2009 Ford E-150 Xlt Van Pool 9-pass Running Boards 62k Texas Direct Auto on 2040-cars
Stafford, Texas, United States
Engine:See Description
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
Body Type:Wagon
Year: 2009
Warranty: Vehicle has an existing warranty
Make: Ford
Model: E-Series Van
Options: CD Player
Power Options: Power Windows, Power Locks, Cruise Control
Mileage: 62,012
Sub Model: WE FINANCE!!
Exterior Color: White
Number Of Doors: 0
Interior Color: Gray
CALL NOW: 281-410-6115
Number of Cylinders: 8
Inspection: Vehicle has been inspected
Seller Rating: 5 STAR *****
Ford E-Series Van for Sale
2012 ford e-350 xlt extended 5.4l v8 15-passenger 38k texas direct auto(US $19,980.00)
2010 ford e-350 extended cargo van 5.4l v8 cd audio 49k texas direct auto(US $15,780.00)
2006 ford e-350 econoline super duty service utility van 5.4l v-8 bidadoo
Very nice ford 12 passenger van, with running boards & rear park aid..unit 8517t
2012 ford e150 handicapped raised roof wheelchair van-low miles!
2009 ford e-350 xlt 15-pass van pool park assist 67k!! texas direct auto(US $16,980.00)
Auto Services in Texas
Z Rated Automotive Sales & Service ★★★★★
Xtreme Tinting & Alarms ★★★★★
Wayne`s World of Cars ★★★★★
Vaughan`s Auto Glass ★★★★★
Vandergriff Honda ★★★★★
Trade Lane Motors ★★★★★
Auto blog
Ford wins second consecutive International Van of the Year award with Transit Connect
Wed, 18 Sep 2013The redesigned 2014 Ford Transit Connect isn't even on sale yet, but it's already making its presence felt around the world. At a commercial vehicle expo in Russia, the Transit Connect was named the International Van of the Year.
Ford's small work van edged out the new Mercedes-Benz Sprinter by just seven points to allow Ford to grab this honor for the second consecutive year, which it won last year with the Transit Custom. Not only does this make Ford the first to ever win the award in back-to-back years, but it's also the fifth time the automaker has won this award since 2003 (two with the Transit Connect, two with the fullsize Transit and once with the Transit Custom). Ford congratulates itself for the accomplishment in a press release posted below.
With contract expiration days away, UAW targets GM first for negotiations
Tue, Sep 3 2019The United Auto Workers union on Tuesday said that it would target General Motors as the first of the Detroit automakers for talks ahead of the current four-year contract's expiration on Sept. 14. This year's contract talks between the union and GM, Ford and Fiat Chrysler Automobiles NV are expected to be contentious as U.S. new vehicle sales are slowing and automakers face rising costs associated with the development of electric vehicles and self-driving cars. Rising healthcare costs, job security, profit sharing and the use of temporary workers are expected to be major sticking points. GM in particular has been a target of union ire since announcing the closure of five North American plants late last year. That move drew a wave of criticism, including from U.S. President Donald Trump. Trump has repeatedly prodded GM and last week said the No. 1 U.S. automaker should begin moving its operations in China back to the United States. "We are prepared and we are all ready to stand up for our members, our communities and our manufacturing future," UAW President Gary Jones said in a statement. In a statement, GM said, "We look forward to having constructive discussions with the UAW on reaching an agreement that builds a strong future for our employees and our business." The contracts come at a difficult time for the UAW, as a federal corruption investigation into the union continues to grow. Last week, the FBI conducted searches at Jones' home, a union retreat and multiple other locations, including the home of the union's previous president, Dennis Williams. To date, seven people linked to the union and the automaker have been sentenced in the government's corruption investigation. Reporting by Nick Carey.
Ford halves summer shutdown, ramps SUV production
Tue, Jun 2 2015For the third consecutive year, Ford is reducing the length of its summer shutdown for several factories to keep up with high demand for some models. This year, the decision means 40,000 more units of popular trucks and crossovers like the F-Series, Edge, Escape, and Explorer. Rather than the normal two-week break, workers at the Chicago, Dearborn Truck, Kansas City, Kentucky Truck, Louisville, and Oakville factories will only get a week off starting on June 29. Additionally, 10 plants for producing components to support these assembly lines will also have the shorter vacation. The rest of the Blue Oval's manufacturing locations will shutdown from June 29 to July 10 for maintenance and retooling. According to Ford, the decision comes because of low inventories and high demand on some of its popular models. The 2015 F-150 is lasting around 20 days at dealers, and the Edge spends an average of 10 days before being sold. Ford is hardly alone in deciding to keep locations open during the normal summer break, though. FCA recently made the decision not to shutdown four assembly plants and all of its factories for components to keep up with demand for models like the Jeep Cherokee, Grand Cherokee, and Dodge Durango. Related Video: FORD REDUCES SUMMER SHUTDOWN TO MEET DEMAND FOR FORD F-SERIES TRUCKS, EDGE, ESCAPE AND EXPLORER JUN 2, 2015 | DEARBORN, MICH. In response to increased customer demand, Ford will add capacity this summer to produce its most popular trucks and utilities Ford will shorten its summer shutdown from the traditional two-week summer shutdown to one week for a majority of North American assembly plants, increasing production by close to 40,000 units In April, Ford F-150 was turning at just 20 days on dealer lots, Edge sales were up 78 percent, and Escape and Explorer remained in tight supply. 2016 Explorers are now hitting dealer lots In response to customer demand for Ford's newest products, the company this year will produce close to 40,000 extra units by idling select plants for only one week during what has been the traditional two-week summer shutdown.. "To meet surging customer demand for our top-selling trucks and utilities, we are continuing to run our North American facilities during the traditional two-week summer shutdown in order to add close to 40,000 units," said Bruce Hettle, Ford vice president, North America Manufacturing.
2040Cars.com © 2012-2025. All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.
Use of this Web site constitutes acceptance of the 2040Cars User Agreement and Privacy Policy.
0.051 s, 7929 u
