2008 Dodge Sprinter 2500 Base Standard Cargo Van 3-door 3.0l Turbo-diesel on 2040-cars
Buford, Georgia, United States
|
STOP BENDING OVER to get
through the cargo space!
ONE OWNER, ONE DRIVER in mobile workshop environment. Well maintained, Very Clean Air Conditioned, 5 Speed Automatic
Transmission. $500.00 Deposit via Credit Card direct to seller and balance in Cash upon pick-up in Buford , Ga. |
Dodge Sprinter for Sale
Dodge sprinter 2500 144"wb diesel cargo cold a/c cruise autocheck no reserve
144" wheel base - 2500shc super high ceiling - turbo diesel - no reserve
2003 dodge/mercedes sprinter 10 passenger van
2005 dodge sprinter 3500(US $10,000.00)
2004 dodge sprinter high top extended 158
Dodge sprinter 2003 white 140 wb 2.7l(US $8,900.00)
Auto Services in Georgia
Wishen Motors ★★★★★
WILLIE & BATMAN AUTOMOBILE SERVICE ★★★★★
William Mizell Ford ★★★★★
W.T. Standard & Assoc. ★★★★★
Unlimited Motor Cars ★★★★★
Toyota Mall Of Georgia ★★★★★
Auto blog
Vin Diesel reveals first poster for Furious 8
Wed, Apr 20 2016Vin Diesel unveiled the first poster for Furious 8. The image shows Dom standing on a deserted road with his Dodge Charger with the tagline: "New roads ahead." Diesel's post doesn't offer any other new details about the much-anticipated action film, which is still a year away from theaters. While this image is teasing, we continue to get a better idea of Furious 8's cast. Scott Eastwood, Clint Eastwood's son, has a prominent role in the film, and Charlize Theron plays a villain. Dwayne Johnson also confirmed his return as Hobbs. Plot details still vague, though. An earlier teaser from Diesel hinted that some of the movie might take place in Manhattan, which could be an amazing setting for automotive stunts. The crew has also been filming north of Reykjavik, Iceland, which would be a great locale for off-road action. Furious 8 will hit theaters on April 14, 2017. According to Diesel, part 9 will arrive on April 19, 2019, and Fast & Furious 10 will potentially end the main franchise on April 2, 2021. This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings. Related Video:
NHTSA closes investigation on 4.7M FCA power modules, no recall
Thu, Jul 30 2015FCA US hasn't had the best time with recalls as of late. Not only did the company recently agree to greater safety oversight and paid $105 million to the government, that came just days after hacking fears prompted a 1.4-million model recall campaign. However, a recent decision to close an investigation by the National Highway Traffic Safety Administration means that the automaker doesn't have to worry about another major recall possibly affecting 4.7 million vehicles, according to the agency's report (as a PDF). Last September, the Center for Auto Safety petitioned NHTSA to investigate an alleged problem with the totally integrated power module (TIPM) on these FCA US models. The group claimed that a fault with the component could cause a variety of maladies, including stalls, not starting, catching fire, unintended acceleration, and airbag non-deployment. At the time, it also submitted 70 cases where this had reportedly happened. According to NHTSA, "no valid evidence was presented in support of claims related to airbag non-deployment, unintended acceleration, or fire resulting from TIPM faults and these claims were found to be wholly without merit based on review of the field data and design of the relevant systems and components." The agency did find signs of an issue with the fuel pump relay in some Jeep Grand Cherokees and Dodge Durangos, but FCA US issued recalls for the problem in September 2014 and February 2015. Without anything else to go on, the Feds don't think it's worth investigating this topic any more.
Stellantis invests more than $100 million in California lithium project
Thu, Aug 17 2023Stellantis said it would invest more than $100 million in California's Controlled Thermal Resources, its latest bet on the direct lithium extraction (DLE) sector amid the global hunt for new sources of the electric vehicle battery metal. The investment by the Chrysler and Jeep parent announced on Thursday comes as the green energy transition and U.S. Inflation Reduction Act have fueled concerns that supplies of lithium and other materials may fall short of strong demand forecasts. DLE technologies vary, but each aims to mechanically filter lithium from salty brine deposits and thus avoid the need for open pit mines or large evaporation ponds, the two most common but environmentally challenging ways to extract the battery metal. Stellantis, which has said half of its fleet will be electric by 2030, also agreed to nearly triple the amount of lithium it will buy from Controlled Thermal, boosting a previous order to 65,000 metric tons annually for at least 10 years, starting in 2027. "This is a significant investment and goes a long way toward developing this key project," Controlled Thermal CEO Rod Colwell said in an interview. The company plans to spend more than $1 billion to separate lithium from superhot geothermal brines extracted from beneath California's Salton Sea after flashing steam off those brines to spin turbines that will produce electricity starting next year. That renewable power is expected to cut the amount of carbon emitted during lithium production. Rival Berkshire Hathaway has struggled to produce lithium from the same area given large concentrations of silica in the brine that can form glass when cooled, clogging pipes. Colwell said a $65 million facility recently installed by Controlled Thermal can remove that silica and other unwanted metals. DLE equipment licensed from Koch Industries would then remove the lithium. "We're very happy with the equipment," he said. "We're going to deliver. There's just no doubt about it." Stellantis CEO Carlos Tavares called the Controlled Thermal partnership "an important step in our care for our customers and our planet as we work to provide clean, safe and affordable mobility." Both companies declined to provide the specific investment amount. Controlled Thermal aims to obtain final permits by October and start construction of a commercial lithium plant soon thereafter, Colwell said. Goldman Sachs is leading the search for additional debt and equity financing, he added.











