2020 Dodge Durango Pursuit Awd 5.7l V8 Hemi Red/white Visor Lights Wi on 2040-cars
Engine:5.7L V8 OHV 16V
Fuel Type:Gasoline
Body Type:SPORT UTILITY 4-DR
Transmission:Automatic
For Sale By:Dealer
VIN (Vehicle Identification Number): 1C4SDJFT9LC318979
Mileage: 91141
Make: Dodge
Trim: Pursuit AWD 5.7L V8 HEMI Red/White Visor Lights wi
Features: --
Power Options: --
Exterior Color: Black
Interior Color: Black
Warranty: Unspecified
Model: Durango
Dodge Durango for Sale
2024 dodge durango citadel(US $53,988.00)
2022 dodge durango orange sport rwd(US $38,277.00)
2020 dodge durango gt plus rwd(US $21,650.00)
2023 dodge durango r/t(US $56,530.00)
2023 dodge durango r/t plus awd(US $41,790.00)
2023 dodge durango gt premium awd(US $37,277.00)
Auto blog
25,000 Jeep Grand Cherokee, Dodge Durango SUVs recalled over brake feel
Mon, 10 Mar 2014Chrysler has announced that it is recalling over 25,000 Jeep Grand Cherokee and Dodge Durango SUVs from several markets over concerns about brake feel under hard braking. The affected models are from the 2012 and 2013 model years, although the actual dates of production aren't available. 18,700 are in the US, while 825 are in Canada, 530 are in Mexico and a further 5,200 outside of North America.
According to a statement, Chrysler was informed of the issue by a component supplier for the Ready Alert Braking system, which primes the brakes in anticipation of an emergency stop. A component in the system was restricting the flow of brake fluid too much.
As Chrysler is quick to point out, the way the brakes functioned was in compliance with regulations and there are no reported cases of drivers losing braking power. Instead, the issue rests with what Chrysler calls a pedal feel that "was not consistent with customer expectations." So it would seem Chrysler is being proactive and fixing a problem not because there's a legal issue at work, but simply because it doesn't feel the way the manufacturer wants it to. Well done.
Dodge to sell off first Challenger SRT Hellcat for charity
Sun, 27 Jul 2014
Want to get your hands on a new 2015 Dodge Challenger SRT Hellcat, and can't wait to be the first to get one? Las Vegas will be the place to be on September 27. That's where Barrett-Jackson will auction off the very first example. And you'd better bring your checkbook, because the bidding is sure to be fierce with all the proceeds going to charity.
The supercharged Challenger with VIN 0001 has been hand-painted in Stryker Red (usually reserved for the Viper) and features special badging, documentation and accompanying memorabilia - not to mention, of course, that 707-horsepower, 6.2-liter supercharged Hemi V8. The car will be on display this weekend as well at Barrett-Jackson's Hot August Nights auction in Reno.
Stellantis invests more than $100 million in California lithium project
Thu, Aug 17 2023Stellantis said it would invest more than $100 million in California's Controlled Thermal Resources, its latest bet on the direct lithium extraction (DLE) sector amid the global hunt for new sources of the electric vehicle battery metal. The investment by the Chrysler and Jeep parent announced on Thursday comes as the green energy transition and U.S. Inflation Reduction Act have fueled concerns that supplies of lithium and other materials may fall short of strong demand forecasts. DLE technologies vary, but each aims to mechanically filter lithium from salty brine deposits and thus avoid the need for open pit mines or large evaporation ponds, the two most common but environmentally challenging ways to extract the battery metal. Stellantis, which has said half of its fleet will be electric by 2030, also agreed to nearly triple the amount of lithium it will buy from Controlled Thermal, boosting a previous order to 65,000 metric tons annually for at least 10 years, starting in 2027. "This is a significant investment and goes a long way toward developing this key project," Controlled Thermal CEO Rod Colwell said in an interview. The company plans to spend more than $1 billion to separate lithium from superhot geothermal brines extracted from beneath California's Salton Sea after flashing steam off those brines to spin turbines that will produce electricity starting next year. That renewable power is expected to cut the amount of carbon emitted during lithium production. Rival Berkshire Hathaway has struggled to produce lithium from the same area given large concentrations of silica in the brine that can form glass when cooled, clogging pipes. Colwell said a $65 million facility recently installed by Controlled Thermal can remove that silica and other unwanted metals. DLE equipment licensed from Koch Industries would then remove the lithium. "We're very happy with the equipment," he said. "We're going to deliver. There's just no doubt about it." Stellantis CEO Carlos Tavares called the Controlled Thermal partnership "an important step in our care for our customers and our planet as we work to provide clean, safe and affordable mobility." Both companies declined to provide the specific investment amount. Controlled Thermal aims to obtain final permits by October and start construction of a commercial lithium plant soon thereafter, Colwell said. Goldman Sachs is leading the search for additional debt and equity financing, he added.