2014 Chevrolet Silverado 1500 Lt on 2040-cars
285 W Elm St, Lebanon, Missouri, United States
Engine:5.3L V8 16V GDI OHV
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 3GCUKREC3EG501728
Stock Num: LT5020
Make: Chevrolet
Model: Silverado 1500 LT
Year: 2014
Exterior Color: Summit White
Interior Color: Jet Black
Options: Drive Type: 4WD
Number of Doors: 4 Doors
Mileage: 1
Chevrolet Silverado 1500 for Sale
2014 chevrolet silverado 1500 ltz(US $48,839.00)
2014 chevrolet silverado 1500 high country(US $49,905.00)
2014 chevrolet silverado 1500 lt(US $35,525.00)
2014 chevrolet silverado 1500 lt(US $38,585.00)
2014 chevrolet silverado 1500 lt(US $38,585.00)
2014 chevrolet silverado 1500 lt(US $39,481.00)
Auto Services in Missouri
Wicked Stickers ★★★★★
Vietti Collision Center ★★★★★
Valvoline Instant Oil Change ★★★★★
Team 1 Auto Body & Glass ★★★★★
Talley`s Collision Repair Service ★★★★★
Tallant`s Auto Body & Hot Rod Shop ★★★★★
Auto blog
UAW rejects GM contract proposal but makes a counter offer
Tue, Oct 1 2019The United Auto Workers union said a new comprehensive offer made by General Motors Co late Monday to end a two-week-old strike was not acceptable and said it had made a new counterproposal. UAW vice president Terry Dittes said in a letter to members "there are many important issues that remain unresolved." The union is awaiting GM's next proposal. He said GM's offer came up short on many issues. Dittes said GM made a "comprehensive proposal" at 9:40 p.m. Monday. "This proposal that the company provided to us on day 15 of the strike did not satisfy your contract demands or needs. There were many areas that came up short like health care, wages, temporary employees, skilled trades and job security to name a few." Dittes is the union's vice president for GM relations and the UAW's lead negotiator in these contract talks. "We have responded today with a counterproposal and are awaiting GM's next proposal to the union," he wrote. "Regardless of what is publicized in print or social media, etc., there are still many important issues that remain unresolved." The strike, in its third week, has cost GM more than $1 billion, according to J.P. Morgan analyst Ryan Brickman. He said the cost per day in potential profit is $82 million. However, another analysis, by East Lansing-based consultant Anderson Economic Group, put the losses at $25 million a day. And the effects of the strike are expanding. GM said Tuesday the strike has created a parts shortage that forced the automaker to halt production at its pickup and transmission plants in Silao, Mexico, temporarily laying off 6,000 workers. Silao is where GM builds its highly profitable four-door crew cab Chevy Silverado and GMC Sierra pickups. The strike has also forced GM to idle some Canadian workers, and many suppliers have been forced to halt operations. About 48,000 UAW members went on strike on Sept. 16 seeking higher pay, greater job security, a bigger share of the leading U.S. automaker’s profit and protection of their healthcare.Â
GM delaying additional Silverado EV and Sierra EV production to Q4 2025
Tue, Oct 17 2023This looks like more "Gotcha!" news about storms in the EV sector, but the word "additional" is key here. The Detroit News reported today that GM is pushing delaying production of the Chevrolet Silverado EV and GMC Sierra EV pickups at the Orion Assembly Plant to late 2025, about a year behind expectations. The Silverado EV Work Truck is already in production at GM's Factory Zero in Detroit, which won't change. Retail versions of the Silverado EV are still planned for production at Factory Zero before the end of this year, and the Sierra EV is expected to enter production at Factory Zero early next year. This new plan simply means GM won't add more production of those electric trucks at Orion. GM builds the Chevrolet Bolt at Orion right now, assembly of that groundbreaking car to end this year. GM's original idea was to spend $4 billion to convert Orion to EV pickup production in time to get its two giant profit makers rolling down lines in early 2025. The move to late 2025 could mean the plant is out of commission for about two years. The facility's 1,261 employees are being offered spots in other plants, including Factory Zero. The automaker gave several reasons for the move, a spokesperson telling The Detroit News the company wants "to better manage capital investment while aligning with evolving EV demand," and telling the Detroit Free Press, "We're looking at EV demand and the trendline for EVs is stabilizing. ... It is not rising as fast as originally forecasted." On top of that, engineers "have identified engineering improvements that we will implement to increase the profitability of our products." The spokesperson also made it clear that the delay has nothing to do with the UAW strike, now in its 32nd day. Factory Zero's working up to a near-term production capacity of about 600,000 units annually, GM saying it wanted to get capacity to 1 million EVs annually by the end of 2025. At the moment, the site builds the Silverado EV Work Truck, the GMC Hummer EV pickup and SUV, and the Cruise Origin shuttles — not the Bolt taxis, the autonomous pods. The Detroit News reported GM sold 18 Silverado EV Work Trucks in Q3 this year, GM Authority says GMC Hummer EV production has ramped up to about 3,000 units per month, and Cruise Origin is still waiting on approval from the National Highway Safety Traffic Administration to mass-produce the autonomous shuttles because the shuttles need an exemption for not having steering wheels.
Recharge Wrap-up: Long Beach ePrix, London's new electric buses
Tue, Jul 21 2015London will put 51 new electric buses into service. With the addition of these buses, two more routes (in addition to one already in operation) will be all-electric. Transport for London plans to have all of central London's 300 single-decker buses running on electricity or hydrogen by 2020. "The expansion of London's electric bus fleet demonstrates our commitment to reducing emissions from public transport in London," says Deputy Mayor of London for Environment and Energy, Matthew Pencharz. "The Ultra Low Emission Zone that will be introduced in 2020 is the most ambitious measure of its kind taken to tackle air pollution anywhere in the world, and it will transform our bus fleet into a cleaner, greener and more pleasant way of travelling for Londoners." Read more from Transport for London, and from Green Car Congress. The Chevrolet Volt is subject to a tie-rod recall. Along with 10 Cruze vehicles, one 2015 Volt has been recalled because of a tie rod that might not have been tightened to the steering gear correctly, which could lead to a loss of steering control. Chevrolet will replace the steering gear assembly, supplied by Robert Bosch Automotive Steering, for free. There have been no reported injuries from this issue. Read more at Detroit News. The Formula E Long Beach ePrix will take place on April 2, 2016. For the second season of the electric racing series, Long Beach is the only confirmed US host, as the spot on the calendar previously held by Miami still remains to be determined. More than 20,000 fans attended the inaugural Long Beach ePrix earlier this year, where Nelson Piquet, Jr. took first place before going on to win the Drivers' Championship. "It's extremely exciting to welcome the ePrix back to Long Beach for a second year," says Long Beach Mayor Robert Garcia, "and we are hopeful that this demonstration of innovation, sustainability, and cutting edge technology will return to our city year after year." Read more in the press release below. Related Video: LONG BEACH ePRIX TO RETURN APRIL 2, 2016 (July 14, 2015) – The Long Beach ePrix will return to the city streets on Saturday, April 2, 2016. The FIA (Federation Internationale de l'Automobile) World Motor Sport Council recently approved the calendar for the second season of the FIA Formula E Championship, with Long Beach scheduled as the sixth of 11 rounds in the series. Overall, 10 venues will host Formula E events, with the 2015-16 season beginning once again in Beijing on Oct. 17.
