — any hi-po version could wait another year after launch, were such a thing to happen. Related Video: This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.
Stellantis is official: FCA and PSA merger finally sealed
Sat, Jan 16 2021MILAN — Fiat Chrysler and PSA sealed their long-awaited merger on Saturday to create Stellantis, the world's fourth-largest auto group with deep enough pockets to fund the shift to electric driving and take on bigger rivals Toyota and Volkswagen. It took over a year for the Italian-American and French automakers to finalize the $52 billion deal, during which the global economy was upended by the COVID-19 pandemic. They first announced plans to merge in October 2019, to create a group with annual sales of around 8.1 million vehicles. "The merger between Peugeot S.A. and Fiat Chrysler Automobiles N.V. that will lead the path to the creation of Stellantis N.V. became effective today," the two automakers said in a statement. Shares in Stellantis, which will be headed by current PSA Chief Executive Carlos Tavares, will start trading in Milan and Paris on Monday, and in New York on Tuesday. Now analysts and investors are turning their focus to how Tavares plans to address the huge challenges facing the group – from excess production capacity to a woeful performance in China. Tavares will hold his first press conference as Stellantis CEO on Tuesday, after ringing NYSE's bell with Chairman John Elkann. FCA and PSA have said Stellantis can cut annual costs by over 5 billion euros ($6.1 billion) without plant closures, and investors will be keen for more details on how it will do this. Marco Santino, a partner at consultants Oliver Wyman, said he expected Tavares to disclose the outlines of his action plan soon, but without divulging too many details at first. "He has proven to be the kind of person who prefers action to words, so I don't think he will make loud statements or try to over-sell targets," he said. Like all global automakers, Stellantis needs to invest billions in the years ahead to transform its vehicle range for the electric era. But other pressing tasks loom, including reviving the group's lagging fortunes in China, rationalizing its huge global empire and addressing massive overcapacity. "It will be a step by step process, also to allow the market to better appreciate every single move. I don't think we will have all the details before one year," Santino said.





