1985 Gmc Sububan, Hot Rod, Classic, Custom, New Parts, Orignal Owners, Nice!!!!! on 2040-cars
Jackson, Wyoming, United States
![]() | |
| |
GMC Suburban for Sale
99 gmc suburban 4x4 extremely clean
1996 gmc suburban slt 7.4l vortec v8 k2500 suv 4x4 truck
1998 gmc suburban sierra slt 4wd,rust free,adult owned,very straight & clean
1999 gmc suburban 2500 turbo diesel 120k miles 6.5 liter rare black nice in pa
1987 gmc suburban(US $3,000.00)
Mechanics special(US $575.00)
Auto Services in Wyoming
Tire Den Tire Factory ★★★★★
HMH Truck Repair Shop ★★★★★
Green River Imports Plus ★★★★★
Capital City Performance & Audio ★★★★★
Auto Body Rebuilders ★★★★★
All About Tires ★★★★★
Auto blog
GM delaying additional Silverado EV and Sierra EV production to Q4 2025
Tue, Oct 17 2023This looks like more "Gotcha!" news about storms in the EV sector, but the word "additional" is key here. The Detroit News reported today that GM is pushing delaying production of the Chevrolet Silverado EV and GMC Sierra EV pickups at the Orion Assembly Plant to late 2025, about a year behind expectations. The Silverado EV Work Truck is already in production at GM's Factory Zero in Detroit, which won't change. Retail versions of the Silverado EV are still planned for production at Factory Zero before the end of this year, and the Sierra EV is expected to enter production at Factory Zero early next year. This new plan simply means GM won't add more production of those electric trucks at Orion. GM builds the Chevrolet Bolt at Orion right now, assembly of that groundbreaking car to end this year. GM's original idea was to spend $4 billion to convert Orion to EV pickup production in time to get its two giant profit makers rolling down lines in early 2025. The move to late 2025 could mean the plant is out of commission for about two years. The facility's 1,261 employees are being offered spots in other plants, including Factory Zero. The automaker gave several reasons for the move, a spokesperson telling The Detroit News the company wants "to better manage capital investment while aligning with evolving EV demand," and telling the Detroit Free Press, "We're looking at EV demand and the trendline for EVs is stabilizing. ... It is not rising as fast as originally forecasted." On top of that, engineers "have identified engineering improvements that we will implement to increase the profitability of our products." The spokesperson also made it clear that the delay has nothing to do with the UAW strike, now in its 32nd day. Factory Zero's working up to a near-term production capacity of about 600,000 units annually, GM saying it wanted to get capacity to 1 million EVs annually by the end of 2025. At the moment, the site builds the Silverado EV Work Truck, the GMC Hummer EV pickup and SUV, and the Cruise Origin shuttles — not the Bolt taxis, the autonomous pods. The Detroit News reported GM sold 18 Silverado EV Work Trucks in Q3 this year, GM Authority says GMC Hummer EV production has ramped up to about 3,000 units per month, and Cruise Origin is still waiting on approval from the National Highway Safety Traffic Administration to mass-produce the autonomous shuttles because the shuttles need an exemption for not having steering wheels.
GM cars and SUVs recalled for leaking transmission fluid
Thu, Nov 5 2020General Motors is recalling more than 194,000 vehicles from 2018 to 2020 due to transmission fluid leaks. The leaks stem from an auto stop-start component that may have been installed with loose or missing bolts. The leaking fluid can affect the transmission's performance, and if it leaks onto a hot exhaust component, could potentially cause a fire. GM says that to date, it knows of no accidents or injuries related to the defect. The issue affects models from all four GM divisions. From Chevrolet, the affected vehicles are: 2018 Malibu, 2018–2019 Cruze, 2018–2020 Equinox, 2018–2020 Traverse, 2019–2020 Blazer At Buick, the following models are included: 2018–2019 LaCrosse, 2019–2020 Encore, 2019–2020 Enclave, At GMC, the recall includes: 2018–2020 Terrain, 2019–2020 Acadia Cadillac has two affected vehicles: 2019–2020 XT4 and 2020 XT6 The recall is scheduled to begin in mid-December. Owners of the affected vehicles will be contacted. Dealers will inspect the transmission accumulator, and replace those with loose or missing bolts.
Which electric cars can charge at a Tesla Supercharger?
Sun, Jul 9 2023The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric. Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands. If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla. Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor. Here's how to charge up, depending on which EV you have: Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.










