2024 Gmc Sierra 2500 Denali Ultimate on 2040-cars
Engine:Duramax 6.6L V8 Turbodiesel
For Sale By:Dealer
Transmission:Automatic
Vehicle Title:Clean
VIN (Vehicle Identification Number): 1GT49XEY7RF403319
Mileage: 0
Drive Type: 4WD
Exterior Color: White
Interior Color: Brown
Make: GMC
Manufacturer Exterior Color: Summit White
Manufacturer Interior Color: Alpine Umber
Model: Sierra 2500
Number of Cylinders: 8
Number of Doors: 4 Doors
Sub Model: 4x4 Denali Ultimate 4dr Crew Cab SB
Trim: Denali Ultimate
GMC Sierra 2500 for Sale
2024 gmc sierra 2500 pro(US $59,626.00)
2023 gmc sierra 2500 at4(US $79,950.00)
2024 gmc sierra 2500 denali ultimate(US $90,549.00)
2020 gmc 2500 hd low miles!! 4x4(US $38,999.00)
2024 gmc sierra 2500 pro(US $56,659.00)
2024 gmc sierra 2500 pro(US $56,659.00)
Auto blog
J.D. Power customer survey of dealers counts Cadillac, Buick as big winners
Mon, 14 Apr 2014Cadillac and Buick have taken the trophies in J.D. Power's latest Customer Service Index Study examining satisfaction with dealer service. Surveying more than 90,000 owners and lessees of 2009-2013 model-year cars, the study found that those with pre-paid maintenance packages were ten percent more likely to buy their next car from the same brand.
Dealer satisfaction scores have improved overall, Cadillac nabbed the luxury segment ahead of Audi and Lexus, taking the crown that Lexus held last year. Buick keeps the mass-market dealer satisfaction win in the family, finishing ahead of Volkswagen and last year's winner GMC. The study also found that service department use of tablets increased customer satisfaction, as did "best practices" like "providing helpful advice." Who knew?
You can find details on those and more findings in the press release below.
GM to idle Indiana truck plant for two weeks over chip shortage
Fri, Mar 25 2022WASHINGTON —General Motors said Friday it will idle for two weeks in April an assembly plant in Indiana that builds pickup trucks, over ongoing semiconductor chip shortages. The Detroit automaker said it will halt production at its Fort Wayne assembly plant, which builds the Chevrolet Silverado 1500 and GMC Sierra 1500, for two weeks starting April 4. "There is still uncertainty and unpredictability in the semiconductor supply base, and we are actively working with our suppliers to mitigate potential issues moving forward," GM said Friday. The automaker said this is its first semiconductor-related full-size truck production downtime since August. GM noted that overall it has "seen better consistency in semiconductor supply through the first quarter compared to last year as a whole. This has translated into improvement in our production and deliveries during the first three months of the year." GM Chief Executive Officer Mary Barra met with some lawmakers on Capitol Hill this week, including Republican Senator Todd Young of Indiana. GM is backing a bill in Congress to provide $52 billion in government subsidies to boost U.S. semiconductor manufacturing. GM said that legislation could help "alleviate the ongoing shortage that continues to impact U.S. automotive manufacturing." (Reporting by David Shepardson; editing by Jonathan Oatis) Related video:
GM extends vehicle production cuts into mid-March due to global chip shortage
Tue, Feb 9 2021DETROIT — General Motors said on Tuesday it was extending production cuts at three North American plants until at least mid-March due to the global semiconductor chip shortage, while vehicles at two other factories would only be partially built. GM, whose shares dipped 1% after the announcement, did not disclose the impact volumes or say which supplier and vehicle parts were affected by the chip shortage. But it said it would focus on keeping production running at plants building its highest-profit vehicles, full-size pickup trucks and SUVs. GM said it intended to make up as much lost production as possible once the shortage chip eased. "Semiconductor supply remains an issue that is facing the entire industry. GM's plan is to leverage every available semiconductor to build and ship our most popular and in-demand products," GM spokesman David Barnas said. GM said it was extending downtime at its U.S. plant in Fairfax, Kansas, its Canadian factory in Ingersoll, Ontario, and its Mexican facility in San Luis Petosi until mid-March when it would reassess the situation, he said. In addition, GM would build but leave incomplete for final assembly vehicles at Wentzville, Missouri, and its Mexican plant at Ramos Arizpe. GM vehicles affected by the idled plants include the Chevrolet Malibu sedan, Cadillac XT4 SUV, Chevy Equinox, and GMC Terrain SUVs. Vehicles to be left incomplete for now included the Chevy Colorado, GMC Canyon pickups and Chevy Blazer SUV. This week, GM had said it was idling the three factories where it has now extended downtime and said it would halve production at a plant in South Korea. The chip shortage has affected many automakers, including Toyota, Volkswagen, Stellantis, Ford, Renault, Subaru, Nissan, Honda and Mazda. Asian chipmakers are rushing to boost production but say the supply gap will take many months to plug. German chipmaker Infineon said the shortage would get worse in the near term. The chip shortage is expected to cut global output in the first quarter by more than 670,000 vehicles and last into the third quarter, IHS Markit said. AutoForecast Solutions estimated total lost production this year could reach 1 million vehicles. Honda and Nissan said on Tuesday they would sell 250,000 fewer cars in total this financial year due.




















