Find or Sell Used Cars, Trucks, and SUVs in USA

1951 Jaguar Xk120 Fhc on 2040-cars

US $32,500.00
Year:1951 Mileage:99999
Location:

Hotchkiss, Colorado, United States

Hotchkiss, Colorado, United States
Advertising:

Wonderful base to start a restoration. The body is in great condition. The frame is clean except where previous owners had made adjustments for putting in a Chrysler engine.  Many parts are included beyond what is shown in the pictures, these being: 5 chrome wire wheels in good condition, headlamp seals, ashtray, new headlamp chrome fender spears, new dual oil/ water gauge, new wiper arms and blades, and wood flooring kit. The body and frame are matching according to the Heritage Report. The original engine and gearbox did not come with the car when I purchased it--however, an XK120 engine and gearbox will be included should you desire it.  This is an early coupe, being the 119th one manufactured. 
The walnut burl dash and surround are beautiful, the carpet/boot kit is new, seats professionally reupholstered, grille excellent. Glass is good with the exception of the passenger side windshield which is plexiglass. Please feel free to contact me. 

Auto Services in Colorado

Windsor Car Care ★★★★★

Auto Repair & Service, Car Wash, Auto Oil & Lube
Address: 9640 E Alameda Ave, Aurora
Phone: (303) 343-8200

West Side Auto Body & Towing ★★★★★

Automobile Body Repairing & Painting, Automobile Body Shop Equipment & Supply-Wholesale & Manufacturers, Towing
Address: 9719 W Coal Mine Ave Suite P, Lowry
Phone: (720) 255-0343

Toyexus Service ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 700 S Broadway, Lone-Tree
Phone: (303) 722-0234

Tito`s Cash for Cars ★★★★★

Automobile Parts & Supplies, Automobile Salvage, Towing
Address: Foxton
Phone: (303) 250-5079

Suzuki-Mccloskey ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 6710 N Academy Blvd, Green-Mountain-Falls
Phone: (719) 685-7030

Red Rock Auto Clinic ★★★★★

Auto Repair & Service, Brake Repair
Address: 1840 W Uintah St, Colo-Spgs
Phone: (719) 471-3311

Auto blog

Jaguar Land Rover to cut $6.8 billion in costs

Tue, Nov 10 2015

Jaguar Land Rover reduce costs by $6.8 billion and will push annual production volume to 1 million vehicles under a secret project called Leap 4.5, according to Reuters. The British automaker wants to achieve these ambitious goals by the end of the decade to compensate for the changing market in China and to counteract the price of meeting stricter emissions standards around the world. Leap 4.5 won't mean firing workers or cutting the automaker's $4.5 billion annual research budget. JLR will instead find savings by underpinning more models with modular platforms and by adjusting its supply chain. Future factories like the one in Brazil and the proposed plant in Slovakia also won't be affected by the new strategy. Globally, JLR continues to grow, and deliveries are up two percent through October 2015 to 390,965 vehicles. Business just last month was up 24 percent year-over-year to 41,553 units. However, the auto market's downturn in China has taken a bite out the automaker's success because volume dropped there 32 percent in the third quarter, Reuters reported. A global volume of 1 million vehicles will mean more than doubling 2014's 462,678 deliveries, but JLR has made significant investments to boost production recently. In addition to the future factories, it opened its first plant in China last year and an engine assembly site in the UK. The company also signed a deal with Magna Steyr in 2015 to build an upcoming model in Austria. Related Video:

All-electric Jaguar XJ coming soon on platform shared with 'Road Rover'

Mon, Jun 24 2019

We've been posting on the likelihood of electric Jaguars for a while now, especially the XJ leading the charge as a new EV flagship. Rumors at the beginning of 2018 predicted an XJ EV on our doorstep by the end of 2018, the 50th anniversary year of the XJ. By April this year, it was looking like the battery-powered XJ would use the I-Pace platform and make an appearance sometime in 2019. Now, Automotive News Europe reports that during Jaguar Land Rover's Investor's Day presentations, the automaker said it would debut a "large SUV and a large premium sedan" on its Modular Longitudinal Architecture (MLA) suitable for EVs, hybrids and traditional ICE-powered cars. The sedan in question is the next-gen XJ. Nick Rogers, JLR's product engineering boss, said electric MLA vehicles will get 90.2-kWh batteries that return range of up to 400 kilometers (292 miles) on the European cycle. That would effectively be the same size battery as the I-Pace, which rides on its own one-off platform, and the same range; in the U.S., the I-Pace is rated at 234 miles. It's said the XJ's design, produced by former Jaguar design chief Ian Callum and his team, has already been cleared. It swaps the four-door body for a five-door, a la the Audi A7, and introduces a new design language for the car and the carmaker. Car and Driver says the new statement sedan aims to be "a cutting-edge alternative to the BMW 7 Series and Mercedes-Benz S-Class," and Autocar saying it will "remain Jaguar's flagship in preference to a large SUV, such as the rumored J-Pace." The point of introducing the EV first is to establish the car's technology and sporting credentials — hopefully before the Porsche Taycan and Audi E-Tron GT arrive. Eventually, an ICE version of the XJ powered by an Ingenium inline-six should come; that will welcome buyers not ready to make the all-EV switch, a necessary move in keeping with the XJ's competition for global sales with the S-Class and 7 Series. However, leaving room in the design for a conventional drivetrain will force compromises that the all-electric competition doesn't face. Production of the current XJ ends at the Castle Bromwich facility on July 5. The new sedan is slated to be "announced in the near future" and built at JLR's plant in Solihull, which assembles Land Rover products. The same MLA platform will support a road-focused Land Rover as a sibling to the XJ, dubbed the "Road Rover" internally.

Jaguar to expand Jaguar XKR-S GT production run?

Wed, 10 Apr 2013

According to a report in Autocar, demand for the Jaguar XKR-S GT is such that the English company could nearly double production from 30 to 50 cars. Such inflation can often incense those have already put deposits down, worried that they've both been lied to about the potentially diminished values of their cars, but Jaguar has made the announcement barely a day after the XKR-S GT was revealed and 50 still isn't that many vehicles.
Nothing in the Autocar report indicates the additional examples will not come to America, making the 500-horsepower superfast coupe a treat we can still call all our own. Jaguar didn't add horsepower but instead honed other aspects of the car to produce a GT that can lap the 'Ring nearly as quickly as a Ferrari 458 Italia, and the world should be the beneficiary, the company's brand director saying, "The real beauty of this project has been that it has extended our understanding of the elements involved in making a car go so fast, and that will feed back into all our road car programs." Sounds good to us.