2014 Dodge Charger Sxt on 2040-cars
250 Auto Plaza Dr, Beckley, West Virginia, United States
Engine:3.6L V6 24V MPFI DOHC
Transmission:8-Speed Automatic
VIN (Vehicle Identification Number): 2C3CDXJG7EH281355
Stock Num: 4690
Make: Dodge
Model: Charger SXT
Year: 2014
Exterior Color: Pitch Black
Options: Drive Type: AWD
Number of Doors: 4 Doors
Mileage: 1
Special internet only price! You must mention this ad in order to receive the prices listed on this website. Prices not valid on prior sales.
Dodge Charger for Sale
2010 dodge charger sxt(US $17,686.00)
2013 dodge charger se(US $24,087.00)
2014 dodge charger se(US $33,125.00)
2014 dodge charger sxt(US $34,535.00)
2014 dodge charger sxt(US $37,685.00)
2014 dodge charger sxt(US $39,725.00)
Auto Services in West Virginia
Thumpin Car Stereo Inc ★★★★★
Saffford Chrysler Jeep Dodge ★★★★★
Roy`s Quality Car Care ★★★★★
Griff`s Auto ★★★★★
Fisher Auto Parts ★★★★★
City Cars ★★★★★
Auto blog
UAW workers strike at Stellantis casting plant in Indiana
Sat, Sep 10 2022DETROIT — United Auto Workers union members went on strike Saturday at the Stellantis casting plant in Indiana, citing health and safety issues including the company's alleged refusal to repair and replace the plantÂ’s air conditioning and heating systems. The 35-acre plant in Kokomo makes parts used in the powertrains of Chrysler, Dodge, Jeep and RAM vehicles and a long-term strike could affect vehicle assembly lines across North America. Stellantis says production had not been scheduled for this weekend and it hoped to resume negotiations as soon as possible on a contract with striking UAW Local 1166. In a statement, Stellantis said it was committed “to providing a safe and healthy work environment for all employees. After bargaining in good faith for two days and presenting an offer we believed addressed the unionÂ’s concerns, we are disappointed by the UAWÂ’s decision to walk out.” The 1,200-worker plant, Kokomo Casting, is the world's largest die cast facility, according to Stellantis. It makes aluminum parts for components including transmissions and engine blocks. The UAW local complained in a statement that Stellantis “claims it has no money to meet its membership's basic needs while ”making record profits and investing billions in a new battery plant across the street." UAW local president David Willis did not immediately return a phone call seeking comment. A person who answered the phone at union offices said he was preparing for a resumption in negotiations. The casting plant is to be retooled to produce engine blocks for hybrid-electric vehicles. In May, Stellantis announced a $2.5 billion joint venture with Samsung to build an electric vehicle battery factory in Kokomo that is to employ 1,400 workers. Stellantis, formed last year with the merger of Fiat Chrysler and FranceÂ’s PSA Peugeot, had said it would build two electric vehicle battery factories in North America. The other is slated for Windsor, Ontario. Plants/Manufacturing UAW/Unions Chrysler Dodge Jeep RAM
Jeep Grand Cherokee, Dodge Durango to lose color options temporarily
Wed, 19 Nov 2014In the market for a Jeep Grand Cherokee or Dodge Durango? Well, if you fancy a more expressive color for your new SUV, you'd better get your order in, or plan on waiting until well into 2015.
The SUVs will be limited to just four monochromatic shades - black, white, silver and gray - until at least February, thanks to an upgrade to the paint shop at the two vehicles' Jefferson North factory. For the Grand Cherokee, that means it's losing more than half its color palette while the Durango is dropping two-thirds of its color catalog.
The loss of colors is inconvenient, but the upgrade will have a slightly bigger effect on the overall supply of SUVs, as Chrysler will need to end its relentless build pace at the factory for a three-week shutdown starting on December 22. The good news for fans of the SUVs is that once the work is completed, we should see a gradual expansion of the color palettes for both the Durango and Grand Cherokee, beyond even what's offered now.
FCA, Ford idle plants due to semiconductor shortage
Fri, Jan 8 2021DETROIT (Reuters) - Ford and FCA will become the latest automakers to idle production facilities due to a semiconductor shortage. Ford's Louisville Assembly Plant in Kentucky will idle for a week, borrowing a down period from later in the year to compensate. Per Automotive News, FCA is idling its Brampton facility in Ontario, Canada, and one other site which has not yet been identified. Louisville Assembly is the production site for the Ford Escape and Lincoln Corsair SUVs; Brampton Assembly produces the Chrysler 300, Dodge Charger and Dodge Challenger for FCA. A Ford spokeswoman, who declined to identify the semiconductor supplier, confirmed the temporary shutdown to Reuters. In this, FCA and Ford join Nissan and potentially Honda in idling production in the wake of the shortage, which also hit Volkswagen late last year. The shortages are being blamed on consumer demand for silicon after production slowdowns resulting from the coronavirus pandemic. Volkswagen said it had to adjust production schedules in China, Europe and North America to compensate. Nissan said it planned to reduce production of the Note, a hybrid electric car, at its Oppama Plant in Kanagawa prefecture, Japan, but did not give details of the scale of the output cut. The Nikkei newspaper reported that Nissan would slash its Note production at Oppama to about 5,000 units in January, from an initially planned 15,000 units. "A global shortage of semiconductors has affected parts procurement in the auto sector. As a result of this shortage, the Oppama Plant in Japan will adjust production in January, reducing production of the Nissan NOTE," Nissan said in a statement. (This article contains reporting from Reuters.)   Auto News Plants/Manufacturing UAW/Unions Chrysler Dodge Ford










