Find or Sell Used Cars, Trucks, and SUVs in USA

1999 Dodge Durango Slt Plus Sport Utility 4-door 5.9l on 2040-cars

US $5,000.00
Year:1999 Mileage:77000 Color: Burgundy /
 Tan
Location:

Pahrump, Nevada, United States

Pahrump, Nevada, United States
Advertising:
Engine:5.9L 360Cu. In. V8 GAS OHV Naturally Aspirated
Vehicle Title:Clear
Transmission:Automatic
Body Type:Sport Utility
For Sale By:Private Seller
Fuel Type:GAS
VIN: 1B4HS28ZXXF646565 Year: 1999
Mileage: 77,000
Make: Dodge
Exterior Color: Burgundy
Model: Durango
Interior Color: Tan
Trim: SLT Plus Sport Utility 4-Door
Warranty: Vehicle does NOT have an existing warranty
Drive Type: 4WD
Options: Cassette Player, 4-Wheel Drive, Leather Seats, CD Player
Number of Cylinders: 8
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Condition: UsedA vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections.Seller Notes:"In great shape needs handle for clove box"

 Nice vehicle low miles good condition I love this Durango but can not afford two cars anymore want good home for it.

Dodge Durango for Sale

Auto Services in Nevada

Yagers Garage ★★★★★

Auto Repair & Service
Address: 1430 US Highway 395 N, Gardnerville
Phone: (775) 782-8464

VIP Collision ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: 323 Sunpac Ct, Boulder-City
Phone: (702) 979-3133

Smog Xpress ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Inspection Stations & Services
Address: 1101 S Fort Apache Rd, Calico-Basin
Phone: (702) 254-9046

Sin City Wheels & Tires ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 3040 Simmons St, N-Las-Vegas
Phone: (702) 255-8473

Sierra Window Tinting ★★★★★

Auto Repair & Service, Window Tinting, Glass Coating & Tinting
Address: Lovelock
Phone: (775) 747-5942

Ryder Road Ready Used Vehicles ★★★★★

Used Car Dealers
Address: 4575 Statz Ct, Callville-Bay
Phone: (702) 708-1072

Auto blog

Stellantis and LG launch joint venture for North American battery plant

Mon, Oct 18 2021

Stellantis has struck a preliminary deal with battery maker LG Energy Solution (LGES) to produce battery cells and modules for North America, as the world's No. 4 automaker rolls out its 30 billion euro ($35 billion) electrification plan. Global automakers are investing billions of euros to accelerate a transition to low-emission mobility and prepare for a progressive phase-out of internal combustion engines. Stellantis and LGES's joint venture will produce battery cells and modules at a new facility with an annual capacity of 40 gigawatt hours (GWh), the two firms said on Monday. No financial details of the deal were provided. The plant is scheduled to start production by the first quarter of 2024, with groundbreaking expected in the second quarter of 2022, the companies said in their statement. Its location is under review and will be announced later. Stellantis, formed in January from the merger of Italian-American automaker Fiat Chrysler and France's PSA, has said it wants to secure more than 130 GWh of global battery capacity by 2025 and more than 260 GWh by 2030. The batteries produced under the deal will supply Stellantis' U.S., Canadian and Mexican assembly plants for installation in hybrid and fully electric vehicles, supporting its goal of e-vehicles making up more than 40% of its U.S. sales by 2030. The company, whose brands include Peugeot, Fiat, Opel and U.S. best-sellers Jeep and Ram, earlier this year announced it would invest more than 30 billion euros through 2025 on electrifying its vehicle lineup. Stellantis has said it would build three battery plants in Europe and two in North America, including at least one in the United States. Intesa Sanpaolo analyst Monica Bosio said the deal was positive, and a further step ahead in Stellantis' electrification process. It comes weeks after Stellantis and its partner TotalEnergies agreed to open up their battery cell joint venture ACC to Daimler, to expand their European sourcing of battery cells. Stellantis is also targeting more than 70% of sales in Europe to be of low-emission vehicles by 2030, and aims to make the total cost of owning an EV equal to that of a gasoline-powered model by 2026. Related video: Green Plants/Manufacturing Alfa Romeo Chrysler Dodge Ferrari Fiat Jeep Maserati RAM Citroen Lancia Opel Peugeot Vauxhall Electric Hybrid EV batteries LG

Dodge Hellcat Widebody delivers Christmas tree at 174 mph

Thu, Dec 21 2017

The holidays are here, and so last-minute shoppers are going to be in a serious rush to get all the items they need, especially Christmas shoppers that haven't even put up a tree yet. Those seriously late folks may want to invest in a Challenger Hellcat because apparently they can go an incredible 174 mph with a Christmas tree strapped to the roof. This was discovered by the folks at Hennessey. They got a Hellcat Widebody from Dodge for the little experiment, along with a suction cup mount roof rack from SeaSucker and a real Christmas tree from Lowe's. Then it was off to the Continental Tire test track in Texas to see how fast it could go, which, as mentioned was 174 mph. As you'll see in the video, it takes quite a bit of road to move up from 170 to 174 mph. It's impressive that the tree and roof rack don't seem to budge. And it's all capped off with a huge smokey burnout to the sound of V8 rumble and supercharger whine. It's a fun way to get into the holiday spirit. And we'll look forward to next year when maybe Dodge will give Hennessey a Demon to try out. Related Video:

FCA to invest $4.5B for new Detroit plant, expanded production at current facilities

Tue, Feb 26 2019

We expected some shifts in manufacturing plans as Fiat Chrysler plans to begin electrifying its Jeep brand, but this news bodes well for Michigan. FCA announced today that it would spend $4.5 billion to expand production in the state, including building a new assembly plant in Detroit and increasing capacity at five other facilities in the state. The plan, which FCA says will create nearly 6,500 new jobs, will help to meet increasing demand for Ram and Jeep products, and to electrify Jeep models. $1.6 billion will be set aside to transform the Mack Avenue Engine Complex into a site to build the next generation of Jeep Grand Cherokee, as well as an unspecified, new three-row Jeep model. FCA says this part of the plan will create 3,850 new jobs. FCA is increasing its investment in the Warren Truck plant to $1.5 billion in order to continue building the Ram 1500 Classic, as well as the new Jeep Wagoneer and Grand Wagoneer, creating 1,400 new jobs. FCA says that the new Ram 1500 Heavy Duty will still be built in Saltillo, Mexico. At FCA's Jefferson North facility, the automaker will invest $900 million to upgrade the plant. This site will continue to build the Dodge Durango, as well help build the next Jeep Grand Cherokee. FCA expects this to create 1,100 new jobs. As Jeep plans to electrify models in its SUV lineup, each of the above plants will produce plug-in hybrid versions of the Jeep models produced there, "with flexibility to build fully battery-electric models in the future," the company said in its announcement. "Three years ago, FCA set a course to grow our profitability based on the strength of the Jeep and Ram brands by realigning our U.S. manufacturing operations," said FCA CEO Mike Manley, referring in part to earlier investments in Illinois, Ohio and Michigan. "Today's announcement represents the next step in that strategy," Manley continued. "It allows Jeep to enter two white space segments that offer significant margin opportunities and will enable new electrified Jeep products, including at least four plug-in hybrid vehicles and the flexibility to produce fully battery-electric vehicles." Other investments include $119 million to move production of the 3.0-, 3.2- and 3.6-liter Pentastar engines from Mack I to the Dundee Engine Plant, and $400 million for increased capacity and 80 new jobs at the Sterling and Warren stamping plants. This comes at a time when FCA's U.S.