Find or Sell Used Cars, Trucks, and SUVs in USA

1989 Ford Bronco Custom Sport Utility 2-door 5.0l on 2040-cars

US $5,000.00
Year:1989 Mileage:36862
Location:

Fort Worth, Texas, United States

Fort Worth, Texas, United States
Advertising:

 1989 Ford Bronco in great condition with low mileage.

Auto Services in Texas

Woodway Car Center ★★★★★

Used Car Dealers, Used Truck Dealers
Address: 9900 Woodway Dr, Oglesby
Phone: (254) 751-1444

Woods Paint & Body ★★★★★

Automobile Body Repairing & Painting
Address: 120 Prince Ln, Royse-City
Phone: (972) 771-1778

Wilson Paint & Body Shop ★★★★★

Automobile Body Repairing & Painting, Truck Body Repair & Painting, Truck Painting & Lettering
Address: 125 N Waco St, Hillsboro
Phone: (254) 582-2212

WHITAKERS Auto Body & Paint ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Truck Body Repair & Painting
Address: 2019 S Lamar Blvd, Volente

Westerly Tire & Automotive Inc ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 8101 Camp Bowie West Blvd, Richland-Hills
Phone: (817) 244-5333

VIP Engine Installation ★★★★★

Auto Repair & Service
Address: 8252 Scyene Rd, Combine
Phone: (214) 377-7295

Auto blog

Detroit Three autoworkers could get huge bonuses

Mon, 06 Jan 2014

For a long time, being a line worker for one of the Detroit Three has meant living with an uncertain future. With the health of American automakers on the rise, though, things are also starting to look up for the men and women building the cars. The latest sign that things aren't bad? Big profit-sharing checks.
According to The Detroit News, Ford, General Motors and Chrysler could end up paying over $800 million to 130,000 workers as part of a profit-sharing plan. According to The News, the economic impact of these profits in Michigan alone could exceed $400 million, besting the NFL's Super Bowl, MLB's All-Star Game and the NHL's Winter Classic for their economic impact.
This is the third straight year the Detroit Three have issued profit-sharing checks to UAW employees, and for many workers, the checks are as close as they'll get to a raise, due to the most recent contract between the union and the manufacturers. On average, employees at GM and Ford receive $1 for every $1 million in North American (not just the US) pre-tax profits. Chrysler, meanwhile, gets a similar deal, although the Auburn Hills-based company calculates profit sharing using 85 percent of the brand's global profits.

Ford gives S-Max the Vignale treatment in Milan

Wed, 09 Apr 2014

Ford has a bit of a history in reviving the names of old coachbuilders it has long since gobbled up and using them to distinguish its top-of-the-line models in Europe. That's what it did for years with Ghia, and after having replaced it several years ago with the Titanium trim level, now it's doing it again with Vignale.
At the Frankfurt Motor Show last year, Ford revealed the Mondeo Vignale concept in both sedan and wagon body-styles, which are set to reach production next year. But before they do, the Blue Oval automaker is at it again, applying similar upgrades to the S-Max minivan and unveiling it in concept form in Milan this week.
Setting the Vignale concept apart from any other S-Max is its Milano Grigio rose-hued silver pearlescent paint, 21-inch alloys, chrome trim and hexagonal-pattern grille. Inside it's all ultra-soft quilted leather and aluminum trim, with tablet docking stations in the back and thinner, more flexible seats than the existing production version.

Ford F-150 production hampered by frame shortage

Sat, May 30 2015

If anyone has questions about how Ford's new aluminum-bodied F-150 will hold up, it's not buyers. Orders are so strong for the fullsize pickup that competitors General Motors and Ram are discounting their offerings to hold onto market share. It's a shame for the Blue Oval then, that it can't build all the trucks it needs because frame supplier Metalsa isn't delivering enough frames. Neither Ford nor Metalsa has said what the problem is, but Ford employees are at Metalsa's Kentucky plant trying to get it sorted out, Automotive News reports. Overtime shifts at the Dearborn Truck Plant and the Kansas City Assembly Plant have been canceled due to the shortage that's been a problem for at least two months now. The issue is exacerbated by this being the changeover period in production from the old model to the new, which comes with its own issues. That would help explain why even though Dearborn production finished ramping up in January, output in April was down 9.2 percent compared to last year, according to AN. Transaction prices are up for the new truck, but overall F-150 production in Q1 was down 40 percent, and missing product means missing profits. Combined with the production drop for the new Ford Edge, the company's Q1 bottom line was robbed of $1 billion. It isn't clear when the frame issue will be solved, but workers at the plants are ready to run "all-out" when it is. Related Video: News Source: Automotive News - sub. req.Image Credit: Copyright 2015 Drew Phillips / AOL Plants/Manufacturing Ford Truck kansas city assembly plant