2009 Chevrolet Silverado 2500 Ltz on 2040-cars
3891 S Post Rd, Indianapolis, Indiana, United States
Engine:6.6L V8 32V DDI OHV Turbo Diesel
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1GCHK69609E140489
Stock Num: P4774
Make: Chevrolet
Model: Silverado 2500 LTZ
Year: 2009
Exterior Color: Black
Options: Drive Type: 4WD
Number of Doors: 4 Doors
Mileage: 41550
As much as it alters the road, this ready LTZ transforms its driver* This Vehicle has less than 42k miles* This car sparkles! 4 Wheel Drive.. Safety Features Include: ABS, Passenger Airbag - Cancellable, Daytime running lights, Dusk sensing headlights...Comes equipped with all the standard amenities for your driving pleasure: Auto, Tilt steering wheel, 4x4, 4 Doors, Tachometer... We have helped thousands get the vehicle they want, even if your credit is less than perfect. Shop us first, shop us last, just make sure you shop us. Get Pre-Approved today at www.rayskillmanapproved.com
Chevrolet Silverado 2500 for Sale
2014 chevrolet silverado 2500 lt(US $44,264.00)
2013 chevrolet silverado 2500 lt(US $35,990.00)
2011 chevrolet silverado 2500 ltz(US $36,990.00)
2015 chevrolet silverado 2500 lt(US $43,206.00)
2015 chevrolet silverado 2500 lt(US $44,830.00)
2015 chevrolet silverado 2500 lt(US $44,830.00)
Auto Services in Indiana
West Side Auto Collision ★★★★★
V R Auto Repairs ★★★★★
Tri State Battery Supply ★★★★★
Tony Kinser Body Shop ★★★★★
Stanfa Tire & Auto ★★★★★
Speed Shop Motorsports ★★★★★
Auto blog
GM's redesigned full-size 2021 SUVs face delay over coronavirus
Tue, Mar 31 2020As General Motors works to conserve cash for the coronavirus pandemic, the automaker reportedly told suppliers that it is postponing development of several future vehicles. The situation may cause GM to delay the launch of the 2021 Cadillac Escalade, GMC Yukon, Chevrolet Tahoe and Chevrolet Suburban SUVs, which had been planned to roll out in April. The original launch plan for the redesigned full-size SUVs, which are some of the most profitable vehicles produced by GM, had called for production of the current models to end at its plant in Arlington, Texas, this week. After a retooling process, the redesigned SUVs were slated to begin production late in the month of April. In an email to suppliers viewed by Reuters and confirmed as authentic by GM, the automaker also said it was suspending development work on six future vehicle programs, including updates of the Chevrolet Equinox, GMC Terrain, Cadillac XT4, Bolt EV, Chevrolet Silverado and GMC Sierra. GM said preproduction work on those programs would be pushed back to calendar year 2021, with most of the updated vehicles scheduled to be launched as 2022 models. According to the Detroit News, work has also been paused on the Chevy Camaro and a future version of the Corvette that has yet to be unveiled and wasn't planned for production during the 2020 calendar year. Last week, the automaker told employees and suppliers it was delaying work on some future vehicles while pushing ahead with near-term models such as its redesigned full-size SUVs and the GMC Hummer EV, Cadillac Lyriq, Chevrolet Bolt EUV and Cruise Origin, as well as its new Ultium battery system. A GM spokesman who spoke with Reuters reiterated on Monday what the automaker had said last week — that the situation with its U.S. plants was "fluid" and that the automaker would "continue to evaluate" whether and when to reopen those plants on a week-by-week basis, with "employee safety" guiding that decision. GM said previously that it was closing most of its U.S. plants indefinitely. In its Monday email, GM asked suppliers to stop work on all pre-production tooling and pre-production parts manufacturing, but also not to dispose of any tooling or materials. GM told Reuters it had solicited volunteers from its workforce to finish the build-out of the current SUVs on a single shift in Arlington.
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.
GM to sink over $900M into 4 plants, mostly for a new V8
Fri, Jan 20 2023FLINT, Mich. — General Motors says it will spend more than $900 million to update four factories, with the bulk going to an engine plant in Flint, Michigan, to build the next-generation V8 for big pickup trucks and SUVs. Factories in Rochester, New York; Defiance, Ohio; and Bay City, Michigan, also will see investments, some to make V8 engine components as well as parts for future electric vehicles, the company said Friday. The investments won't create any new jobs, but they will preserve about 2,400 hourly and salaried positions positions at the four sites, the company said. The investments “provide job security at these plants for years to come,” Gerald Johnson, GM's manufacturing chief, said in a statement. Much of the money, $579 million, will go to Flint Engine Operations for equipment to build the sixth-generation small-block V8 that will go into the next round of big pickup trucks and SUVs. The plant now employs about 700 people who also will keep making their current product, a diesel engine used in light trucks. GM, like other automakers, is facing stricter government fuel economy standards and pollution limits starting in the 2024 model year. New vehicles sold in the U.S. will have to average at least 40 miles per gallon of gasoline in 2026, up from about 28 mpg, under new Biden administration rules that undo a rollback of standards enacted under former President Donald Trump. That means the new V8 will have to get better mileage and pollute less than the current versions. Although GM wouldn't release details on the new engine, Johnson said during a news conference at the Flint plant that it would be more efficient than the current version. GM has a goal of selling only electric passenger vehicles by 2035, but Johnson said that's a dozen years out, a period when many customers will still want gas engines. “We know that has a horizon,” he said. “Between here and there, there are a lot of internal combustion customers that we don't want to lose,” he said. In addition to Flint, GM's engine components plant in Bay City, Michigan, will get $216 million to build camshafts and connecting rods, and to machine engine blocks and heads for the new V8 being built in Flint. The plant now employs about 425. The Defiance, Ohio, foundry will get $55 million to build a variety of block castings for the new V8. Included is $8 million for castings to support future electric vehicles, the company said. The plant has about 530 employees.
















