Find or Sell Used Cars, Trucks, and SUVs in USA

1970 Chevrolet Nova Zz 502 Deluxe Crate Engine, Muncie 4-speed With Gear Vendors on 2040-cars

US $5,000.00
Year:1970 Mileage:6423 Color: Silver /
 Black
Location:

Clearwater, Florida, United States

Clearwater, Florida, United States
Advertising:
Engine:502 V8
For Sale By:Dealer
Transmission:Manual
Vehicle Title:Clean
Year: 1970
VIN (Vehicle Identification Number): 114270W101811
Mileage: 6423
Exterior Color: Silver
Interior Color: Black
Make: Chevrolet
Manufacturer Exterior Color: Silver
Manufacturer Interior Color: Black
Model: Nova
Trim: ZZ 502 Deluxe Crate Engine, Muncie 4-Speed with Gear Vendors
Warranty: Vehicle does NOT have an existing warranty
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto Services in Florida

Zeigler Transmissions ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 149 Stevens Ave, Safety-Harbor
Phone: (813) 891-6776

Youngs Auto Rep Air ★★★★★

Auto Repair & Service
Address: 2600 S Hopkins Ave, Sharpes
Phone: (321) 567-4900

Wright Doug ★★★★★

Automobile Parts & Supplies, Glass-Auto, Plate, Window, Etc, Automobile Accessories
Address: Sharpes
Phone: (321) 795-4145

Whitestone Auto Sales ★★★★★

New Car Dealers, Used Car Dealers
Address: 240 N Wabash Ave, Wahneta
Phone: (863) 686-3385

Wales Garage Corp. ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Oil & Lube
Address: 2916 SE 6th Ave, Lauderdale-Lakes
Phone: (954) 763-5506

Valvoline Instant Oil Change ★★★★★

Auto Repair & Service, Auto Oil & Lube, Automotive Tune Up Service
Address: 7400 Ridge Rd, Bayonet-Point
Phone: (727) 844-0740

Auto blog

Weekly Recap: Lamborghini to build SUV

Sat, May 30 2015

Finally, Lamborghini will build a sport utility vehicle. The Italian supercar maker confirmed this week that it will launch a luxury SUV in 2018. It will be built at Lamborghini's soon-to-expand factory in Sant'Agata Bolognese in Italy, and will double the company's current sales volume. Lamborghini did not announce a name for the vehicle or other details, but noted a concept version, the Urus, was displayed at the Beijing motor show in 2012. It will be sold around the world, but it's expected to be a critical offering in the United States, China, and the Middle East. The automaker projects the SUV will sell about 3,000 units per year, and it will be the third product in Lamborghini's portfolio. It currently sells the Huracan and Aventador supercars. "The introduction of a third model line endorses the stable and sustainable growth of the company and signifies for us the beginning of a new era," Lamborghini chief executive Stephan Winkelmann said in a statement. The project is also a boon for Italy, which will get 500 new jobs in the Emilia Romagna region as Lamborghini's factory will nearly double in size. Ian Fletcher, principal analyst for IHS Automotive, said the SUV will position Lamborghini for future growth. "It could well also bring new customers to the brand [who] may find the dramatic styling of Lamborghini products appealing, but find its typical sports cars restrictive," he said. "If it is a success, the SUV could be a catalyst to Lamborghini broadening its portfolio further." OTHER NEWS & NOTES GM invests in Chevy Camaro factory General Motors is investing $175 million to upgrade its factory in Lansing, MI, to build the 2016 Chevy Camaro. The investment will pay for new tooling and equipment. The improvements include three new paint systems and two new robotic framers. GM will add a second shift at the factory to build the Camaro, resulting in 500 jobs. The automaker had dropped the plant to one shift last year amid slow sales for its products, the Cadillac ATS and CTS. GM is spending $5.4 billion over the next three years to upgrade its US facilities. Last week, GM announced plans to spend $439 million to build a new paint shop for the Chevy Corvette. While the Camaro and Corvette plant improvements are intriguing to enthusiasts, GM also confirmed this week that it is investing $1.2 billion in its Fort Wayne (IN) factory that builds trucks.

Next Chevy Volt will be 2016 model and ride on new chassis

Fri, Mar 7 2014

What do we know about the 2016 Chevy Volt? Well, for now, all we can do is try to put the puzzle together without the box. Thankfully, a new batch of pieces has arrived from a new report in Edmunds, which says that the 2016 model year will introduce the second generation of a car that hasn't been dramatically updated since it went on sale in 2010. The new Volt is getting an "evolutionary styling change" and will ride on a new front-drive platform that has been developed by General Motors. GM's Kevin Kelly told AutoblogGreen that he has "no comment on future products," but he did acknowledge that Chevrolet is working on a second-generation Volt, "but I can't say anything about timing." Everybody already knew that a next-gen Volt is coming, so that's not a surprise. What we don't know is any real concrete information on the car itself. The few tidbits of information we do have help define the outlines of the next version of Chevy's halo car, but they're not confirmed yet. For the record, they range from the eye-raising (a $10,000 price drop) to the logical (20 percent more electric range). We can't see the whole picture yet, but the pieces do point to the 2016 Volt, which would be released next year sometime, being a much bigger deal than the last update, when the Volt's range was increased by three electric miles thanks to a battery capacity increase of 16 kWh to 16.5.

Mysterious white powder discovered at GM Orion Assembly

Fri, Sep 2 2016

Workers at General Motors Orion Assembly Plant in Orion Township, MI uncovered a mysterious white powder in two different parts of the factory earlier this week, raising concerns about worker safety. "We can confirm that an unknown substance (white powder) was found on the floor outside of Gate 6 at Orion Assembly on Monday, August 29. On Tuesday, August 30, we had a second report of a bottle containing a similar substance found inside the plant," GM spokesperson Dayna Hart told The Oakland Press via email. GM stressed that incident didn't disrupt operations at the plant, and that the company was taking steps to ensure the safety of the sprawling factory's workers. That did include, an anonymous worker told The Oakland Press, closing off parts of the factory for two full days, as drug-sniffing dogs and crews in haz-mat suits descended on the area. "A sample of the substance has been sent to a laboratory for identification and results are expected later this week," Hart said. "All findings and actions have been shared with our employees." Orion Assembly currently builds the Chevrolet Sonic and Buick Verano, and will eventually be responsible for production of the new, all-electric Chevy Bolt early next year. Related Video: