Chrysler Town & Country Lx Handicap Van Power Ramp Low Miles on 2040-cars
Tifton, Georgia, United States
|
THIS VAN IS IN EXCELLENT CONDITION INSIDE AND OUT. HAS POWER RAMP, PW,PL,PW,PS AND CRUISE,GOOD TIRES, THE AIR RUNS COLD (NEW AIR 6 MONTHS OLD) HEATER HOT. IT DOES HAVE A COUPLE OF PAINT DINGS ON RAMP SIDE WHERE SOMEONE OPENED A DOOR, BUT OTHERWISE THE PAINT IS GREAT. WE HAVE HAD THIS VAN FOR OVER 3 YEARS AND IT HAS BEEN WELL MAINTAINED. THE ONLY REASON WE ARE SELLING IT IS THAT I CAN DRIVE NOW BUT NEED A TRANSFER SEAT. SO WE THOUGHT WE WOULD GO UP A FEW YEARS .FEEL FREE TO EMAIL ME ANY QUESTIONS.
|
Chrysler Town & Country for Sale
2005 chrysler town & country touring mint!(US $5,950.00)
2006 town & country super clean dvd nav one owner no reserve garaged condition
Touring ethanol - ffv 3.6l cd 6 speakers dvd-audio mp3 decoder radio data system
1968 chrysler town and country wagon
2011 chrysler town & country limited mini passenger van 4-door 3.6l(US $26,000.00)
Nice family van no reserve brand new tires, brakes, power door
Auto Services in Georgia
Young`s Upholstery & Seat Covers ★★★★★
Vic Williams Tire & Auto ★★★★★
United Auto Care ★★★★★
Unique Auto App ★★★★★
Ultimate Benz Service Center ★★★★★
Transmission For Less.Com ★★★★★
Auto blog
Which car companies are creating new jobs in America?
Fri, Sep 22 2017Since January, automakers have announced investments totaling $9.5 billion in U.S. plants, creating or retaining more than 12,000 jobs. Some of those companies have yet to announce just how many jobs will be created given their investments, with the location of many of those jobs still to be determined. Specifically, the 4,000-job Toyota-Mazda joint venture plant still hasn't announced its location, with numerous states jockeying for it. Hyundai has plans to invest $1 billion but has not announced a jobs number yet. And likewise Ford is investing $1.2 billion in Michigan without specifying a number of jobs. Volvo this week announced plans to add a second line to its factory under construction in South Carolina, spending another $500 million and adding 2,500 jobs to the 2,000 it was already trying to fill. Then Thursday, Daimler announced a $1 billion expansion to its facility in Tuscaloosa, Ala., to produce EV batteries and electric SUVs, a move that will add 600 jobs to its hiring this year. Above, we've created a handy pie chart showing you which companies have announced new jobs and how many there will be. Reporting by Paul Lienert in Detroit News Source: Reuters Plants/Manufacturing BMW Chrysler Ford GM Honda Hyundai Mazda Mercedes-Benz Toyota Volvo jobs
Here's what the UAW will be angling for in next year's contract negotiations
Mon, Dec 15 2014The United Auto Workers union is about to enter a new round of negotiations with the Detroit Three automakers, and this time, the focus is on the end of the two-tier wage system. Introduced in 2007, the two-tier wage system was enacted to allow General Motors, Ford and Chrysler to categorize its hourly employees under two categories: Tier 1 for veteran employees with full rights and benefits, and Tier 2 for short-term or entry-level employees compensated under a different schedule. The idea was that the system would permit the automakers to invest more in their plants and hire new employees as part of their respective recovery plans without being saddled with all the costs associated with hiring full-time employees. Now that the automakers are (more or less) back on their proverbial feet, however, the UAW wants to see an end to the two-tier system, and will likely make that a center-point of its negotiations next year to replace the current arrangement that is scheduled to end in September 2015. Not all members of the UAW will necessarily be interested in ending the two-tier system, however. According to The Detroit News, some Tier 1 workers may be more interested in negotiating a raise in their hourly rate – something which they haven't received in almost a decade. Tier 2 workers, meanwhile, may be more motivated to keep the tiered system in place, as their arrangement includes provisions for profit-sharing payments that have seen the automakers pay out billions to so-called short-term employees in lump-sum payments. Reconciling the two competing demands from two categories of union members and presenting a united front in negotiations may prove the biggest challenge for the UAW's new president, Dennis Williams. And with the right to strike – something which was suspended during the last round of negotiations in 2011 – the union has a bigger bargaining chip in its pocket.
Inline-6 Hemi replacement on the cusp of production from Stellantis
Thu, Dec 30 2021It appears that Stellantis is ready to put its long-rumored inline-six into production at its Saltillo, Mexico plant, possibly marking the beginning of the end of Chrysler's long-running 5.7L Hemi V8. But so far, the automaker's American brands have remained mum on where exactly the new turbocharged "Tornado" I6 may land. Stellantis powertrain blog Stellpower (by way of Muscle Cars & Trucks) spotted an entry for a new "GME T6" inline-six engine on the Saltillo facility's web site, suggesting that it was either in production or close to it. That entry has since been removed, but the mystery remains. We've been hearing tidbits here and there about this new inline engine for years, but this is the first time we've seen anything suggesting its arrival is imminent. Usually, such a significant powertrain update would coincide with the launch of a new product to showcase it. So far, Stellantis has remained mum, even overseas, about where this engine is destined to reside. 2022 model year vehicles are likely off the table entirely. But while it's common for new engines to debut with new cars and trucks, it's not a universal truth. Ford's Coyote V8 missed the corresponding Mustang refresh by a year, for example, orphaning the 2010 model and its much-needed styling updates with the old 4.6L V8 (and the 3.8L V6, for that matter; the 3.7L Duratec was also late to that party). Even sticking just to Stellantis, the JL Wrangler's powertrains have been a work in progress since it arrived back in 2018. The standard V6 and 2.0-liter turbo-4 debuted at launch; the EcoDiesel, 392 and 4xe all came later. And 4xe may be the model by which to measure our expectations. Its introduction didn't come completely out of nowhere, but it was rather sudden for what turned out to be such a solid offering. That bodes well for the company's existing Hemi-powered trucks and SUVs. The Ram 1500, Jeep Grand Cherokee and Wagoneer are all strong candidates to receive the new Hemi replacement, as all would greatly benefit from even small improvements in fuel economy. If there's to be a future for the Dodge Charger and Challenger and Chrysler 300, they'd benefit too. And how about a Gladiator with the wick turned up, positioned as its equivalent to the Wrangler 392. Turn that Tornado into a Dust Devil. Don't worry; we've got plenty more where that came from. Related Video This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.








