2003 Dodge Stratus Sxt Sedan 4-door 2.4l on 2040-cars
Durant, Oklahoma, United States
Vehicle Title:Rebuilt, Rebuildable & Reconstructed
Transmission:Automatic
Body Type:Sedan
Fuel Type:GAS
For Sale By:Private Seller
Mileage: 145,000
Make: Dodge
Exterior Color: Blue
Model: Stratus
Interior Color: Gray
Trim: SXT Sedan 4-Door
Warranty: Vehicle does NOT have an existing warranty
Drive Type: FWD
Options: CD Player
Number of Cylinders: 4
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows
Disability Equipped: No
Number of Doors: 4
Dodge Stratus for Sale
2006 dodge stratus sxt(US $4,450.00)
2002 dodge stratus se coupe 2-door 3.0l(US $3,800.00)
2002 dodge stratus se plus sedan 4-door 2.4l
2003 dodge stratus 4c sedan sxt stk#224145, no reserve
2005 dodge stratus sxt sedan 4-door 2.4l(US $4,000.00)
2003 dodge stratus se coupe 2-door 2.4l(US $6,500.00)
Auto Services in Oklahoma
Turbo Technologies ★★★★★
Tanner Chevrolet ★★★★★
Super Clean Detail Shop ★★★★★
Street Image Wheels ★★★★★
Steve`s Auto Repair ★★★★★
Skyyline Dent & Hail Repair ★★★★★
Auto blog
2015 Ford Mustang vs. Camaro and Challenger [w/poll]
Thu, 17 Jul 2014The horsepower wars are tightening among the Detroit Three, as the Ford Mustang, Chevrolet Camaro and Dodge Challenger are getting bigger, more powerful, and yes, more fuel efficient.
That came into sharper focus this week as more information was revealed about the most insane Challenger ever - the 707-horsepower Hellcat - followed quickly by Ford's in-depth showcase of the 2015 Mustang in Dearborn.
It's shaping up to be a golden age for enthusiasts, and what's under the hood is becoming more important than ever.
Viper fans are at the Nurburgring to reclaim production-car speed record
Fri, Jul 21 2017With the outgoing generation of the Viper, Dodge missed a fabulous opportunity to set another Nurburgring lap record. The company did it, twice, with the previous-generation Viper ACR, but never went back with the latest ACR, and it definitely won't now that the car is being discontinued. This is why a group of Viper fans began fundraising back in January to take ACRs to the 'Ring for one more shot at glory. And, right now, that group is in Germany preparing for the attempt. The team made it thanks to support from GoFundMe donors, and sponsorship from Kumho Tires and Prefix, a design and prototype company based in Michigan. They're using two Viper ACR GTS-R commemorative-edition cars, which are appropriate for competing track cars since they have the same white-with-blue-stripes color scheme as Dodge's old Viper GTS-R racecars. The cars are supplied from ViperExchange and BJ Motors and equipped with Kumho Ecsta V720 tires. According to the group's Facebook page, the team has been practicing since Wednesday, July 19. A video posted today highlighted that the only mechanical issue so far has been an overheating problem that was solved with a new thermostat. Each car is running a different suspension setup for practice - one soft, the other hard - and they'll adjust them as needed. The plan is that both cars will use the same setup on the record attempt. To claim the record without any argument will require beating the 6:45.9 time set by the Nio EP9 electric car. Right behind it is the Radical SR8LM, which is technically street-legal, but not really a street car. It set a time of 6:48. As for true street cars with gasoline engines, the target the Viper team will really want to beat is the Lamborghini Huracan Performante, which pulled off a time of 6:52. You can track the team's progress at its Facebook page. Related Video: Image Credit: Dodge Auto News Motorsports Dodge Coupe Performance Supercars dodge viper acr nio ep9
Stellantis invests more than $100 million in California lithium project
Thu, Aug 17 2023Stellantis said it would invest more than $100 million in California's Controlled Thermal Resources, its latest bet on the direct lithium extraction (DLE) sector amid the global hunt for new sources of the electric vehicle battery metal. The investment by the Chrysler and Jeep parent announced on Thursday comes as the green energy transition and U.S. Inflation Reduction Act have fueled concerns that supplies of lithium and other materials may fall short of strong demand forecasts. DLE technologies vary, but each aims to mechanically filter lithium from salty brine deposits and thus avoid the need for open pit mines or large evaporation ponds, the two most common but environmentally challenging ways to extract the battery metal. Stellantis, which has said half of its fleet will be electric by 2030, also agreed to nearly triple the amount of lithium it will buy from Controlled Thermal, boosting a previous order to 65,000 metric tons annually for at least 10 years, starting in 2027. "This is a significant investment and goes a long way toward developing this key project," Controlled Thermal CEO Rod Colwell said in an interview. The company plans to spend more than $1 billion to separate lithium from superhot geothermal brines extracted from beneath California's Salton Sea after flashing steam off those brines to spin turbines that will produce electricity starting next year. That renewable power is expected to cut the amount of carbon emitted during lithium production. Rival Berkshire Hathaway has struggled to produce lithium from the same area given large concentrations of silica in the brine that can form glass when cooled, clogging pipes. Colwell said a $65 million facility recently installed by Controlled Thermal can remove that silica and other unwanted metals. DLE equipment licensed from Koch Industries would then remove the lithium. "We're very happy with the equipment," he said. "We're going to deliver. There's just no doubt about it." Stellantis CEO Carlos Tavares called the Controlled Thermal partnership "an important step in our care for our customers and our planet as we work to provide clean, safe and affordable mobility." Both companies declined to provide the specific investment amount. Controlled Thermal aims to obtain final permits by October and start construction of a commercial lithium plant soon thereafter, Colwell said. Goldman Sachs is leading the search for additional debt and equity financing, he added.