Find or Sell Used Cars, Trucks, and SUVs in USA

2001 Gmc Sierra Hd 4wd Sle on 2040-cars

Year:2001 Mileage:77798 Color: White /
 Gray
Location:

La Salle, Colorado, United States

La Salle, Colorado, United States
Advertising:
Transmission:Automatic
Body Type:Pickup Truck
Vehicle Title:Clear
Engine:8.1L V8 MPI
Fuel Type:Gasoline
For Sale By:Private Seller
VIN: 1GTHK24G31E254113 Year: 2001
Make: GMC
Model: Sierra 2500
Cab Type (For Trucks Only): Regular Cab
Trim: SL Standard Cab Pickup 2-Door
Options: 4-Wheel Drive, CD Player
Drive Type: 4WD
Safety Features: Driver Airbag, Passenger Airbag
Mileage: 77,798
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Sub Model: SL/SLE
Exterior Color: White
Interior Color: Gray
Warranty: Vehicle does NOT have an existing warranty
Number of Cylinders: 8
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

 Very nice 2001 GMC Sierra 2500.  8.2 V8.  This truck has amazing towing power.  Very clean engine, trany, and clean interior with no damage.  Exterior paint in good condition with the exception of a scratch on over the gas door.  Has sprayed on duraliner.   This truck drives very well.  Good all terrain tires.  Brand new battery.

Auto Services in Colorado

Windsor Car Care ★★★★★

Auto Repair & Service, Car Wash, Auto Oil & Lube
Address: 9640 E Alameda Ave, Aurora
Phone: (303) 343-8200

West Side Auto Body & Towing ★★★★★

Automobile Body Repairing & Painting, Automobile Body Shop Equipment & Supply-Wholesale & Manufacturers, Towing
Address: 9719 W Coal Mine Ave Suite P, Lowry
Phone: (720) 255-0343

Toyexus Service ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 700 S Broadway, Lone-Tree
Phone: (303) 722-0234

Tito`s Cash for Cars ★★★★★

Automobile Parts & Supplies, Automobile Salvage, Towing
Address: Foxton
Phone: (303) 250-5079

Suzuki-Mccloskey ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 6710 N Academy Blvd, Green-Mountain-Falls
Phone: (719) 685-7030

Red Rock Auto Clinic ★★★★★

Auto Repair & Service, Brake Repair
Address: 1840 W Uintah St, Colo-Spgs
Phone: (719) 471-3311

Auto blog

GM delaying additional Silverado EV and Sierra EV production to Q4 2025

Tue, Oct 17 2023

This looks like more "Gotcha!" news about storms in the EV sector, but the word "additional" is key here. The Detroit News reported today that GM is pushing delaying production of the Chevrolet Silverado EV and GMC Sierra EV pickups at the Orion Assembly Plant to late 2025, about a year behind expectations. The Silverado EV Work Truck is already in production at GM's Factory Zero in Detroit, which won't change. Retail versions of the Silverado EV are still planned for production at Factory Zero before the end of this year, and the Sierra EV is expected to enter production at Factory Zero early next year. This new plan simply means GM won't add more production of those electric trucks at Orion.  GM builds the Chevrolet Bolt at Orion right now, assembly of that groundbreaking car to end this year. GM's original idea was to spend $4 billion to convert Orion to EV pickup production in time to get its two giant profit makers rolling down lines in early 2025. The move to late 2025 could mean the plant is out of commission for about two years. The facility's 1,261 employees are being offered spots in other plants, including Factory Zero.  The automaker gave several reasons for the move, a spokesperson telling The Detroit News the company wants "to better manage capital investment while aligning with evolving EV demand," and telling the Detroit Free Press, "We're looking at EV demand and the trendline for EVs is stabilizing. ... It is not rising as fast as originally forecasted." On top of that, engineers "have identified engineering improvements that we will implement to increase the profitability of our products." The spokesperson also made it clear that the delay has nothing to do with the UAW strike, now in its 32nd day.  Factory Zero's working up to a near-term production capacity of about 600,000 units annually, GM saying it wanted to get capacity to 1 million EVs annually by the end of 2025. At the moment, the site builds the Silverado EV Work Truck, the GMC Hummer EV pickup and SUV, and the Cruise Origin shuttles — not the Bolt taxis, the autonomous pods. The Detroit News reported GM sold 18 Silverado EV Work Trucks in Q3 this year, GM Authority says GMC Hummer EV production has ramped up to about 3,000 units per month, and Cruise Origin is still waiting on approval from the National Highway Safety Traffic Administration to mass-produce the autonomous shuttles because the shuttles need an exemption for not having steering wheels.

AEV-upgraded GMC Canyon AT4X, Chevy Colorado ZR2 appear in spy photos

Mon, Dec 12 2022

As with the previous generation, it appears the 2023 Chevy Colorado ZR2 will be getting a special AEV version. Not only that, but its twin, the GMC Canyon AT4X will get one, too. And as these spy photos show, they'll have some additional off-road accessories included, as well as bigger tires. We'll start with the GMC Canyon. The first example of the truck without any camouflage is not quite fully upgraded like the camouflage vehicles. But it has one part not seen on the others: the AEV snorkel. 2023 Chevy Colorado ZR2 AEV Bison prototype View 13 Photos The two appear to be riding on larger Goodyear Wrangler Terrain MT tires. These look like 35-inch examples -- 2 inches larger than the biggest tires available on the ZR2 and AT4X. They're also mounted on beadlock capable wheels. Besides the bigger tires, both trucks also feature a new bed-mounted spare tire. It's a full-size spare, and unlike past bed-mounts, this one places the tire flush against the cab. The benefit of moving the spare to the bed is departure angle. And while this position looks a little less like how trophy trucks carry their spares, it should provide better cargo space. Rear visibility probably isn't great, though. Generalizing based on what we know about the current ZR2 Bison, the new AEV trucks will probably get unique grilles, steel bumpers, fender flares, a suspension lift and possibly even axle ratio changes. Additional options such as a winch could be offered, too. We expect the trucks will be revealed within the next year, since the base trucks have already been shown, and these are just upgraded versions of those trucks. Related Video: 2023 Chevrolet Colorado walkaround

GM announces $7 billion Michigan factory investment, most going to EVs

Tue, Jan 25 2022

GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling.  GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra.  GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra.  The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee.  Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.