Find or Sell Used Cars, Trucks, and SUVs in USA

1982 Chrysler Imperial Fuel Injection Look on 2040-cars

Year:1982 Mileage:53611
Location:

Westminster, Colorado, United States

Westminster, Colorado, United States
Advertising:

Auto Services in Colorado

Weissach Performance ★★★★★

Auto Repair & Service, Automobile Diagnostic Service, Truck Service & Repair
Address: Pierce
Phone: (303) 444-7210

We are West Vail Shell ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Towing
Address: Marble
Phone: (888) 425-9820

Vanatta Auto Electric ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Electric Service
Address: 1981 8th St, Superior
Phone: (855) 226-0713

Tanner 4x4 Inc. ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Parts & Supplies-Used & Rebuilt-Wholesale & Manufacturers
Address: 1920 E Pikes Peak Ave, Fountain
Phone: (719) 475-8057

Sundance Automotive ★★★★★

Auto Repair & Service, Automotive Tune Up Service, Automobile Consultants
Address: 10110 W 26th Ave Ste B, Lakewood
Phone: (303) 445-8869

Steffen Automotive ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: Snyder
Phone: (970) 483-6357

Auto blog

Ford delays North American production restart from coronavirus lockdown

Tue, Mar 31 2020

Ford said on Tuesday it was postponing its plan to restart production at its North American plants due to safety concerns for its workers amid the coronavirus pandemic. To generate cash, the No. 2 U.S. automaker had said last week it was poised to restart production at some plants in North America as early as April 6, bringing back such profitable vehicles as its top-selling F-150 full-sized pickup, the Transit commercial van and SUVs. But on Tuesday, Ford said it had been aiming to resume production at several key U.S. plants on April 14, but would now instead do so at dates it would announce later on. "The health and safety of our workforce, dealers, customers, partners and communities remains our highest priority," Kumar Galhotra, president of Ford's North American operations, said in a statement. Still, the automaker will open a plant in Ypsilanti, Michigan, during the week of April 20, that will make ventilators to treat patients afflicted by the coronavirus. Rival Fiat Chrysler Automobiles said last week it plans to resume production in North America on April 13. General Motors has shuttered its plants indefinitely and has not provided a date for vehicle production to restart. It is facing a delay in the production launch of its redesigned large SUVs and is delaying work on other SUVs. "Once it is safe to resume production, we will do so," a GM spokesman said. As of Monday, Volkswagen was shooting for an April 5 reopening at its Tennessee plant. Honda, Nissan and Subaru facilities in North America will remain closed through April 6, and Hyundai through April 10. Toyota was planning to reopen its North American plants April 17. Plants/Manufacturing Chrysler Fiat Ford GM coronavirus

Stellantis invests more than $100 million in California lithium project

Thu, Aug 17 2023

Stellantis said it would invest more than $100 million in California's Controlled Thermal Resources, its latest bet on the direct lithium extraction (DLE) sector amid the global hunt for new sources of the electric vehicle battery metal. The investment by the Chrysler and Jeep parent announced on Thursday comes as the green energy transition and U.S. Inflation Reduction Act have fueled concerns that supplies of lithium and other materials may fall short of strong demand forecasts. DLE technologies vary, but each aims to mechanically filter lithium from salty brine deposits and thus avoid the need for open pit mines or large evaporation ponds, the two most common but environmentally challenging ways to extract the battery metal. Stellantis, which has said half of its fleet will be electric by 2030, also agreed to nearly triple the amount of lithium it will buy from Controlled Thermal, boosting a previous order to 65,000 metric tons annually for at least 10 years, starting in 2027. "This is a significant investment and goes a long way toward developing this key project," Controlled Thermal CEO Rod Colwell said in an interview. The company plans to spend more than $1 billion to separate lithium from superhot geothermal brines extracted from beneath California's Salton Sea after flashing steam off those brines to spin turbines that will produce electricity starting next year. That renewable power is expected to cut the amount of carbon emitted during lithium production. Rival Berkshire Hathaway has struggled to produce lithium from the same area given large concentrations of silica in the brine that can form glass when cooled, clogging pipes. Colwell said a $65 million facility recently installed by Controlled Thermal can remove that silica and other unwanted metals. DLE equipment licensed from Koch Industries would then remove the lithium. "We're very happy with the equipment," he said. "We're going to deliver. There's just no doubt about it." Stellantis CEO Carlos Tavares called the Controlled Thermal partnership "an important step in our care for our customers and our planet as we work to provide clean, safe and affordable mobility." Both companies declined to provide the specific investment amount. Controlled Thermal aims to obtain final permits by October and start construction of a commercial lithium plant soon thereafter, Colwell said. Goldman Sachs is leading the search for additional debt and equity financing, he added.

FCA, Ford idle plants due to semiconductor shortage

Fri, Jan 8 2021

DETROIT (Reuters) - Ford and FCA will become the latest automakers to idle production facilities due to a semiconductor shortage. Ford's Louisville Assembly Plant in Kentucky will idle for a week, borrowing a down period from later in the year to compensate. Per Automotive News, FCA is idling its Brampton facility in Ontario, Canada, and one other site which has not yet been identified.  Louisville Assembly is the production site for the Ford Escape and Lincoln Corsair SUVs; Brampton Assembly produces the Chrysler 300, Dodge Charger and Dodge Challenger for FCA.  A Ford spokeswoman, who declined to identify the semiconductor supplier, confirmed the temporary shutdown to Reuters. In this, FCA and Ford join Nissan and potentially Honda in idling production in the wake of the shortage, which also hit Volkswagen late last year. The shortages are being blamed on consumer demand for silicon after production slowdowns resulting from the coronavirus pandemic. Volkswagen said it had to adjust production schedules in China, Europe and North America to compensate.  Nissan said it planned to reduce production of the Note, a hybrid electric car, at its Oppama Plant in Kanagawa prefecture, Japan, but did not give details of the scale of the output cut. The Nikkei newspaper reported that Nissan would slash its Note production at Oppama to about 5,000 units in January, from an initially planned 15,000 units. "A global shortage of semiconductors has affected parts procurement in the auto sector. As a result of this shortage, the Oppama Plant in Japan will adjust production in January, reducing production of the Nissan NOTE," Nissan said in a statement. (This article contains reporting from Reuters.)     Auto News Plants/Manufacturing UAW/Unions Chrysler Dodge Ford