2015 Dodge Challenger Srt Hellcat on 2040-cars
Transmission:Manual
Fuel Type:Gasoline
For Sale By:Private Seller
Vehicle Title:Clean
Engine:6.2L Gas V8
VIN (Vehicle Identification Number): 2C3CDZC90FH854804
Mileage: 65000
Trim: SRT HELLCAT
Number of Cylinders: 8
Make: Dodge
Drive Type: RWD
Model: Challenger
Exterior Color: Red
Dodge Challenger for Sale
2015 dodge challenger(US $15,000.00)
2016 dodge challenger srt hellcat(US $47,999.00)
2021 dodge challenger srt hellcat 1000+ hp pro tuned(US $66,000.00)
2016 dodge challenger(US $52,000.00)
1971 dodge challenger(US $3,950.00)
2021 dodge challenger r/t scat pack(US $41,997.00)
Auto blog
2014 Dodge Durango priced from $29,795*
Wed, 14 Aug 2013With all the new updates the Dodge Durango is getting for 2014, one thing that Dodge isn't changing on its big SUV is the starting price. Just like the current model year, the 2014 Dodge Durango will be priced from $29,795 (*not including $995 for destination).
This price is for the base SXT model, but the 2014 Durango is also offered in a new Limited trim level (replacing the Crew) as well as the sporty R/T and the luxurious Citadel. The Durango Limited starts at $35,995 (an increase of $800 over the 2013 Crew), while the R/T now starts at $38,995 (up $2,500). The top-of-the-line Durango Citadel will start at $40,995 - an increase of $1,000.
The many improvements made to the 2014 Durango include revised exterior styling, added in-cabin tech and an eight-speed automatic transmission (expected to return better fuel economy). Dodge is saying that the V6 models will get 25 miles per gallon on the highway while V8 models are expected to score 23-mpg highway, but there are no official EPA numbers to report yet. Scroll down for the full press release.
Vin Diesel reveals first poster for Furious 8
Wed, Apr 20 2016Vin Diesel unveiled the first poster for Furious 8. The image shows Dom standing on a deserted road with his Dodge Charger with the tagline: "New roads ahead." Diesel's post doesn't offer any other new details about the much-anticipated action film, which is still a year away from theaters. While this image is teasing, we continue to get a better idea of Furious 8's cast. Scott Eastwood, Clint Eastwood's son, has a prominent role in the film, and Charlize Theron plays a villain. Dwayne Johnson also confirmed his return as Hobbs. Plot details still vague, though. An earlier teaser from Diesel hinted that some of the movie might take place in Manhattan, which could be an amazing setting for automotive stunts. The crew has also been filming north of Reykjavik, Iceland, which would be a great locale for off-road action. Furious 8 will hit theaters on April 14, 2017. According to Diesel, part 9 will arrive on April 19, 2019, and Fast & Furious 10 will potentially end the main franchise on April 2, 2021. This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings. Related Video:
FCA, Ford idle plants due to semiconductor shortage
Fri, Jan 8 2021DETROIT (Reuters) - Ford and FCA will become the latest automakers to idle production facilities due to a semiconductor shortage. Ford's Louisville Assembly Plant in Kentucky will idle for a week, borrowing a down period from later in the year to compensate. Per Automotive News, FCA is idling its Brampton facility in Ontario, Canada, and one other site which has not yet been identified. Louisville Assembly is the production site for the Ford Escape and Lincoln Corsair SUVs; Brampton Assembly produces the Chrysler 300, Dodge Charger and Dodge Challenger for FCA. A Ford spokeswoman, who declined to identify the semiconductor supplier, confirmed the temporary shutdown to Reuters. In this, FCA and Ford join Nissan and potentially Honda in idling production in the wake of the shortage, which also hit Volkswagen late last year. The shortages are being blamed on consumer demand for silicon after production slowdowns resulting from the coronavirus pandemic. Volkswagen said it had to adjust production schedules in China, Europe and North America to compensate. Nissan said it planned to reduce production of the Note, a hybrid electric car, at its Oppama Plant in Kanagawa prefecture, Japan, but did not give details of the scale of the output cut. The Nikkei newspaper reported that Nissan would slash its Note production at Oppama to about 5,000 units in January, from an initially planned 15,000 units. "A global shortage of semiconductors has affected parts procurement in the auto sector. As a result of this shortage, the Oppama Plant in Japan will adjust production in January, reducing production of the Nissan NOTE," Nissan said in a statement. (This article contains reporting from Reuters.) Auto News Plants/Manufacturing UAW/Unions Chrysler Dodge Ford







