Find or Sell Used Cars, Trucks, and SUVs in USA

Automatic, 2.4 Turbo, Convertable, Runs Great, Power Windows on 2040-cars

US $7,400.00
Year:2005 Mileage:133211 Color: White /
 Black
Location:

Phoenix, Arizona, United States

Phoenix, Arizona, United States
Advertising:
Transmission:Unspecified
Vehicle Title:Clear
Engine:2.4L 2429CC 148Cu. In. l4 GAS DOHC Turbocharged
For Sale By:Dealer
Body Type:Convertible
Fuel Type:GAS
VIN: 3c3ey55e15t562682 Year: 2005
Make: Chrysler
Warranty: Vehicle has an existing warranty
Model: PT Cruiser
Trim: Touring Convertible 2-Door
Options: CD Player, Convertible
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows
Drive Type: FWD
Mileage: 133,211
Number of Doors: Generic Unit (Plural)
Sub Model: 2dr Converti
Exterior Color: White
Number of Cylinders: 4
Interior Color: Black
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Arizona

yourcarguyaz.com ★★★★★

Used Car Dealers
Address: Tempe
Phone: (480) 495-2972

VW & Audi Independent Service and Repair Specialist ★★★★★

Auto Repair & Service
Address: 3800 N 7th St, Glendale-Luke-Afb
Phone: (602) 234-9783

USA Auto Glass Repair ★★★★★

Auto Repair & Service, Windshield Repair, Glass-Auto, Plate, Window, Etc
Address: 1900 W Chandler Blvd, Sun-Lakes
Phone: (480) 648-0888

Truck And Trailer Parts Incorporated ★★★★★

Automobile Parts & Supplies, Truck Equipment & Parts, Automobile Accessories
Address: 2702 N Flowing Wells Rd, Oro-Valley
Phone: (520) 623-3663

Tony`s Auto Repair ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 4834 N 35th Ave, Glendale-Luke-Afb
Phone: (602) 973-5050

TintAZ.com Mobile Window Tinting ★★★★★

Auto Repair & Service, Window Tinting, Coatings-Protective
Address: Kearny
Phone: (480) 244-8468

Auto blog

Chrysler Town & Country plug-in hybrid minivan coming in 2015

Mon, 06 Oct 2014

Among the multitude of models that Fiat Chrysler Automobiles announced as part of its five-year production plan in May was a plug-in hybrid version of the Town & Country minivan for sometime in 2016. However, according to the latest pronouncement from company CEO Sergio Marchionne, that timetable may have been moved forward quite a bit.
Marchionne told Automotive News at the Paris Motor Show that the PHEV minivan would now be launching in late 2015. That strategy does seem a bit confusing, though, because the next-gen platform for the T&C isn't supposed to hit the road until sometime in 2016, according to the plan. So it's not clear whether the boss means the PHEV rides on the current chassis or if the new model is going on sale early.
The technology underpinning the new plug-in hybrid has been shrouded in mystery. However, during the five-year plan meeting, FCA claimed the model could earn fuel economy figures around 75 mpge. Chrysler previously tested a 25-unit fleet of them as part of a demonstration test in Auburn Hills, MI, in 2012, but that didn't go so well.

FCA and UAW deal could mean huge production shakeups

Thu, Sep 17 2015

The big labor contract between Fiat Chrysler Automobiles and the United Auto Workers is likely to lead to some very serious production shakeups across the company's North American manufacturing operations. That's according to a new report from Automotive News, which details the sweeping changes at no fewer than five production facilities in Michigan, Illinois, Ohio, Mexico, and Poland. So without further ado, here's what's going where, presented in easy to digest bullet form. Ram 1500 production would move from Warren, MI to Sterling Heights, MI Warren, MI would be retooled for unibody production and would handle the Jeep Grand Wagoneer and could potentially build Grand Cherokees to ease the strain on Detroit's Jefferson North factory Chrysler 200 production would move from Sterling Heights, MI to Toluca, Mexico Dodge Dart production would move from Belvidere, IL to Toluca, Mexic Fiat 500 production, which is currently handled by Toluca, would be concentrated in Poland, where the Euro-spec Cinquecento is built Jeep Cherokee production would move from Toledo, OH to Belvidere, IL to make room for Wrangler and Wrangler Pickup production Like we said, those are some big changes. But, as FCA CEO Sergio Marchionne said in an earlier interview with Automotive News, this kind of shakeup would make a lot of sense. In that August interview the exec said that automakers moved truck production to Mexico because they were "threatened" by the UAW. "The only thing [the UAW] want is to move the truck back. Which is right. If you move the truck back here, which is [the UAW's] domain, [and move] all the cars that we get killed on somewhere else, we could actually make sense of this bloody industry and actually increase the number of people employed in this country and really share wealth because we are making money," Marchionne told AN. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing UAW/Unions Chrysler Dodge Fiat Jeep RAM Sergio Marchionne FCA toluca warren sterling heights

Chrysler investing $20M in Toledo plant to support 9-speed auto production

Sun, 28 Apr 2013

In 2011, Chrysler announced a $72-million investment in its Toledo Machining Plant to modernize production of the eight- and nine-speed torque-converters for automatic transmissions made there. That upgrade work won't be finished until Q3 of this year, but Chrysler has already announced a further $19.6-million investment to increase production capacity for the nine-speeders.
The extra units will be necessary because the nine-speed transmission they'll be mated to is going into three popular models: it will debut on the 2014 Jeep Cherokee, then go into the Chrysler 200 and Dodge Dart. The company predicted that this year alone it would sell 200,000 units equipped with the nine-speed tranny, and it is spending some $374 million in addition to the investment in Toledo to upgrade production capacity for it.
The work attached to this new investment won't begin until Q3 of 2014, and it will be finished by the end of that year. There's a press release below with all the details.