Find or Sell Used Cars, Trucks, and SUVs in USA

2002 Dodge Durango Slt Plus Sport Utility 4-door 4.7l on 2040-cars

US $3,000.00
Year:2002 Mileage:150700
Location:

Sicklerville, New Jersey, United States

Sicklerville, New Jersey, United States
Advertising:

 2002 DODGE DURANGO SLT 4 DOOR 4.7L 4WD THATS RUNS GOOD BUT I RESENDLY PURCHASED A BRAND NEW CAR AND NEED TO LET THIS ONE GO CAN NOT AFFORD TO PAY TWO CAR INSURANCE. HAVE REPLACED FRONT CV JOINTS,WHEEL BEARINGS, AND NEW FRONT TIRE ROD ENDS, FOUR NEW SHOCKS. THIS CAR DOES NEED NEW TIRES AND WHEEL AKIGMENT DONE. DURANGO HAS 3RD ROW AND GREY CLOTH SEAT IN GOOD CONDITION. THE BODY OF THE CAR IN EXCELLENT CONDITION, AC WORKSWELL OVER ALL THE TRUCK IS VERY DEPENDABLE. ALL THOW IT COMES WITH NO WARRANTY AND AS IS PURCHASE.

Auto Services in New Jersey

Xclusive Auto Leasing ★★★★★

New Car Dealers, Used Car Dealers, Wholesale Used Car Dealers
Address: 2445 Hylan Blvd, Avenel
Phone: (718) 517-2277

Willie`s Auto Body Works ★★★★★

Automobile Body Repairing & Painting
Address: 127 Old Belmont Ave, Deptford
Phone: (610) 664-5886

United Motor Service ★★★★★

Auto Repair & Service, Automobile Inspection Stations & Services, Emissions Inspection Stations
Address: 3802 22 St, Union-City
Phone: (718) 472-4262

Ultrarev Inc ★★★★★

Automobile Parts & Supplies
Address: 750 Central Ave, Howell
Phone: (732) 938-3999

Turnersville Transmission Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 4791 Route 42, Blackwood
Phone: (856) 728-5111

Troppoli Automotive Used Cars ★★★★★

Auto Repair & Service, Used Car Dealers
Address: 1300 State Route 33, Point-Pleasant-Beach
Phone: (732) 774-3344

Auto blog

FCA, Ford idle plants due to semiconductor shortage

Fri, Jan 8 2021

DETROIT (Reuters) - Ford and FCA will become the latest automakers to idle production facilities due to a semiconductor shortage. Ford's Louisville Assembly Plant in Kentucky will idle for a week, borrowing a down period from later in the year to compensate. Per Automotive News, FCA is idling its Brampton facility in Ontario, Canada, and one other site which has not yet been identified.  Louisville Assembly is the production site for the Ford Escape and Lincoln Corsair SUVs; Brampton Assembly produces the Chrysler 300, Dodge Charger and Dodge Challenger for FCA.  A Ford spokeswoman, who declined to identify the semiconductor supplier, confirmed the temporary shutdown to Reuters. In this, FCA and Ford join Nissan and potentially Honda in idling production in the wake of the shortage, which also hit Volkswagen late last year. The shortages are being blamed on consumer demand for silicon after production slowdowns resulting from the coronavirus pandemic. Volkswagen said it had to adjust production schedules in China, Europe and North America to compensate.  Nissan said it planned to reduce production of the Note, a hybrid electric car, at its Oppama Plant in Kanagawa prefecture, Japan, but did not give details of the scale of the output cut. The Nikkei newspaper reported that Nissan would slash its Note production at Oppama to about 5,000 units in January, from an initially planned 15,000 units. "A global shortage of semiconductors has affected parts procurement in the auto sector. As a result of this shortage, the Oppama Plant in Japan will adjust production in January, reducing production of the Nissan NOTE," Nissan said in a statement. (This article contains reporting from Reuters.)     Auto News Plants/Manufacturing UAW/Unions Chrysler Dodge Ford

2015 Dodge Challenger configurator has all the Hellcat you can dream of

Mon, 08 Sep 2014

The 2015 Dodge Challenger SRT Hellcat has sucked up a lot of air in the automotive news world this summer, so it's good to know that you can actually go out and, you know, buy the sucker. With 2015 models headed for your local showroom, Dodge has seen fit to also pull the wraps off it's latest Challenger configurator, complete with the supercharged Hemi V8 option that we just can't seem to get enough of.
We're still enamored of the $58,995 starting price for the 707-horsepower SRT, but the online tool finally gives us a chance to see just how optioned up our dream super-muscle coupe can get.
Buyers can choose from three interior treatments and nine paint colors, with two hues (Ivory White and Phantom Black tri-coats) coming for a $500 premium. For $1,795 Laguna Leather SRT bucket seats can be added in place of the (very nice) stock chairs, and a fancier infotaiment system with navigation and HD radio runs $695.

UAW workers strike at Stellantis casting plant in Indiana

Sat, Sep 10 2022

DETROIT — United Auto Workers union members went on strike Saturday at the Stellantis casting plant in Indiana, citing health and safety issues including the company's alleged refusal to repair and replace the plantÂ’s air conditioning and heating systems. The 35-acre plant in Kokomo makes parts used in the powertrains of Chrysler, Dodge, Jeep and RAM vehicles and a long-term strike could affect vehicle assembly lines across North America. Stellantis says production had not been scheduled for this weekend and it hoped to resume negotiations as soon as possible on a contract with striking UAW Local 1166. In a statement, Stellantis said it was committed “to providing a safe and healthy work environment for all employees. After bargaining in good faith for two days and presenting an offer we believed addressed the unionÂ’s concerns, we are disappointed by the UAWÂ’s decision to walk out.” The 1,200-worker plant, Kokomo Casting, is the world's largest die cast facility, according to Stellantis. It makes aluminum parts for components including transmissions and engine blocks. The UAW local complained in a statement that Stellantis “claims it has no money to meet its membership's basic needs while ”making record profits and investing billions in a new battery plant across the street." UAW local president David Willis did not immediately return a phone call seeking comment. A person who answered the phone at union offices said he was preparing for a resumption in negotiations. The casting plant is to be retooled to produce engine blocks for hybrid-electric vehicles. In May, Stellantis announced a $2.5 billion joint venture with Samsung to build an electric vehicle battery factory in Kokomo that is to employ 1,400 workers. Stellantis, formed last year with the merger of Fiat Chrysler and FranceÂ’s PSA Peugeot, had said it would build two electric vehicle battery factories in North America. The other is slated for Windsor, Ontario. Plants/Manufacturing UAW/Unions Chrysler Dodge Jeep RAM