Find or Sell Used Cars, Trucks, and SUVs in USA

Excellent Condition on 2040-cars

Year:1964 Mileage:36000
Location:

Bridgeport, Connecticut, United States

Bridgeport, Connecticut, United States
Advertising:

 This  vehicle was purchased from a private owner 4 years ago and it was the second owner, car was last registered in 1975 in Fond Dulac Wisconsin   I have restoring this car since

I bought it 4 years ago. Engine and transmission was removed and the car was sand blasted under carriage and engine compartment. All rust removed and repair. Engine was clean and

put back since it has only 36000 original miles on it. Here is a list of some of the new parts that were install in this car. New front disk brakes new muffler system new springs front suspension emergency cable with all the fittings and pulley. All new brake lines and masty moreer cylinder, new front suspension new shock absorbers, new 17 inch rims with new tires

whole inside interior new rug, seat cover dash pad  instrument panel with new  chrome face radio and speakers. New convertible top lights and lenses front and rear bumpers and many more new parts.




















Auto Services in Connecticut

Tasca Chrysler Dodge Jeep RAM ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 9 Post Rd, Glasgo
Phone: (401) 596-2077

Superior Transmission ★★★★★

Auto Repair & Service, Used Car Dealers, Automobile Parts & Supplies
Address: 1201 Wolcott St, Bethlehem
Phone: (203) 574-2308

Secor Volvo ★★★★★

New Car Dealers, Used Car Dealers
Address: BROAD Street, New-London
Phone: (860) 442-3232

Precision Auto Body & Garage ★★★★★

Automobile Body Repairing & Painting, Towing
Address: 2187 Route 55, Kent
Phone: (845) 724-3330

Pine Bush Equipment Co Inc ★★★★★

Automobile Parts & Supplies, Automobile Accessories, Battery Supplies
Address: 24 Sybil Ct, Gaylordsville
Phone: (845) 878-4004

Middletown Plate Glass Co Inc ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Glass-Auto, Plate, Window, Etc
Address: 40 Union St, Middle-Haddam
Phone: (860) 347-2581

Auto blog

Next Ford F-150 delayed for aluminum body panel issues?

Wed, 11 Dec 2013

The timetable for next-generation Ford F-150 may be in trouble if a report from The Truth About Cars is true. The next F-150 is slated to make extensive use of weight-saving aluminum in its body, but the aluminum alloy provided by suppliers hasn't met Ford's requirements in the earliest phases of pre-production, according to the report.
The F-150 represents a huge portion of Ford's profits and is the best-selling truck in the US, even in the face of increased pressure from cross-town rivals General Motors and Ram. While the current truck is treading water against its competition, we'd be lying if we said the F-150 weren't growing quite long in the tooth.
If production of the next-generation of the Ford cash cow, said to be based on the Atlas Concept from the 2013 Detroit Auto Show (pictured above), is delayed, it could be bad for Ford. Production at Ford's Dearborn Truck Plant is already set to be delayed six to ten weeks, missing an internal on-sale deadline of Memorial Day.

Stock Miata beats bunch of high-powered cars in wet 1/4-mile drag race

Thu, 06 Jun 2013

When is a stock, 167-horsepower Mazda MX-5 Miata quicker than a Chevrolet Corvette, Ford Mustang, Lamborghini Gallardo, Lotus Elise and a Porsche 911? When it's raining. Sort of.
Mazda Canada arranged a unique drag race to show off the fact that the Miata's optional power retractable folding hardtop can go from top-down to top-up in just 12 seconds flat. In this video, all six cars line up for a drag race, and it starts to rain (well, sort of - but you'll have to watch the video all the way to the end to see what we mean). The green flag is waved, and the timer starts as soon as the convertibles begin to put their tops up. But because the Miata's roof mechanism gets the car's roof back up a full 5.1 seconds quicker than the second-place car, the Mazda gets a serious advantage off the line for the actual drag race.
It's a fun video. And while we've spoiled the results (come on, the video was uploaded by Mazda, you knew the Miata was going to win), be sure to see how it all unfolds, below.

Huge, pricey trucks haul jobs and profits for the Detroit Three

Tue, Feb 5 2019

DECATUR, Texas — Mickey McMaster is on his 12th pickup truck. The 61-year old farm equipment dealer in Decatur, Texas, two weeks ago treated himself to a 2019 GMC Denali for around $69,000 — a reward for long hours at work. "For me this is the Cadillac of trucks, it's a real luxury vehicle," McMaster said. "I've worked my way up to afford a truck like this and it shows that I've earned it." McMaster is the kind of customer General Motors Co is banking on as it plans to add 1,000 jobs at a plant in Flint, Michigan that will build a new generation of its largest pickups. Demand from Texas and other heartland states for big pick-ups is providing a lifeline to many workers the No. 1 U.S. automaker is laying off at plants elsewhere. The Detroit Three automakers and thousands of their U.S. workers are counting on customers like McMaster to keep buying bigger and more luxurious pickup trucks even if overall U.S. vehicle demand weakens this year, as most analysts predict. At Flint, GM will build a new generation of its heavy-duty Chevrolet Silverado and GMC Sierras, including luxury models that are some of the most profitable vehicles on the planet. GM, Ford Motor Co and Fiat Chrysler Automobiles NV's Ram division own the segment and are each doubling down with new or redesigned models launching this year. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday celebrated the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. At the same time that GM is laying off thousands of U.S. workers and planning to shutter five North American factories, Flint is hiring. The plant runs on three daily shifts, six days a week. As the new model's assembly system ramps up, the plant's capacity will increase by more than 25 percent, plant manager Mike Perez told Reuters. The Flint plant plans to add 1,000 workers, more than half of the 1,500 factory workers who have asked to transfer from plants GM has targeted for shutdown as part of CEO Mary Barra's restructuring plan. "We're bringing in 50 to 100 people every week," said Perez. Workers last week were still finishing the job of retooling the Flint factory to build the new heavy-duty trucks as part of a $1.5 billion investment project.